UCH Macmillan Cancer Centre – London, U.K.

Building Location: London, UK
Completed: 2012
Architect: Hopkins Architects
Structural Engineer: ARUP
Contractor: Skanska Construction
AE interest: green roof, photovoltaic panels for producing energy, innovating glazing system for energy efficiency
Articles: 1
The Cutty Sark Conservation Project – London, U.K.
Building: The Cutty Sark Conservation Project
Location: London, UK
Status: Completed in 2012
Architect: Grimshaw Architects
Construction Management: Gardiner & Theobald
AE Interest: A new supporting structure cradles the lifted ship’s hull, an enveloping glass canopy is attached along the ship’s waterline
Article: 1
Museum of Tomorrow – Rio de Janeiro, Brazil
Building: Museum of Tomorrow
Location: Rio de Janeiro, Brazil
Constructed: December 2015
Architect: Santiago Calatrava
Project Developer: Fundação Roberto Marinho
AE Interest: powered by photovaltaic panels on the rooftop; sustainability; steel, cantilevered roof; concrete building structure
Hybrid House – Hamburg, Germany
Building: Hybrid House
Location: Hamburg, Germany
Completion: March 2013
Architects: Bieling Arcchitects, Hamburg
Structural Engineer: Bollinger + Grohmann
Client: Wernst Immobilien, Hamburg
AE Interest: wooden frame; prefabricated frame – mountable in modular construction; sustainability; environmentally sound technology; daylighting/natural lighting; rooms have flexible utilization
Articles: 1
Keltenmuseum am Glauberg – Glauberg, Germany
Building: Keltenmuseum am Glauberg
Location: Glauberg, Germany
Status: Finished construction August 2010, opened in May 2011
Architect: kadawittfeldarchitektur, Aachen
Structural Engineer: Bollinger + Grohmann
AE Interest: corten steel structure; large cantilever over the ground; no interior supporting pillars; ventilated facade
Articles: 1
Louvre Lens – Lens, France
Building: Louvre Lens
Location: Lens, France
Completed: 2012
Architectural Team: SANAA, Imrey Culbert
Structural Engineer: Betom Ingenierie
Structural Engineering and Facade Engineering: Bollinger + Grohmann
Artificial and Natural Day Lighting: Arup
Acoustical Engineers: Avel Acoustique
AE Interest: Five low, curving pavilions compose main structure; roof made up of glazed, angled louvers; large brushed aluminum panels alternating with clear glass reflecting panels to create facade; transparency to incorporate environment
Liberty Hotel – Boston, Massachusetts, U.S.
Building: The Liberty Hotel
Location: Boston, Massachusetts
Status: Completed September 2007
MEP Engineer: WSP Flack + Kurtz
Architect: Cambridge Seven Associates
Preservation Architect: Ann Beha Architects
AE Interest: what was once a notorious prison is now a 5-star luxury hotel, marries historic architecture with contemporary design
Article: Press Release
Chartres Expo Centre – Chartres, France
Building: Chartres Expo Centre
Location: Chartres, France
Status: Project Canceled
Design Team: Zaha Hadid Architects
Local Architect: SRA Architects
Structural Engineering: Bollinger + Grohmann
Building Services: Setec Batiment
Landscape Architect: La Compagnie du Paysage
AE Interest: complex geometry, green roofs, flexible spaces
Serpentine Gallery Pavilion 2012 – London, England, U.K.
Building: Serpentine Gallery Pavilion 2012
Location: London, United Kingdom
Comlition: Jun 2012
Dismantled: October 2012
Architect: Herzog & de Meon and Ai Weiwei
Structural Engineer: Arup – Stuart Smith
Client: Serpentine Gallery
AE Interest: The building is 1.4 meters underground and meant to have this invisible feeling from far away.
Source: [1]
Akron Art Museum (Knight Building Expansion) – Akron, Ohio, U.S.

Building: Akron Art Museum (Knight Building Expansion)
Location: Akron, Ohio
Status: Completed in 2007
Architect: Coop Himmelb(l)au
Structural Engineer: B + G Ingenieure
Mechanical Engineer: IBE Consulting Engineers
AE Interests: Large Cantilevers across two of the main masses, building designed to create microclimates for more efficient heating and cooling
Articles: 1
—-
The Gate – Doha, Qatar
Building: The Gate – Doha, Qatar
Location: Doha, Qatar
Completed: 2011
Architect: MZ Architects and Partners
Structural Engineer: Halcrow Yolles
Main Contractor: Ammico Contracting Co. (First Phase)
AE Interest: Mixed-use space with glass/energy technologies; use of smart technology to automatically optimize power usage.
Articles: 1
CNY Philanthropy Center – Syracuse, New York, U.S.
