Lebron James Innovation Center – Beaverton, Oregon, U.S.

Name: Lebron James Innovation Center
Location: Beaverton, Oregon, U.S.
Address: 1 Bowerman Dr, Beaverton, OR 97005 United States
General Contractor: Mortenson Construction
Design Architect: Olson Kundig Architecture
Executive Architect: Tom Kundig
MEP Engineering: Studio Matthews
Civil Engineering: WSP
Structural Engineer: NV5
Completion: 2020
AE Interests: The waffle slab design. The MEP sustainability throughout the building. Open and collaborative design. Use of shade screens and renewable energy.
Wetland Research and Education Center – Shanghai, China
Name: Wetland Research and Education Center
Location: Shanghai, China
Address:Shanghai Chongming Dongtan National Nature Reserve, Shanghai, China
Project Architects: Yanlin Jin, Yue Xu
Structure Design: Zhun Zhang
General Contractor: Shanghai Hydraulic Engineering Group Co. Ltd.
Structure Consultant: AND Office for Architecture & Structure
Completion: 2019
AE Interests: Y cantilever structure present throughout the project. Saw-tooth roofs and differentiation of structural plan and height. Weather-proof and maintenance in an area with high humidity and salinity conditions, and the different concrete structures used in each building.
leave a comment