41 Cooper Square – New York, New York

Posted in Built by Paul Carr on July 9, 2020

coo1  coo4 coo5  coo2
[1,2,3,4]

Building: 41 Cooper Square
Address:  41 Cooper Square New York City, New York
Completion Date: 2009
Client: The Cooper Union for the Advancement of Science and Art
Architect: Morphosis
Structural Engineer: Goldstein Associates, Inc. and John A. Martin & Associates, Inc.
MEP Engineer: IBE Consulting Engineers and Syska HennessyGroup, Inc.
General Contractor: F.J. Sciame Construction Co., Inc.
Facade Consultant: Gordon H. Smith Corporation
Civil Engineer: Langan Engineering and Environmental Services
Geotechnical Consultant: Mueser Rutledge Consulting Engineers
Facade Engineer: A. Zahner Company
Sustainability/LEED Consultant: Davis Langdon (AECOM)
Lighting Design: Horton Lees Brogden Lighting Design, Inc.
Landscape Architect: Mathews Nielsen Landscape Architects, PC
Acoutsics Engineer: Martin Newson & Associates, LLC
Fire Engineer: Arup Fire
Consulting Engineers: Rowan Williams Davies & Irwin, Inc
Water Proofing Consultant: Henshell & Buccellato

AE Interest:
stacked vertical piazza, organized around a central atrium, wrapped in a perforated stainless steel skin, complex geometry (atrium), LEED Gold, radiant heating and cooling ceiling panels, green roof insulates the building, harvested water is reused
—-

Awards:
2012 National AIA Honor Award, 2011 Excellence in Structural Engineering Award for New Construction (SEA SC), 2010 REED Energy Performance + Architecture Award

Articles: [1, 2, 3, 4, 5, 6]

Videos: [1, 2, 3]

Updated by Miguel Yapur, July 2020

The Finnish Embassy – Berlin, Germany

Posted in Built by Paul Carr on January 27, 2010

Building:  The Finnish Embassy
Location:  Berlin, Germany
Completion:  1999
Architect:  VIIVA
Structural Engineer:  IGH
Landscape:  Karsten Bockling
AE Interest:  Shape, solar louvers

The Reichstag – Berlin, Germany

Posted in Built by Paul Carr on January 27, 2010


Building:  The Reichstag
Address:  Platz der Republic 1 11011 Berlin, Germany
Completion: 1999
Architect:  Foster and Partners
Consultants:  Arup
AE Interest:  Dome, 360 Degree view

Royal Danish Embassy – Berlin, Germany

Posted in Built by Paul Carr on January 27, 2010

Building: Royal Danish Embassy
Address:  The Nordic Embassy Complexs, Berlin Tiergaten
Completion:  1999
Architect:  3XN
Engineer:  IGH
AE Interest:  Solar louvers, structure, Two facades

Photonics Centre – Berlin, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  Photonics Centre
Address:  Carl-Scheele-Strass 16 12489 Berlin, Germany
Completion: 1998
Cost:  25.7 Million Euros
Architect:  Sauerbruch Hutton Architects
AE Interest:  Double facade, solar louvers, natural ventilation

Olympic Cycle Stadium and Swimming Pool – Berlin, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  Olympic Cycle Stadium and Swimming Pool
Location: Berlin, Germany
Completion:  1999
Architect:  Dominique Perrault
Structural Engineer:  Arup
Project Manager:  PROMOS
AE Interest:  Multisports hall, structure, landscaping

Embassies of the Nordic Countries – Berlin, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  Embassies of the Nordic Countries
Location:  Berlin, Germany
Completion: 1999
Cost:  42.5 Million Euros
Architect:   Berger & Parkkinen
Structural Engineer:  IGH
Facade Engineer:  DEWI, Wien
Project Manager:  Drees & Sommer
AE Interest:  Facade, lighting, steel construction

North German Regional Clearing Bank – Hannover, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  North German Regional Clearing Bank
Address:  Am Friedrichswall 10 30159 Hannover, Germany
Completion:  2002
Architect:  Behnisch, Behnisch, and Partners
Structural Engineer:  Prefferkorn and Partners
AE Interest:  Cantilevers for dramatic lighting, complex shape, double skinned facade, green building

Igus Headquarters & Factory – Cologne, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  Igus Headquarters & Factory
Location: Cologne, Germany
Completion:  2000
Architect:  Nicholas Grimshaw & Partners
Structural Engineer:  Whitby Bird
Contractor: Walter Bau- AG
Cost Consulant:  Davis Langdon & Everest
AE Interest:  Large Span, center mast, Factory can be changed for customers demands

 

 

 

Wallraf-Richartz Museum – Cologne, Germany

Posted in Built by Paul Carr on January 26, 2010

Bulding:  Wallraf-Richartz Museum
Address:  Obenmarspforten 50667 Cologne, Germany
Architect:  Professor OM Unger
Completion:  2001
Cost: 63 Million
AE Interest:  Art Museum, lighting, Panoramic views, large collection of medieval art

HV Bayer Headquarter – Leverkusen, Germany

Posted in Built by Paul Carr on January 26, 2010

Building:  HV Bayer Headquarters
Address:  Kaiser-Wilhelm-Allee 51373 Leverkusen, Germany 0214 301
Completion:  2000
Architect:  Murphy/Jahn
Structural Engineer:  Werner Sobek
AE Interest:  Twin Shell building, green building



AT&T (Cowboy’s) Stadium- Arlington, Texas, U.S.