Building: CNY Philanthropy Center
Location: Syracuse, New York
Completion: November 2012
Architect: King and King Architects LLP
Construction Manager/Engineer: C and S Companies
AE Interest: 91% construction waste recylced, green roof, rain garden, natural lighting, pervious pavement parking lot
Syracuse Greek Theatre Scenography – Syracuse, Italy
Building: Syracuse Greek Theatre
Location: Syracuse, Italy
Completed: 2012
Architect: OMA Rem Koolhaas
Project Architect: Francesco Moncada
Local Architect: Emanuela Reale
Structural Engineer: Sebastiano Floridia
AE Interests: Simple structure with concrete seating and floors with an emphasis toward wooden structure on stage. Designed in three parts: the Ring, the Raft, and the Machine.
Articles: 1
Plantahof Auditorium – Landquardt, Switzerland
Building: Plantahof Auditorium
Location: Landquart, Switzerland
Status: Completed October 2010
Architect: Valerio Olgiati
Structural Engineer: Patrick Gartmann of Conzett Bronzini Gartmann AG
AE Interests: Result is a hybrid of pillars and walls, structure combines in equal measure a frame and solid construction
Portia Winery – Burgos, Spain
Building: Portia Winery
Location: Burgos, Spain
Status: Completed 2010
Architect: Foster + Partners
Structural and Mechanical Engineer: ARUP
Contractor: FCC
Project Manager: Pointec
Lighting Consultant: Claude Engle
AE Interest: Uses natural topography to aid wine process, reducing building’s energy use and maximizing efficiency, concrete structure of Corten steel, roof has photovoltaic cells and concrete to cool interior.
Al Bayt Stadium – Al Khor, Qatar
Building: Al Bayt Stadium
Location: Al Khor, Qatar
Completed is 2021
Architect: Albert Speer and Partners
Engineers: CH2M HILL
AE Interests: Seashell inspired design, flexible roof, 45,00 seating capacity
Articles: 1
American University – Cairo, Egypt
Building: The American University in Cairo
Location: Cairo, Egypt
Engineer: Fluor
Co-prime Architect(USA): Sasaki and Associates
Co-prime Architect(Egypt): Abdel-Halim Community Design Collaborative
AE Interest: design of “in-between” spaces creates architectural unity and a sense of community, visually connected to gardens and landscapes which showcase Egypt
Articles: 1
The Resnick Exhibition Pavilion – Los Angeles, California, U.S.
Building: Resnick Pavilion (Expansion of the LA County Museum of Art)
Location: Los Angeles, California, U.S.A
Status: Completed 2010
Architect: Renzo Piano Building Workshop
Collaborating Architect: Gensler Associates
Engineers: Arup
AE Interests: Saw toothed roof allows natural sunlight, most functions moved outside to preserve art space.
Chanel Travelling Pavilion – Greater China, Japan, United States of America
Building: Chanel Travelling Pavilion
Location: Greater China, Japan, United States of America
Status: Completed 2008
Architect: Zaha Hadid Architects
Project Architect: Thomas Viewtzke, Jens Borstelmann
Structural and Mechanical Engineer: ARUP
General Contractor/Tour Operator: ES Projects
AE Interest: Molded fiber glass panels for facade, PVC roof and ETFE roof lights, Skeletal steel frame, Taken apart and transported around the world, Packed into sea containers.
Naberezhnaya Office Towers – Moscow, Russia
Building: Naberezhnaya Office Towers
Location: Moscow, Russia
Status: Completed 2007
Architect: Arcadis/Malcolm Pirnie/RTKL & ENKA Architectural Office
Structural Engineer: Thornton-Tomasetti Engineers & ENKA Design Office
General Contractor: Enka İnşaat & Sanayi A.Ş
AE Interests: The tower has a sound-insulated façade that provides a healthy noise-free work environment. Moreover, the building has various heights that allow the visitor to enjoy spectacular views on Moscow’s city center and the River.
Articles: 1
2012fallmwf
Ritz-Carlton Hotel – Toronto, Canada
Building: Ritz-Carlton Hotel
Location: Toronto, Canada
Status: Completed February 2011
Architect: Kohn Pedersen Fox
Architect of Record: Page + Steele
Construction Manager: Ellis Don
AE Interest: upper floors cantilever over 20 feet, as roof angles the upper floor plates increase to add more area, modern architecture style
2012fallmwf
The Sentinel – Glasgow, Scotland, U.K.
Building: Sentinel Building – Glasgow, United Kingdom
Location: 103 Waterloo Street, Glasgow, Scotland, UK
Completed: 2005
Architect: Gordon Murray and Alan Dunlop Architects
Structural Engineer: Halcrow Yolles
Main Contractor: CBA
AE Interest: LED lighting integrated into glazing, allowing façade to cycle through colors at night. Floor-to-ceiling glass box.
