Imperial College London Business School – London, England, U.K.
Building: Imperial College London Business School
Location: London, UK
Status: Completed 2004
Architect: Foster + Partners
Structural Engineer: Buro Happold
Quantity Surveyor: Davis Langdon / Mott Green Wall
M+E Engineering: Buro Happold
Landscape Architect: Charles Funke Associates
Lighting Engineer: Buro Happold
AE Interest: Dramatic Glass Panel Facade
—-
Imperial College London Faculty Building – London, England, U.K.
Building: Imperial College London Faculty Building
Location: London, United Kingdom
Completed: 2004
Architect: Foster + Partners
Structural Engineers: Buro Happold
MEP Engineers: Buro Happold
Project Manager: GTMS
AE Interest: Blue Glass Plate Facade, heated by waste heat generated by the power plant under the building, uses chilled beams for cooling
—-
Bleigiessen Sculpture – London, England, U.K.
[1]
Sculpture: Bleigiessen
Location: London, UK
Status: Completed 2006
Designer: Thomas Heatherwick
AE Interest: Built from 142,000 glass sphere and 27,000 high tensile steel wires. Every single piece was small enough to fit through a letterbox on a door.
Article: 1
—-
^
.
Peckham Library – London, England, U.K.
Building: Peckham Library
Location: London, United Kingdom
Status: Completed 1999
Architect: William Alsop
Structural Engineer: AKT II
AE Interest: Thin angled columns, irregular forms intersecting rectangular space, urban revitalization.
Edited 2/2015 GB
—-
GE Advanced Technology & Research Centre – Doha, Qatar
Building: GE Advanced Technology and Research Centre
Location: Doha, Qatar
Status: Completed 2010
Design Build: Burns & McDonnell
AE Interests: Compete metal structure, Roof and walls must support the weight and thrust of Boeing 777 engines being tested in the facility, atrium is made from rounded glass with steel reinforcement.
2012fallmwf
Hawaii Preparatory Academy Energy Laboratory – Waimea, Hawaii, U.S.
Building: Hawaii Preparatory Academy Energy Laboratory
Location: Kamuela, Hawaii
Status: Completed 2010
Architect: Flansburgh Architects
Structural Engineer: Walter Vorfeld & Associates
Sustainability Consultant: Buro Happold
AE Interests: Net Positive Energy and Water Building, Entirely Naturally Ventilated, Photovoltaic and Windmill Energy Sources
Articles: 1
2012fallmwf
Riverside Museum – Glasgow, Scotland, U.K.
Building: Riverside Museum
Status: Completed 2011
Location: Glasgow, Scotland, United Kingdom
Architect: Zaha Hadid
Structural Engineer: Buro Happold
AE Interest: Building Shell is constantly 37cm from steel structure, floor can take weight of a steam train, complex pleated roof
2012fallmwf
Central Los Angeles Area High School #9 – Los Angeles, CA, U.S.
Building: Central Los Angeles Area High School #9
Location: Los Angeles, California, U.S.
Completed in 2008
Architect: Coop-Himmelb(l)au
Structural Engineer: Taylor and Gaines
Civil Engineer: A.C. Martin Partners
Construction: PCL Construction Services, Inc.
AE Interests: Large cantilevers on both lower and upper floors. top end performing arts center, and tower with spiral ramp
—-
Akron Art Museum (Knight Building Expansion) – Akron, Ohio, U.S.
Building: Akron Art Museum (Knight Building Expansion)
Location: Akron, Ohio
Status: Completed in 2007
Architect: Coop Himmelb(l)au
Structural Engineer: B + G Ingenieure
Mechanical Engineer: IBE Consulting Engineers
AE Interests: Large Cantilevers across two of the main masses, building designed to create microclimates for more efficient heating and cooling
Articles: 1
—-
New U.S. Embassy – London, U.K.
Building: New U.S. Embassy
Location: London, United Kingdom
Status: Designed 2009-2010, construction will be completed by 2017
Architect: Kieran Timberlake
Sustainability and MEP: Arup
Structural Engineering: Weidlinger Associates
AE Interest: Targeted to be both BREEAM Outstanding and LEED Platinum, thin PV films in the facade
More information: [1] , [2]
^
.
leave a comment