AEWORLDMAP.COM (3,300+ posts)

Limoges Concert Hall – Limoges, France

Posted in Built by Annabel Cook on June 27, 2015

limoges 4   limoges3 limoges france

[1,2,3]

Building: Limoges Concert Hall
Location: Limoges, France
Completion: 2007
Architect: Bernard Tschumi Architects
Local Architect: Atelier 4
Structural Engineers: Technip TPS
Acoustics: CIAL

AE Interests: Double envelope: an outer skin made of wood arcs and translucent rigid poly-carbonate sheets and an inner acoustical envelope of locally grown Douglas fir, meant to filter light, heat and acoustics. A good example of energy conservation and use of renewable materials.

Antalya Tower – Antalya, Turkey

Posted in Proposed Design by Annabel Cook on June 23, 2015

tower   section 2
 section from top 2  section from top

[1, 2, 3, 4]

Building: Antalya Tower
Location: Antalya, Turkey
Completion: To be finished by 2016
Architects: NITA (Nitelikli Tasarımlar Atölyesi)
Structural Engineers: Yapı Statik Proje
Mechanic: TSO
Electric: KEY
Facade Consultant: Guvendiksoy Facade Consultancy

AE Interests: Tripartite in form, viewing decks tapering into a single shaft at the building’s base, concrete service core which provides rigidity against on-site wind forces, facade also designed against strong winds

2 World Trade Center (2 WTC) – New York, New York

Posted in Proposed Design by Annabel Cook on June 23, 2015

world trade center 2    world trade 2

[1,2]

Building: 2 World Trade Center (2 WTC)
Location: New York, New York
Completion: Proposed Design
Architects:  BIG
Partners In Charge: Bjarke Ingels, Thomas Christoffersen
Project Manager: Ute Rinnebach
Structural Engineers: N/A

AE Interests: Manhattan’s third-tallest building if built today, responds to both low and high rise, mix-use spaces, maximizes buildable space

Video Tour: 1

gb3

 

.

ICD/ITKE Research Pavilion 2012 – Stuttgart, Germany

Posted in Built by Annabel Cook on June 16, 2015

     6.162

[1, 2, 3]

Building: ICD/ITKE Research Pavilion
Location: Stuttgart, Germany
Completion: 2012
Architects:  University of Stuttgart, Faculty of Architecture and Urban Planning
Structural Engineers: Institute for Computational Design (ICD) and the Institute of Building Structures and Structural Design (ITKE) at the University of Stuttgart

AE Interests: Double curved shape pavilion, entirely robotically fabricated from carbon and glass fiber composites, directional stress distributions with unidirectional layer structure,  anisotropic fiber for directed load transfer, fiber optic sensors continuously monitor the stress and strain variations

Glacier Skywalk – Jasper, Canada

Posted in Built by Annabel Cook on June 11, 2015

   glacier skywalk2

[1, 2]

Building: Glacier Skywalk
Location: Jasper, Canada
Completion: 2014
Architects: Sturgess Architecture
Structural Engineer: Read Jones Christoffersen Consulting Engineers
Construction: PCL Construction Manegement, Inc

AE Interests: Cantilevered corten steel and glass structure, parabola shaped, trapezoidal box girders supported at the cliff, then extended curved end is cable supported

Ribbon Chapel – Hiroshima, Japan

Posted in Built by Annabel Cook on June 11, 2015

   

[12]

Building: Ribbon Chapel
Location: Hiroshima, Japan
Completion: 2013
Architects: NAP Architects
Structural Engineers: Ove Arup & Partners Ltd, S structure

AE Interests: Free standing chapel, use of titanium zinc alloy, a three-dimensional brace and hoop effect for resisting horizontal and outward forces, pendulum-type base isolation, overhang-type tuned mass damper (TMD), dot point glazing (DPG) arms

Sejong Art Center – Seoul, South Korea

Posted in Built by Annabel Cook on June 9, 2015

arts theator sejong art

[1, 2]

Building: Sejong Art Center (SAC)
Location: Naseong-dong, Seoul, South Korea
Completion: March 2013
Architects: DMP (Designcamp Moonpark) Partners
Structural Engineer: I’ST
Mechanical Engineer: HIMEC
Civil Engineer: Daekyo E&C
Electrical : Jung Woo Eng.
Acoustics: ad&c

AE Interests: Multi-theater center, best acoustic quality using SAR (Source Selective Absorbtion & Reflection), long span roof for open entrance

Sejong Center for Performing Arts – Sejong, South Korea

Posted in Built by Annabel Cook on June 9, 2015

sejong sejong2

[1, 2]

Building: Sejong Center for Performing Arts
Location: Sejong, South Korea
Completion: 2013
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Performing Arts Center, complex interior theater, intricate pattern of louvers, curved roofs.

River Culture Pavilion (ARC) – Daegu, South Korea

Posted in Built by Annabel Cook on June 2, 2015

Screen shot 2015-06-01 at 11.54.58 PM  arc  Screen shot 2015-06-01 at 11.59.29 PM
[1,2, 3]

Building: River Culture Pavilion (ARC)
Location: Daegu, South Korea
Completion: June 2012
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Multimedia theater pavillion, complex form integrated with landscape, ETFE plastic pillows, man-made peninsula, part of World Expo 2012.

Edited 6/2015gb

Sydney Modern – Sydney, Australia

Posted in Built by Gregory Brooks on June 1, 2015

Screen shot 2015-06-01 at 11.47.42 PM  Screen shot 2015-06-01 at 11.48.03 PM
[1, 2]   +  site

Building:  Sydney Modern Project (competition winner)
Location:  Sydney, Australia
Architect:  SANAA

AEInterest:  International competition winner, Lightweight pavilions connecting museum to landscape and city.
“includes the new building by SANAA, a revitalization of the original, 19th century building, and a new plaza linked to the Royal Botanic Gardens.”

Article: 1