Article: 1
2012fallmwf
Tata Consultancy Services, Banyan Park – Mumbai, India

Building: Tata Consultancy Services, Banyan Park
Location: Mumbai, India
Status: In progress
Architect: Tod Williams Billie Tsien Architects
Structural Engineer: Sterling Engineering Consultancy Services Private Limited
Construction Manager: Kiran Trivedi Group
AE Interest: Massive cantilevers, Complex staircases, Large exterior granite panels, Horizontal solar shading, Skylight, Shelter from heat and monsoons, Underground Parking Garage and MEP systems
fall2012tth
China Telecom Office and Technical Buildings B12 & B13, Shanghai China
Building: China Telecom Office and Technical Buildings B12 & B13
Location: Shanghai, China
Status: Completed in 2007
Architect: GMP Architekten
Design: Meinhard von Gerkan
AE Interest: Glass facade, glass “skin” suspended beyond exterior building wall, circuit graphics on “skin”, socle at each story, vertical slats, technical facility and office space
fall2012tth
Amway Events Center – Orlando, Florida, U.S.
Building: Amway Events Center
Location: Orlando, Florida
Status: Completed 2010
Architect: Populous
Structural Engineer: Walter P. Moore Engineers and Consultants
General Contractor: Hunt Construction
Estimated Cost: $480 million
AE Interests: First LEED Gold arena in the NBA, LED light tower, expansive glass curtain wall, sustainable design
fall2012tth
New Science Building – City University of New York, Lehman College, Bronx, New York, U.S.

Building: New Science Building
Location: City University of New York, Lehman College, Bronx, New York
Completion of Phase I: October 11, 2012
Architect: Perkins+Will
MEP Engineer: Syska Hennessy Group
Construction Manager: Gilbane Construction
AE Interest: LEED Silver, Water recycling system, Innovative wrap-around heat pipe, Solar hot water panels, Rooftop greenhouse, Radiant floor heating
—-
Christ Pavilion – Volkenroda, Germany
Building: Christ Pavilion
Location: Volkenroda, Germany (Expo 2000) and Thuringia, Germany (Re-erection 2001)
Status: Completed in 2001
Architect: GMP Architekten
Design: Meinhard von Gerkan and Joachim Zais
AE Interest: structurally simple and clear, limited to a few materials, marble, coated steel, fair-faced concrete, glass, simple post-and-frame construction, roof is pre-fabricated stainless steel cladded elements
fall2012tth
Niels Bohr Science Park – Copenhagen, Denmark
Building: Niels Bohr Science Park
Location: Copenhagen, Denmark
Architects: Vilhelm Lauritzen
Engineering Services: Ramboll Group
AE Interest: Advanced (transparent) facade design, Site integration, Space use exploration (“tropospheres”), Natural lighting, Sustainability
fall2012tth
Yueda 889 – Shanghai, China
Building: Yueda 889
Location: Shanghai, China
Status: Completed January 2010
Architect: Callison
Real Estate Developer: Yueda Real Estate Development Company
AE Interests: Aluminum and glass façade, curtain wall system, transparent glass canopy which connects a shopping center, a plaza, and an office tower.
Panum Complex – Copenhagen, Denmark
Building: Panum Complex
Location: Copenhagen, Denmark
Status: Projected Completion 2014
Architects: C. F. Møller
Engineering Services: Ramboll Group
AE Interest: Urban planning, Sustainable Architecture, High rise Structure, Interior flexibility, Roof gardens, Solar Shading, Complex massing, Angular/rectilinear form
fall2012tth
Exzenterhaus Bochum – Bochum, Germany
Building: Exzenterhaus Bochum
Location: Bochum, Germany
Status: Completed 2012
Architect: Gerhard Spangenberg
Engineer: Schlaich Bergermann and Partner
AE Interests: Complex structural components, 25 cm floor slab with maximum cantilever length of 4.5 m, Geo-technical engineering solutions; built on top of WWII bomb shelter, near subway line
fall2012tth
Texas Children’s Hospital Pavilion for Women – Houston, Texas, U.S.
Building: Texas Children’s Hospital: Pavilion for Women
Location: 6621 Fannin Street, Houston, TX
Status: Completed 2011
Architect: FKP Architects
Engineering Services: W.S. Bellows Construction Corporation
AE Interests: A two-story circular sky bridge connects the Pavilion for Women with the West Tower and Clinical Care Center. The building consists of multiple curves, no ninety degree angles, to enhance the views of and from the building.