Posted in Built by Paul Carr on September 3, 2009

580-2  dallas-cowboys-nfl-football-usa-stadium-wallpapers-football-sports-photo-nfl-wallpapers-sport-318002085  2332202850_605e30e377_o
1,2,3

Building: AT&T (Cowboy’s) Stadium
Address: 925 North Collins Street, Arlington, Texas 
Owner: City of Arlington
Architect: HKS, Inc.
Structural Engineer: Walter P Moore and Campbell & Associates
General Construction: Manhattan Construction
Construction from 2005-2009

The stadium of NFL’s Dallas Cowboys was the largest dome in the world, until the Singapore National Stadium was completed in June 2014.  The roof has an area of 660,800 square feet with the highest point at nearly 300 feet above the field.  The stadium is centered about two main steel arch box trusses, anchored to the ground on each end lying 1,225 feet apart.  Two of the large panels connecting these trusses are retractable, creating an opening of 104,960 square feet in twelve minutes.  The world’s largest operable glass doors are located at each end zone of the stadium, spanning 180 feet wide and 120 feet high.  `
—-ea

Seoul Performing Arts Center- Seoul, Korea

Posted in Proposed Design by Paul Carr on August 31, 2009

Seoul

Address:  Seoul, Korea
Architect:  Morphosis
Structural Engineer:  Buro Happold

AE Interest:  Structure, site plan, plaza
….ea

University of Cincinnati Campus Recreation Center- Cincinnati, Ohio, U.S.

Posted in Built by Paul Carr on August 31, 2009

Capture
[1]

Address:  2820 Bearcat Way Cincinnati, Ohio, U.S.
Completion Date:  2005
Architect:  Morphosis
Structural Engineer:  THP Ltd.

AE Interest:  Structure, design, space
—-ea

Edited 4/2015 EA

SHR Perceptual Management- Scottsdale, Arizona, U.S.

Posted in Built by Paul Carr on August 31, 2009

SHR

Address:  14646 North Kierland Boulevrad Scottsdale, Arizona, United States of America
Completion Date:  1999
Architect:  Morphosis
Structural Engineer:  Caruso Turley Scott, Inc.

AE Interest:  Structure, curves, interior space
,,,,ea

New Orleans National Jazz Center – New Orleans, Louisiana, U.S.

Posted in Proposed Design by Paul Carr on August 31, 2009

New Orleans National Jazz Center

Address:  New Orleans, Louisiana, United States of America 70112
Architect:  Morphosis
Structural Engineer:  Thornton Tomasetti Group, Inc.

AE Interest:  Structure, interior space
….ea

Hypo Alpe-Adria Bank- Udine, Italy

Posted in Built by Paul Carr on August 31, 2009

Hypo Alpe- Adria Bank

Address:  Via Alpe Adria 6 Tavagnacco, Udine, Italy
Completion Date:  2007
Architect:  Morphosis
Structural Engineer:  IN.AR.CO. S.R.L.

AE Interest: Structure, angles, interior space
—-ea

Diamond Ranch High School – Pomona, California, U.S.

Posted in Built by Paul Carr on August 31, 2009

Capture
[1]

Building: Diamond Ranch High School
Location: Pomona, California
Completed: 1999
Architect: Morphosis
Project Architect: John Enright
Structural Engineer:  Arup
MEP Engineer: Arup
Construction: Bernards Brothers
Civil Engineer: Andreasen Engineering

AE Interest: Built on a hillside, organization of buildings cued from natural topography.
—-ea

Edited 4/2015 EA

Caltrans District 7 Headquarters- Los Angeles, California, U.S.

Posted in Built by Paul Carr on August 31, 2009

Caltrans 7

Address:  100 South Main St. Los Angeles, California, United States of America 90012
Completion Date:  2004
Architect:  Morphosis
Structural Engineer:  John A. Martin Associates, Inc.

AE Interest:  Structure, lighting, design
—-

Burj Al Maydan- Dubai, United Arab Emirates

Posted in Built, Proposed Design by Paul Carr on August 30, 2009

asdf

Address:  Dubai, United Arab Emirates
Architect:  Morphosis
Structural Engineer:  Thornton Tomasetti Group, Inc.
MEP Engineer:  IBE Consulting Engineers

AE Interest:  Structure, Curve of the building, plaza
….