AEWORLDMAP.COM (2,900+ posts)

A research project from the Architectural Engineering program at The University of Texas at Austin – featuring contemporary architecture, engineering and construction around the world.

Author Archive

Angel Building – London, U.K.

leave a comment »

Angel Building Street Viewangel building_atrium

Building: Angel Building
Location: London, U.K.
Date Completed: 2011
Architect: AHMM
Structural Engineer: AKT II

AE Interest: Vierendeel Truss, Self-compacting concrete, building re-use/adaptation, BREEAM Excellent award, masterful concrete work

Image Credits: Detail Magazine (2011)

—-

Written by Cody Lambert

June 13, 2013 at 3:06 pm

Posted in Built

Kauffman Center for the Performing Arts – Kansas City, MO, U.S.

leave a comment »

building whole kauf cable ties kauf Outer Shell Kauf

Location: Kansas City, MO
Engineer: Arup
Architect: Safdie Architects with BNIM Architects

AE Interests: 1,600-seat concert hall and 1,800-seat ballet/opera house, cable-supported glass roof allowing for no interior columns, design influenced by nonlinear analysis and form-finding, combination of CIP concrete and steel framing allowed for fast tracking

Sources: [1]

Written by Cody Lambert

April 25, 2013 at 1:08 pm

Posted in Built

Kroon Hall – New Haven, Connecticut, U.S.

leave a comment »

Images: [1], [2]

Building: Kroon Hall
Location: New Haven, Connecticut
Architect: Hopkins Architects (Great Britain) & Centerbrook Architects and Planners (Local, Connecticut)
Engineer: ARUP
AE Interests: LEED Platinum, passive/low energy systems, thermal mass, smart windows, geothermal heating/cooling (4, 1639 ft wells)
Completed: 2009

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:38 am

Posted in Built

VanDusen Botanical Gardens Visitor Centre – Vancouver, British Columbia, Canada

leave a comment »

Images: [1], [2], [3]

Building: VanDusen Botanical Gardens Visitor Centre
Location: Vancouver, British Columbia, Canada
Architect: Perkins + Will
Engineer: Fast + Epp

AE Interests: unique/universal connections, complex wood framing, prefab, free form roof structure, low cost, fast build, panelized wood forms

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:38 am

Posted in Built

UK Pavilion Shanghai Expo – Shanghai, China

leave a comment »

Images: [1], [2]
[Video Link]

Building: UK Pavilion Shanghai Expo
Location: Shanghai, China
Architect: Heatherwick Studio
MEP Consultant: Atelier Ten
Principal Contractor: Mace

AE Interests: building material use (60,000 transparent acrylic rods), unique illumination scheme, dynamic building movement, steel and timber composite structure, cantilever frames, natural ventilation, sustainable building design (local material usage/planned material recycling effort)

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:37 am

Posted in Built

AAMI Park Stadium – Melbourne, Victoria, Australia

leave a comment »

Images: [1], [2]

Building: AAMI Park Stadium
Location: Melbourne, Victoria, Australia
Architect: Cox Architecture
Engineer: ARUP
AE Interests: highly efficient design, minimal material use (accomplished via optimizing structural elements for size and load), designed for future upgrade capability, roof permits only desirable sunlight to strike playing pitch

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:33 am

Posted in Built

Culture Yard in Elsinore – Elsinore, Denmark

leave a comment »

Images: [1], [2]

Building: Culture Yard in Elsinore
Location: Elsinore, Denmark
Architect: Aart
Engineer: Soren Jensen Consulting Engineers
Completed: 10/10/2010 at 10:10
AE Interest: long span concrete beams, structural integration of new building with old, triangulated glass and steel structure, massive cantilevered 3-story structure

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:33 am

Posted in Built

2022 FIFA World Cup Qatar Showcase – Qatar

leave a comment »

Images: [1], [2], [3]

Building: 2022 FIFA World Cup Qatar Showcase
Location: Qatar
Architect: Arup
Engineer: Arup
AE Interest: carbon-neutral design, “world’s most sustainable stadium”, extremely fast design/build project, rotatable canopy roof aids with passive cooling/insulation, 100% of building energy use is from photovoltaic solar cells that respond and adjust to the sun’s path

Links: [1]

Written by Cody Lambert

December 4, 2012 at 11:32 am

Posted in Built

Niels Bohr Science Park – Copenhagen, Denmark

leave a comment »

Building: Niels Bohr Science Park
Location: Copenhagen, Denmark
Architects: Vilhelm Lauritzen
Engineering Services: Ramboll Group
AE Interest: Advanced (transparent) facade design, Site integration, Space use exploration (“tropospheres”), Natural lighting, Sustainability

fall2012tth

Written by Cody Lambert

September 27, 2012 at 4:26 pm

Posted in Built

Panum Complex – Copenhagen, Denmark

leave a comment »

Building: Panum Complex
Location: Copenhagen, Denmark
Status: Projected Completion 2014
Architects: C. F. Møller
Engineering Services: Ramboll Group
AE Interest: Urban planning, Sustainable Architecture, High rise Structure, Interior flexibility, Roof gardens, Solar Shading, Complex massing, Angular/rectilinear form

Video

fall2012tth

Written by Cody Lambert

September 27, 2012 at 4:18 pm

Posted in Built

Ground Zero Master Plan – New York, New York, U.S.

leave a comment »

Building: Ground Zero Master Plan
Location: New York, New York
Status: Under Construction
Development Size: 16 Acres
Architect: Studio Daniel Libeskind

AE Interest: Grand collaborative effort among several premier architects/engineering firms, Skyscraper, Complex/Criss-Crossing structural elements, Massive Site, Cultural resonance, Sustainability

—-

Written by Cody Lambert

September 27, 2012 at 3:27 pm

Posted in Under Construction

Centre De Congrès À Mons – Mons, Belgium

leave a comment »

Building: Centre De Congrès À Mons
Location: Mons, Belgium
Status: Under Construction
Architect: Studio Daniel Libeskind
Structural Engineer: Ney & Partner
AE Interest: Advanced facade design, Spectacular siting, Concrete Design, Indirect natural light, Blends curvilinear and angular form language

fall2012tth

Written by Cody Lambert

September 27, 2012 at 2:13 pm

Posted in Built