Arizona State University, Biodesign Institute C—Tempe, Arizona
Images: [1],[2],[3],[4],[5]
Building: Arizona State University, Biodesign Institute C
Location: Tempe, Arizona
Address: 797 E Tyler St, Tempe, AZ 85281
Completed: 2018
Area: 189,759 SF
Owner: Arizona State University
Developer: Arizona State University
General Contractor: McCarthy Building
Architect: ZGF Architects
Structural Engineer: KPFF Consulting Engineers
MEP Engineer: Affiliated & Associates Consulting Engineers
Civil Engineer: Dibble & Associates Consulting Engineers
AE Interests: A $120 million project featuring 189,759 SF of research facilities, five stories plus a basement, a dual-skin façade with a copper screen for solar shading, LEED Platinum certification, a design for flexible lab and office space, advanced research equipment, and a concrete and steel structure optimized for vibration control.
Sources: [1],[2],[3],[4]
Video: [1]
[More]
The Mark/F5 Tower—Seattle, Washington
Images: [1],[2],[3],[4],[5]
Building: The Mark/F5 Tower
Location: Seattle, Washington
Address: 801 5th Avenue, Seattle, Washington, U.S.
Completed: 2018
Area: 785,000 SF
Owner: Daniels Real Estate
Developer: Daniels Real Estate
General Contractor: JTM Construction
Architect: ZGF Architects
Structural Engineer: Arup and Coughlin Porter Lundeen
MEP Engineer: Syska Hennessy Group, The Rushing Group, Auburn Mechanical, Cochran, Hermanson Company
Civil Engineer: Coughlin Porter Lundeen
AE Interests: A $450 million project featuring a 44-story high-rise, 660-foot-tall, 785,000 SF of mixed-use space, sleek glass curtain wall with a tapered form, includes Class A office space, 189-room luxury hotel, and event facilities, a below-grade parking garage, high-performance glazing for energy efficiency, steel and concrete structural system, and LEED-Silver certification.
Sources: [1],[2],[3],[4],[5],[6]
Video: [1]
[More]











leave a comment