—-
Hamburg-Harburg Technical University – Hamburg, Germany
Building: Hamburg-Harburg Technical University
Location: Hamburg, Germany
Status: Completed in 2012
Architect: GMP Architekten
Design: Meinhard von Gerkan and Nikolaus Goetze
AE Interest: retaining existing building substance with structural components, glass façades contrasting brickwork, vertical aluminium tubes, stainless steel cables
fall2012tth
Palm Springs Convention Center – Palm Springs, California, U.S.


Building : Palm Springs Convention Center
Location : Palm Springs , California
Completed: 2005
Architect: Fentress Architects
Engineer: ME Engineers
AE Interests: Cantilivered rock formations, integrated into the desert background
Novartis Campus- Basel, Switzerland
Building Name: Novartis Campus
Location: Fabrikstrasse 15, Novartis Campus, Basel Switzerland
Status: Completed 2009
Architect: Gehry Partners
Structural Engineer: Schlaich Bergermann und Partner
Mechanical Engineer: Aicher De Martin Zweng
Energy Consultant: Transsolar
AE Interest: open concept, sustainability, use of natural light, extensive use of glass, photovoltaic cells on roof, shades reduce solar gain and glare, natural ventilation
fall2012tth
The Wave in Vejle – Vejle, Denmark
Building: The Wave in Vejle
Location: Vejle, Denmark
Architect: Henning Larsen Architects
Completion: originally expected 2009, completed 2018.
AE Interests: Organic, Contemporary, Sculptural, Residential, Inspired by surrounding landscape, Reflection onto adjacent water
fall2012tth
Zapata Higher Education Center – Zapata, Texas, U.S.
Building: Zapata Higher Education Center/Zapata HEC
Location: 607 N US Hwy. 83, Zapata, TX 78576
Status: Completed 2010
Architect: ERO Architects
Contractor: FJW Construction
AE Interest: Building keyed into the contour of the land, passive solar energy of earth shelter, open north face shielded from direct light by trellis, green roof
fall2012tth
Forsyth Barr Stadium – New Zealand
Building: Forsyth Barr Stadium
Location: Dunedin, New Zealand
Status: Completed 2011
Architect: Populous
Structural Engineer: Sinclair Knight Merz
Estimated Cost: $200 million
AE Interests: The only permanently enclosed stadium with natural turf, designed to maximize sunlight, advanced Texlon ETFE roof, over 100 meter steel span, earthquake engineering, stadium space naturally ventilated, sustainable design
For more information on materials and design click here.
fall2012tth
The Scotts Tower – Singapore
Building: The Scotts Tower
Location: 38 Scotts Road, Singapore
Completion: Design Development Phase
Architect: UN Studio
Executive Architect: ONG&ONG
Structural Engineer: KTP Consultants
Mechanical Engineer: United Project Consultants
Landscape Architect: Sitetectonix
AE Interests: Residential Tower, Landscaped gardens, Sky terraces, Roof swimming facility, Angular elements, Voids in structure
fall2012tth
Norwegian Wild Reindeer Centre Pavilion – Dovre, Norway
Building: Norwegian Wild Reindeer Centre Pavilion
Location: Dovre, Norway
Status: Completed 2011
Architect: Snohetta
Structural Engineer: Kristoffer Apeland, Trond Gundersen
Contractor: Prebygg
AE Interests: Steel frame and wood core, Organic wood core designed using 3D modeling and manufactured by robot-controlled milling machine
Snohetta‘s project information
fall2012tth
Hangzhou Sports Park – Hangzhou, The People’s Republic of China
Building: Hangzhou Sports Park
Location: Hangzhou, The People’s Republic of China
Status: Set to be Completed 2013
Architect: NBBJ & CCDI
Engineer: NBBJ
Beautiful sets of parametric models by Nathan Miller here.
AE Interest: Stadium, Nature Inspired, Complex Geometries, Sustainability, Urban Center,
Fall 2012 tth
Gateway Center – Westchester Community College, Valhalla, New York, U.S.

Building: Gateway Center
Location: Westchester Community College, Valhalla, New York
Completed: 2010
Architect: Ennead Architects
Structural Engineer: Leslie E. Robertson Associates
MEP Engineer: Thomas Polise Consulting Engineer
Construction Manager: STV Group Inc
AE Interest: LEED Gold, Solar shading, Zinc-clad tower and cantilever section, Made with locally quarried stone, Energy efficient systems, Large aluminum and glass curtain wall, Exposed structural steel, Column-free daylit space, Underground HVAC ductwork
fall2012tth
Ordos Concert Hall – Inner Mongolia, China
Building: Ordos Concert Hall
Location: Kaokoashina New District, Ordos City
Architect: Yazdani Studio of Cannon Design
Client: Ordos Jiang Yuan Reservoir Co., Ltd.
