AEWORLDMAP.COM (3,300+ posts)

KK100 – Shenzhen, China

Posted in Built by Sharon Zhu on September 4, 2015

Kingkey 100 Development  Kingkey 100 Development  kk100_3
1,2,3

Building: KK100
Location: Shenzhen, China
Architect: TFP Farrells
Engineering: Ove Arup & Partners
(Structural, Fire, Wind, MEP, Traffic)
Contractor: China Construction Fourth Engineering Division Corp. Ltd.
Project Manager: Shenzhen KingKey real Estate Development Co. Ltd.
Completion: 2011

AE Interests: Tallest building in the world in 2011 (100 floors), horizontal and vertical fins reduce glare and solar gain, free cooling system used, mixed use tower, complex form at pedestrian entry, expressed steel structure, LEED Gold.

“City of Dreams” Hotel Tower – Cotai, Macau `

Posted in Built by Sharon Zhu on September 4, 2015

City of Dreams_1  City of Dreams_2  City of Dreams_3
1,2,3

Building: “City of Dreams” Hotel Tower
Location: Coati, Macau
Completion: 2017
Architect: Zaha Hadid Architects
Developer: Melco Crown Entertainment Limited
Structural Engineer: Mott Connell Ltd.
MEP: Jebson Consultants & Engineering Co. Ltd.
Facade Engineer: Buro Happold
Fire Engineer: Arup
Traffic Engineer: MVA

AE Interests: Giant transfer beams and trusses used to create open spaces, complex external structural web carries both gravity and lateral forces, reinforced concrete used in stair and lift core walls to create lateral stability, external exoskeleton structure.

Articles: 1

East Tower – Guangzhou, China

Posted in Built by Karlie Hoh on September 4, 2015

ctf_guangzhou_courtesy_of_kohn_pedersen_fox_associates      1304171556e83de770a2156bad526f672c_zps5ded215d    Cg-4WVH9DY6ITn7BAAciptgtcNwAAKn1AHQjpUAByK-438

1,2,3

Building: East Tower (CTF Finance Centre)
Location:  Zhujiang E Rd, Tianhe, Guangzhou, Guangdong, China
Architect: Kohn Pederson Fox Associate
Structural Engineer : Arup
MEP Design: Parsons Brinckerhoff Consultants Private Limited
Main Contractor: China State Construction Engineering Corporation
Status: Under construction

AEinterest: 1738 feet(530 meter, 112 floors), Seismic Design with eight columns at the tower perimeter, central core with outriggers and belt trusses. Fastest elevator, 20 meter per second.

Article: 1

Beitou Public Library – Taipei, Taiwan

Posted in Built by Casey Gragg on September 4, 2015

beitou public library  beitou public library1
[1,2]

Building: Beitou Public Library
Location: Beitou Hot Springs Park, Taipei, Taiwan
Architect: Chang Ching-Hwa of Bio-Architecture Formosana
General Contractor: Hwa-Bon Construction Co. Ltd.
Completion: 2006

AE Interests: Taiwan’s first “green” library, first to receive a Diamond grade EEWH Green Building Label in Taiwan, solar panels, rainwater collection, rainwater permeable pavement, a reconstruction from a previous building with structural issues, use of timber from managed forests for the main structure

Articles: 1, 2

Sheikh Zayed Grand Mosque – Abu Dhabi, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 4, 2015

6e4fd8fd5e6d8518bd4bc864ea741925  Zayed 2  sheikh-zayed

[1, 2, 3]

Building: Sheikh Zayed Grand Mosque
Location: Abu Dhabi, United Arab Emirates
Architect: Halcrow (Yusuf Abdelki)
Structural Engineer: Tractabel Al Khaleej
Electrical Engineer: Speirs and Major Associates
Contractor: Salini Impregilo
Completion: 2007

AEInterests: 82 marble decorated domes of Moroccan design, approximately 1,000 outdoor columns, unique lighting system used to reflect the phases of the moon on the building, displays traditional Islamic designs of symmetry and repetition through the use of modern techniques of mosaic and sand blasted glass.

