UC Innovation Center – Santiago, Chile
Building: UC Innovation Center
Location: Santiago, Chile
Address:
Architect: Alejandro Aravena – ELEMENTAL
Structural Engineer: Mario Alvarez – Sirve S.A.
Total Floor Area: 8176 m²
Construction phase: 2012-2014
Materials: reinforced concrete, steel, wood, glass
Cost: 18 million USD
AE Interest: Uses a large thermal mass to account for Santiago’s desert climate instead of windows which would produce a greenhouse effect, has an atrium to allow indirect light inside the building and promote a sense of openness. [a]
Siamese Tower – Santiago, Chile
Building: Siamese Tower
Location: Santiago, Chile
Architect: Alejandro Aravena – ELEMENTAL
Building Area: 5,000 sm
Design/ Construction Period: 2003-2005
AE interest: The building has two outer shells; the first is made of glass to protect against weathering and the second is made of fiber-cement to make it energy efficient. To account for the greenhouse effect they relied on the Venturi effect and allowed the hot air to rise through openings at the top of the building. [a]
Villa Verde – Constitución, Chile
Building: Villa Verde
Location: Constitución, Chile
Architect: Alejandro Aravena – ELEMENTAL
Structural Engineer: Patricio Bertholet
General Contractor: Icafal
Site area: 8500m²
AE interest: Chilean housing project applied the principle of incrementality, the initial area is 57m² and has the potential to grow up to 85m²; There are 484 incremental houses. [a]
Video: [1]
leave a comment