Facilities: 1,200-seat main concert hall, 335-seat performance theatre, 100-seat black box theatre, lounges, restaurant
Design Concepts: circulation, metamorphosis, lightness, Inspired by a traditional “long-sleeve” Chinese Dance, collection of three “Villas”
AE Interests: undulating curves, multipurpose, BIM, solar controls, perforated metal building envelope, glass technology, green roof
Article: Design Concepts
Images: Autodesk
fall2012tth
V on Shenton – Singapore

Building: V on Shenton
Location: No. 5 Shenton Way, Singapore
Completion: Expected in 2016
Architect: UN Studio
Local Architect: Architects 61 Pte Ltd
Structural Engineer: DE Consultants Pte Ltd
M&E Consultant: J Roger Preston Pte Ltd
AE Interests: Cactus resemblance, Hexagon shape patterns on facades, Sky gardens. Lines of light on ceiling of ground floor to guide people to destinations
fall2012tth
Marion Oliver McCaw Hall – Seattle, Washington, U.S.
Building: Marion Oliver McCaw Hall
Location: 321 Mercer Street, Seattle, Washington
Status: Completed June 2003
Architect: LMN Architects
Engineering Services: Magnusson Klemencic Associates
Landscape Consultants: Gustafson Partners, Ltd.
Lighting Consultants: Brogden Lighting Design, Inc.
Acoustical Consultants: Jaffe Holden Acoustics, Inc.
AE Interests: Acoustically tuned rehearsal hall, climate controlled rehearsal pit, lobby bounded by five story glass walls, three dimensional fields of metal are used as a medium to project lights and images in public areas.
—-
Alexandria Library – Alexandria, Egypt
Building: Alexandria Library
Location: El Shatby, Alexandria, Egypt
Architect: Snøhetta
Structural Engineer: Hamza Associates
Consruction: Arab Contractors, Balfour Beatty Construction
Size: 915,000 sq. ft.
Completed 2001
AE Interests: Originally, the oldest library in the world, tragically destroyed in 48b.c. New building: Bold geometry, natural daylighting, reflective pools used for the building’s cooling and help clean the surrounding air.
In 1989, UT graduate Craig Dykers entered the international design competition with the newly founded firm, Snøhetta, and won! Craig became a co-founder and partner in the firm. `
—-ea
IT University of Copenhagen – Copenhagen, Denmark
Building: IT University of Copenhagen
Location: Copenhagen, Denmark
Architect: Henning Larsen Architects
Completion: 2004
AE Interests: Massing, Rectilinear, Drawer-like sections, Translucent
fall2012tth
Singapore Civic & Culture Center- Singapore
Building: Singapore Civic & Culture Center
Location: Vista Xchange precinct of one-north, Singapore
Status: Under construction, expected completion 2012
Architect: Aedas
Mechanical and Electrical: Mott MacDonald
Structural Engineer: Thornton Tomasetti
AE Interest: complex geometry, slanted columns and facades, floating design supported by four-story-deep wall trusses, extensive vibration analysis, sustainable design, open elevations encourage air movement, solar shading, rooftop garden
fall2012tth
Miguel Delibes Cultural Center – Valladolid, Spain
Architect: Ricardo Bofill, Taller de Arquitectura
Location: Valladolid, Spain
Builder: UTE Auditorio (Zarzuela s.a. / Dragados)
Engineering: Proyectes (Carlos Morancho) / Eduardo Palao (structure)
Acoustic Engineering: XU Acoustique
Total Surface Area: 40,000 sqm
Completed: 2007
Cost: €40,000,000
Photographs: Courtesy of Ricardo Bofill
AE Interests: curtain walls suuporting covered plaza, continuous reddish wall through front facade; undulating roof line reflects surrounding hills and music inside; interiors encourage movement, flow, and interaction throughout building
fall2012tth
Museum of the North Expansion – Fairbanks, Alaska, U.S.
Building: Museum of the North Expansion
Location: Fairbanks, Alaska
Status: Completed 2005
Architect: Hammel Green & Abrahamson
Engineer: Hammel Green & Abrahamson
AE Interests: Mixture of complex curvilinear and angular geometry, custom aluminum panel cladding
fall2012tth
Olympic Stadium – London, England, U.K.
Building: London Olympic Stadium, 2012 Summer Olympics
Location: London, United Kingdom
Completed: 2011
Estimated Cost: $854 million
Architects: Populous
Engineering Consultants: Buro Happold
Construction: Sir Robert McAlpine
AE Interests: Designed to hold 80,000 spectators during the Olympics then partially disassemble to create a permanent 25,000 seat stadium, translucent fabric wrap around exterior of building allows it to breathe naturally, complex steel framework, sustainable design.
Updated by: Emily Lamon
^
.
Weill Cornell Medical College – New York, New York, U.S.
