PGA Tour Headquarters — Ponte Vedra Beach, Florida, United States
Facts:
– Office and Collaboration Center for the PGA Tour
– Completed in Spring 2021
– Ponte Vedra Beach, FL 32082, United States
– General Contractor: Sidney Jordan
– Design Architect: Foster + Partners
– Executive Architect: Wakefield Beasley
– Structural Engineer: Atlantic Engineering Services
– Civil/MEP Engineer: Jordan & Skala Engineers
– Lighting Engineer: Lumen
– Landscape Architect: Prosser
– 187,000 square feet
– 3 Stories
– Open Floorplans for Collaboration
– 1,000 Staff Capacity
– LEED Gold Rating
– Integrates Nature into Design
– Gym and Social Components for New-Age Workspace
– Surrounded by TPC Sawgrass Golf Course
– Centralized, Open-Air Atrium
– Glazed Facades
AE Interests:
– Design embraces collaborative working; LEED Gold Rating; Symmetric Design; Atrium used to fill building with natural light; Natural wood materials; Large 3 story exposed columns; $290,000 MEP Budget; MEP design to accommodate renovations; Comfortable environment on balconies, in the naturally humid climate; Exterior lighting to maintain natural light atmosphere during the night
The Northwestern University Ryan-Walter Athletics Center — Evanston, Illinois, United States
Facts:
– Athletic Training and Performance Center for Northwestern University
– Completed in Summer 2018
– 2240 Campus Dr, Evanston, IL 60201
– General Contractor: Walsh and Barton Marlow
– Design and Executive Architect: Perkins and Will
– Structural Engineers: SR+A and WSP
– MEP Engineer: Affiliated Engineers
– Civil Engineer/Landscape Architect: SmithGroupJJR
– Steel Fabricator: Cives Steel Co.
– 420,000 square feet
– $13 million average Work-In-Place per month
– 4 Stories of Office Space
– 8 Locker Rooms for Varsity Athletics
– Full Length Turf Field
– Nutrition Center
– Athletic Performance and Health Center
– 2 Athletic Training Centers
AE Interests:
– Located on shores of Lake Michigan; 420,000 square foot recreation complex; curved interior truss system; 87 foot peak ceiling height for field dome; 3,409 tons of steel framing used; 112 kW of solar energy produced by 374 roof-mounted panels; 45 foot tall suspended glass curtainwall façade; composite slab gravity system; aluminum and limestone exterior
leave a comment