AEWORLDMAP.COM (3,300+ posts)

Step Up on 5th– Santa Monica, California, U.S.

Posted in Built by Fan Feng on September 1, 2010

Building: Step Up on 5th
Completion Time: 2009
Architect: Pugh + Scarpa Architects
Structural Engineer: JAMA
MEP Engineer: IBE
General Contractor: Ruiz Brothers

AE Interest: 75% recycling rate in overall project, custom water jet anodized aluminum panels on the main façade, double-pane windows, insulation made from recycled newspapers, water-saving dual flush toilets

Leave a comment