Adonis Golf Club Clubhouse – Yangsan, South Korea
Building: Adonis Golf Club Clubhouse
Location: Yangsan, South Korea
Completed: 1999
Architect: John Friedman Alice Kimm Architects
AE interests: large, glass facade allows lighting by natural sunlight; tilted roof;
Dong Heon – Nam Yang Ju, Kyoung Gi, South Korea
Building: Dong Heon
Location: Nam Yang Ju, Kyoung Gi, South Korea
Completed: 2000
Architect: Hyo-Sang Seung
AE interests: stilted in mid-air, harmonizes with surrounding environment
Dong Kwang Methodist Church – Iksan, Jeon Ra Buk Do, South Korea
Building: Dong Kwang Methodist Church
Location: Iksan, South Korea
Completed:2002
Architect: Hyo-Sang Seung
AE interests: inclined roof, sloping sided tower
Kwangju Worldcup Stadium – Pungam-dong, Kwangju, South Korea
Building: Kwangju Worldcup Stadium
Location: Pungam-dong, Kwangju, South Korea
Completed: 2001
Architect: Space Group
AE interests: gently curved roof spanning entire stadium covers 60% of spectator seats, equipped with a press center and multiple facilities for players and spectators, seating capacity: 42,880
Building: Adonis Golf Club Clubhouse
Location: Yangsan, South Korea
Completed: 1999
Architect: John Friedman Alice Kimm Architects
AE interests: large, glass façade, tilted roof
Dongbu Financial Centre – Seoul, South Korea
Building: Dongbu Financial Centre
Location: Seoul, South Korea
Completed: 2002
Architect: Kohn Pedersen Fox Associates
AE interests: irregular building structure
¬Transportation Centre, Incheon International Airport – Incheon, South Korea
Building: Transportation Centre, Incheon International Airport
Location: Incheon, South Korea
Completed:2002
Architect: Terry Farrell & Partners
Concept Sustainable Design and Building Services Engineering: Battle McCarthy Limited
AE interests: aluminum tile envelope; arched roofing; sleek, curved surfaces; large glass facades allow natural sunlight to flow in;
OPUS Concert Hall Building – Seoul, South Korea
Building: OPUS Concert Hall Building
Location: Seoul, South Korea
Completed: 1998
Architect: Hak Sik Son
AE interests: insulated from external street noise; both acoustical and visual considerations; complex envelope using reinforced concrete frame, exposed concrete, corrugated metal, and glass facades
¬Dongbu Church – Seoul, South Korea
Building: Dongbu Church
Location: Seoul, South Korea
Completed: 2001
Architect: Jae Yong Lim
AE interests: built on a rocky, uneven site; steep, floating roof
Welcomm City – Seoul, South Korea
Building: Welcomm City
Location: Seoul, South Korea
Completed: 2000
Architect: Hyo Sang Seung
AE interests: first rusty cor-ten steel façade built in South Korea, four “little houses” that stand on a concrete base
BioMuseo – Panama City, Panama
[1,2,3,4]
Building: BioMuseo
Location: Panama City, Panama
Completed: 2013
Architect: Gehry Partners, LLP
Landscape Architect: Edwina von Gal
Structural Engineer: Magnusson Klemencic Associates
MEP Engineer: Don C. Gilmore and Associates, Inc.
Mechanical Engineer: J.E. Kiamco Y Asociados, S.A.
Facade and Metal Roof: Permasteelisa Group
Acoustical Engineer: Cerami Inc
Lighting Consultant: Lightswitch Architectural
General Contractor: Ingeneria R.M., S.A.
AE Interests: intricate roof design, sustainability
—-
Updated by Miguel Yapur, July 2020
InterActiveCorp Headquarters – New York, New York, U.S.
[1,2,3,4]
Building: InterActiveCorp Headquarters
Location: New York, New York
Completed: 2007
Architect: Gehry Partners, LLP
Structural Engineer: Desimone Consulting Engineers
Mechanical Engineer: Cosentini Engineering
Electrical Engineer: Cosentini Engineering
AE Interests: complex, twisted structure
—-
Updated by Miguel Yapur, July 2020
Lou Ruvo Alzheimer’s Institute – Las Vegas, Nevada, U.S.
[1,2,3,4]
Building: Lou Ruvo Alzheimer’s Institute
Location: Las Vegas, Nevada
Completed: 2009
Architect: Gehry Partners, LLP
Structural Engineer: WSP Cantor Seinuk
MEP: Cosentini Associates
AE Interests: uneven stack of block units, sustainable waves of steel and glass cover, complex structure and form
—-
Updated by Miguel Yapur, June 2020
Gehry Tower – Hannover, Germany
[1,2]
Building: Gehry Tower
Location: Hannover, Germany
Completed: 2001
Architect: Frank Gehry
AE Interests: twisted stainless steel facade, ferroconcrete core optimizes ground space
—-
Updated by Miguel Yapur, 2020
Guggenheim Museum – Bilbao, Spain
Building: Guggenheim Museum
Location: Bilbao, Spain
Completed: 1997
Architect: Frank Gehry
Structural Engineer: SOM
MEP: Cosentini Associates
Construction: URSSA, S. Coop Ltd.
AE Interests: complex geometry, steel structure, titanium metal panel facade. `
20th c. importance: Example of solving non-linear complex architectural geometry, and creating a new digital 3D work-flow which is now common in 21st c. architecture.
Updated by Miguel Yapur, June 2020
Hotel Marques de Riscal – Elciego, Spain
[1,2,3,4]
Location: Elciego, Spain
Completed: 2006
Architect: Gehry Partners, LLP
Executive Architect: IDOM
Structural Engineering: IDOM
Mechanical Engineering: IDOM
Electrical Engineering: IDOM
AE Interests: complex structure, curved steel cover, structure is lifted above site on columns
—-
Updated by Miguel Yapur, June 2020
Foundation Louis Vuitton – Paris, France
Building: Foundation Louis Vuitton
Location: Paris, France (Jardin d’Acclimatation)
Completed: 2014
Architect: Gehry Partners, LLP
Consultants: Gehry Technologies
Executive Architect: Studios Architecture
Mep Engineer: Setec Batiment
Lighting: L’Observatoire International / Ingelux
Civil Engineer: Setec Bâtiment
Building Façade Consultant: RFR/TESS
Acoustical Engineer (Base Building): LAMOUREUX
Sustainable Building Consultants: S’PACE / TERAO
General Contractor: VINCI Construction
AE Interests: laminated wood + steel structure, complex form, sustainability
Article: 1,
—-
Updated by Miguel Yapur, June 2020
Lewis Science Library – Princeton, New Jersey, U.S.
[1,2,3,4]
Location: Princeton University, Princeton, New Jersey
Completed: 2008
Architect: Gehry Partners, LLP
AE Interests: complexity of form, sustainability
—-
Updated by Miguel Yapur, June 2020
Art Gallery of Ontario – Ontario, Canada
[1,2,3]
Location: Ontario, Canada
Completed: 2008
Architect: Gehry Partners, LLP
Structural Engineer: Halcrow Yolles Engineering, Inc
Mechanical Engineer: H.H. Angus
AE Interests: natural light, structure, sustainability
Updated by Miguel Yapur, June 2020
leave a comment