Building: Weill Cornel Medical College
Location: New York, New York
Completion: expected in 2014
Architect: Ennead Architects
Engineering: JB & B
AE Interests: ennergy effiency, high performance double skinned fritted glass curtainwall
—-
Grand Hyatt Kuala Lumpur Hotel- Kuala Lumpur, Malaysia
Building: Grand Hyatt Kuala Lumpur Hotel
Location: 12 Jalan Pinang, Kuala Lumpur, Malaysia
Status: Completed 2010
Architect: WATG
Associate Architect: GDP Architects
AE Interest: gold tinted glass, metallic coated white glazing and cladding on exterior, one of the tallest buildings in Kuala Lumpur
fall2012tth
Oaxaco House and Studio – Oaxaca, Mexico
Building: Oaxaca House and Studio
Location: Oaxaca, Mexico
Completion: 2008
Architect: Taller de Arquitectura, Mauricio Rocha
Location: Oaxaca, Mexico
Construction: Francisco López
Structural: Grupo Sai
Size: 180 sqm
AE Interests: structural system of wood beams to support staggered volumes, cantilevered exterior and interior staircases, concept of “garden with a house as opposed to a house with a garden”
fall2012tth
Ordos Museum – Ordos, China
Building: Ordos Museum
Location: Ordos, China
Architect: MAD Architects
Associate Engineers: China Institute of Building Standard Design &
Research
Mechanical Engineer: The Institute of Shanxi Architectural Design and
Research
Façade/cladding Consultants: SuP Ingenieure GmbH, Melendez &
Dickinson Architects
Completion: 2011
AE Interests: Curvilinear, Nature, Sandstorm resistant panels, Natural lighting
fall2012tth
Valley Performing Arts Center – Northridge, California, U.S.
Building: Valley Performing Arts Center
Location: Northridge, California
Status: Completed 2010
Architect: Hammel Green & Abrahamson
Engineer: Hammel Green & Abrahamson
AE Interests: Sustainable design, LEED Gold Certified, Integration of HVAC, mechanical, and acoustic systems
Valley Performing Arts Center
fall2012tth
Bill and Melinda Gates Foundation Campus – Seattle, Washington, U.S.
Building: Bill and Melinda Gates Foundation Campus
Location: Seattle, Washington
Status: Completed 2011
Architect:NBBJ
Structural Engineer: KPF
Contractor: Sellen
Landscape Architect: Gustafson Guthrie Nichol
AE Interest: Platinum LEED, Green Roofing, Rain Water Harvesting, Energy Efficient Materials, Recycled Materials,Glass Facade, Cantilevers
—-
Volkswagen Plant – Chattanooga, Tennessee, U.S.
Building: Volkswagen Plant
Location: Chattanooga, Tennessee
Completion: 2010, operational 2011
Architect: SSOE Group
Structural: SSOE Group
Mechanical: W.J. O’Neil Co.
Sustainability: Vertegy
Contractor: SSOE Group
Size: 2.5 million sq-ft
AE Interests: first and only automotive manufacturing plant in the world to receive LEED Platinum; recycled 78% of construction waste; reflective roofing material
fall2012tth
Canada’s Sports Hall of Fame – Calgary, Alberta
Building: Canada’s Sports Hall of Fame
Location: 169 Canada Olympic Road SW, Canada Olympic Park, Calgary, Alberta
Completion: 2011
Architect: Stantec Architecture
Structural: Stantec Engineering
Project Manager and Design Builder: CANA Construction
Size: 44,000 sq-ft
AE Interests: innovative structural system to provide exhibition space; floating red “box” over glass entrance; elevated platorfms reflect atheletes’ status as well as integrate with site geography
fall2012tth
Reva and David Logan Center for the Arts – University of Chicago, Illinois, U.S.

Building: Reva and David Logan Center for the Arts
Location: 915 East 60th Street, Chicago, IL 60637
Status: Preview period began on March 26, 2012; Launch Festival on October 12-14, 2012
Architect: Tod Williams Billie Tsien Architects
Associate Architect: Holabird and Root
Structural Engineer: Severud Associates
MEP Engineer: Ambrosino, DePinto, and Schmeider
General Contractor: Turner Construction Company
AE Interest: Skylights, Felt paneled walls (interior), LEED silver, 3 Green roofs, Building Information Modeling (BIM) project
fall2012tth
Sanford Consortium for Regenerative Medicine – La Jolla, California, U.S.
Building: Sanford Consortium for Regenerative Medicine
Location: La Jolla, California
Completion: 2011
Architect: Fentress Architects
Engineer: HOPE Engineering
AE Interests: Leed GOLD, cantilivered “pods”, medical and scientific specifications
Dagu Bridge – Tianjin, China

Building: Dagu Bridge
Location: Tianjin, China
Completion: 2004
Architect: T.Y. Lin & Associates
Engineer: T.Y. Lin International Group
Lighting Design: Ted Ferreira
AE Interests: Asymmetrical arch bridge design, Built on soft soil, Built in high seismic region, Inclined arches
fall2012tth
Ann & Robert H. Lurie Children’s Hospital of Chicago- Chicago, Illinois, U.S.
Building: Ann & Robert H. Lurie Children’s Hospital of Chicago
Location: 225 East Chicago Avenue, Chicago
Status: Opened June 2012
Architects: Zimmer Gunsul Frasca Architects
Associate Architects: Solomon Cordwell Buenz, Anderson Mikos Architects
MEP Engineers: Affiliated Engineers Inc
Construction: M.A. Mortenson, Power Construction Company
AE Interest: tallest children’s hospital in the world, challenge of small site, fast construction schedule, MEP coordination, steel structure, cantilever floors, precast concrete grids on exterior, focus on soothing indoor environment to promote patient healing, pursuing LEED Silver certification
fall2012tth
Harbor Drive Pedestrian Bridge – San Diego, California, U.S.


Image Credit
Building: Harbor Drive Pedestrian Bridge
Location: San Diego, California
Completion: March 2011
Architect: Safdie Rabines Architects
Engineer: T.Y. Lin International Group
Construction: Reyes Construction, Inc.
AE Interests: One of the longest self-anchored pedestrian suspension bridges in the world, single pair of suspension cables, Pylon at 60 degree angle
fall2012tth
Centre De Congrès À Mons – Mons, Belgium
Building: Centre De Congrès À Mons
Location: Mons, Belgium
Status: Under Construction
Architect: Studio Daniel Libeskind
Structural Engineer: Ney & Partner
AE Interest: Advanced facade design, Spectacular siting, Concrete Design, Indirect natural light, Blends curvilinear and angular form language
fall2012tth
San Joaquin Administration Building – Stockton, California, U.S.
Building- San Joaquin Administration Building
Location- Stockton, California
Completed: 2009
Architect: Fentress Architects
Structural Engineer: Crosby Group
AE Interests: LEED Gold, natural lighting
Urban Oasis – Beach Road, Singapore
Building: Urban Oasis
Location: Beach Road, Singapore
Completion: Competition Design (May-August 2007)
Architect: UN Studio
Lighting Design: Arup Lighting
Climate Engineering: IB Leiser
Landscape Design: Bureau B+B
AE Interests: Residential, office, retail, and hotel spaces, Sustainable design, Gardens, Curvilinear Design
fall2012tth
Lady Bird Johnson Middle School – Irving,Texas, U.S.
Building: Lady Bird Johnson Middle School
Location: 2621 W. Airport Freeway, Irving,Texas, United States
Status: Completed 2011
Architect: interior designer: Corgan Associates
Civil engineer: Glenn Engineering
Client, owner: Irving Independent School District
Construction manager, general contractor: Charter Builders
Electrical engineer, mechanical engineer: Image Engineering Group
Geotechnical engineer: Terracon Consulting Engineers and Scientists
Landscape architect: Ramsey Landscape Architects
Structural engineer: L.A. Fuess Partners
For information on Energy Specifics click here
AE Interest: Net-Zero, Geothermal HVAC, Gold LEED, Passive solar interior lighting, Solar Energy, Wind Energy, efficient building envelope, high efficency kitchen, advanced controls systems,rain water harvesting
Suzhou Science and Cultural Arts Center – Jiangsu Province, China
Building: Suzhou Science and Cultural Arts Center
Location: Suzhou Industrial Park, China
Status : Completed in 2008
Client: City of Suzhou
Master Contractor: Paul Andreu Architects & ADPi
Architect: M.Flory
Owner: C.S. Land
Facilities: wall garden, 1200 seat theatre, 500 seat dining theatre, cineplex with IMAX, thematic science center, commercial center
Building Height: 34.5 m
Materials: steel structure, aluminum alloy truss, glass, aluminum panel, metal mesh, stone
Area of Curtain: 82,000 m2
Curtain Wall Consultant: CPG Environmental Engineering Co. Ltd Suzhou Office
Audio Technical Consultants: Theatre Project Consultant, Rightway Audio Consultants, Yavatop Technology
AE Interests: Curtain wall design, acoustics, theatre design, aseismic design, building envelope lighting
Articles: Curtain Wall, Facilities(Keyword: Suzhou Science),Acoustics
Images: Paul Andreu Architects, DingManPhotos, Theatre Projects
fall2012tth
Bridge Over Ijssel – Zwolle, The Netherlands
Building: Bridge Over Ijssel
Location: Zwolle, The Netherlands
Completion: Competition Entry
Architect: UN Studio
AE Interests: Cable construction, Sound barriers, Outside trusses colored to reflect water and sky, Orange interior color resembles rooftops of the area, Asymmetric trusses
fall2012tth
King David the Builder International Airport – Kutaisi, Georgia
Building: King David the Builder International Airport
Location: Kutaisi, Georgia
Completion: 2012
Architect: UN Studio
AE Interests: Glass curtain walls, Angular, Central point preventing intertwining traffic, Exterior garden, Air traffic control tower complements terminal design
fall2012tth
Isabella Stewart Gardner Museum Extension – Boston, Massachusetts, U.S.


Images 1, 2
Building: Isabella Stewart Gardner Museum
Location: 280 The Fenway, Boston, Massachusetts
Completion: 2012
Architect: Renzo Piano Building Workshop in collaboration with Burt, Hill and Stantec
Structural and MEP Engineer: Buro Happold
Civil Engineer: Nitsch Engineering
Construction Manager: Shawmut Design and Construction
Construction Cost: $140 million
Size of Addition – 70,000 sq-ft
AE Interests: targeted for LEED Gold by using geothermal wall system, daylight harvesting, and use of local and responsibly sourced materials; slanted curtain walls; steel, glass, and prepatinated copper cladding
fall2012tth
Inner-City Arts – Los Angeles, California, U.S.
Building: Inner-City Arts School
Location: Los Angeles, California
Completion: 2008
Architect: Michael Maltzan Archichects
Structural Engineer: John A. Martin and Associates
AE Interests: Natural Lighting, complex geometry, exposed structures
—-
Water Pyramid – Pemana, Indonesia
Building: Water Pyramid
Location: Pemana,Indonesia
Status: Completed 2006
Designer: Aqua-Aero Watersystems
Engineering:MWH
AE Interest: Sustainable Development, Potable Water treatment, Solar Energy, Desalinization, Modular, Appropriate Technology
Fall 2012 tth
John E. Jaqua Academic Center for Student Athletes- Eugene, Oregon, U.S.
Building: John E. Jaqua Academic Center for Student Athletes
Location: The University of Oregon, 1615 E. 13th Avenue, Eugene, Oregon
Status: Completed January 2010
Architect: Zimmer Gunsul Frasca Architects
Structural Engineers: KPFF Consulting Engineers
Facade Engineers: ARUP
MEP Engineers: Interface Engineering
General Contractor: Hoffman Construction Company
More People
AE Interest: double wall facade provides acoustic isolation and thermal insulation, steel screen provides solar shading and privacy, use of diffused natural light, reinforced concrete frame using post tension concrete slabs.
fall2012tth
Al Hitmi Complex – Doha,Qatar
Building: Al Hitmi Complex
Location: Doha Corniche , Doha, Qatar
Status: Completed 2010
Architect and Engineering: NORR Limited
AE Interest: Angular Forms, Glass Facade, Atrium, Modern, Complex Geometry
Fall 2012 tth
Kathlyn Joy Gilliam Collegiate Academy – Dallas, TX, U.S.


Building: Kathlyn Joy Gilliam Collegiate Academy
Location: 1700 E. Camp Wisdom Road, Dallas, Tx
Status: Completed 2011
Architect: SHW Group
AE Interests: CHIP( Criteria for High Performance schools) approved, sustainable materials such as bamboo, uses geothermal heating and cooling by running refrigerant from the air conditioning system 300 feet under the ground to be cooled and heated by the earth.
—-
Central Saint Giles – London, U.K.
Building: Central St. Giles Court Mixed-use Development
Location: London, United Kingdom
Status: Completed May 2010
Architects: Renzo Piano Building Workshop
Architect of Record: Fletcher Priest Architects
Engineers: Arup
AE Interest: Unique facets differ from each other, lower facades allow for transparency, complex volumes adjusted and scaled to surrounding buildings.
^
.
Langley Academy – Slough, England, U.K.
Building: Langley Academy
Location: Langley Road, Langley, Berkshire, SL3 7EF
Status: Completed 2008
Architect: Foster + Partners
Project Architect: Nigel Dancey, Iwan Jones
Structural Engineer: Buro Happold
Main contractor: Wates
AE Interest: Large energy savings of 150 tons annually, solar hot water system helps save 20% in energy consumption by harnessing rain water from the roof, energy-efficient, shaded by horizontal and vertical louvers, round science labs lifted in the middle of the room supported by columns, visible infrastructure of ceiling.
2012fallmwf

















































































































































leave a comment