The Yardmaster’s Building, Melbourne, Australia

Posted in Built by Ni Li on September 3, 2015

yardmaster01  yardmaster07
1, 2

Building: The Yardmaster’s Building
Location: Melbourne, Australia
Architects: McBride Charles Ryan
Structural Consultant: Van Der Meer Consulting
Service Consultant: ALA Consulting Engineers
Environmental consultant: Cundall
Cost Consultant: Newton Kerr and Partners
Builder: FIMMA Constructions
Project Year: 2009
AE Interests: A multi-use facility associated with the Southern Cross Rail Yard. Concrete structure and exterior walls. Energy efficient design. (1)

—-rl

Gate Tower Building – Osaka, Japan

Posted in Built by John Chen on September 3, 2015

 
1, 2

Building: Gate Tower Building
Location: Osaka, Japan
Design Architect: Azusa Design and Yamamoto-Nishihara Design Firm
Main Contractor: Sato Kogyo Co. Ltd.
Completion: 1992
Height to tip: 71.9 m (236 ft)
Floors above ground: 16 (highway cuts through 5-7th floor)

AE Interests: highway cutting through middle of building, double-core structure, vibration and noise control.

video

Kamigata Rakugo Association Hall – Osaka, Japan

Posted in Built by John Chen on September 3, 2015

 

1, 2

Building: Kamigata Rakugo Association Hall
Location: Osaka, Japan
Design Architect: Tadao Ando
Main Contractor: Makoto Construction Co. Ltd.
Completion: 2012
Height: 12.563m
Total Floor Space: 263.54m2
Floors above ground: 3

AE Interests: delivering natural light to interior space, reinforced concrete structure.

video

Organic Building – Osaka, Japan

Posted in Built by John Chen on September 3, 2015

 

1, 2, 3

Building: Organic Building
Location: Osaka, Japan
Design Architect: Gaetano Pesce
Architect of Records: UD consultants, Inc.
Main Contractor: Cohnan Construction Inc.
Completion: 1989
Building footprint: 675.7m2
Floors above ground: 9

AE Interests: vertical garden, plant-clad exterior, sustainability in urban environment, steel reinforced concrete structure.

Article: 1

Vancouver House – Vancouver, Canada

Posted in Built by Kendall Williams on September 3, 2015

Vancouver-House-1  3  4
1, 2, 3

Building: Vancouver House
Location: Vancouver, Canada
Architect: Bjarke Ingeles
Structural Engineers: Goltman Simpson Consulting Engineers and Buro Happold
MEP Engineers: Integral Group
Status: Completion in 2018
Height: 497 feet
Stories above Ground: 59 stories

AE Interest: LEED platinum certification, 10 story glass podium base, triangular base that evolves to a rectangle at the top, lattice style balconies.

video 1, video 2

 

Abeno Pedestrian Bridge – Osaka, Japan

Posted in Built by John Chen on September 3, 2015

 

1, 2

Building: Abeno Pedestrian Bridge
Location: Osaka, Japan
Design Engineer: Chuo Fukken Consultants Co.,Ltd.
Main Contractor: City of Osaka Department of Infrastructure
Completion: 2013
Total Length: 196.74m
Width: 3.5-9.5m

AE Interests: steel girder bridge, varying deck width, long span nonlinear bridge, urban pedestrian traffic, linking busy subway station exit to multiple destinations.

video

1500 West Georgia – Vancouver, Canada

Posted in Built by Kendall Williams on September 3, 2015

1500_West_Georgia_by_Ole_Scheeren_©_Buro-OS_01    1500_West_Georgia_by_Ole_Scheeren_©_Buro-OS_04  VAN_150515_concept_simple_massing
1, 2, 3

Building: 1500 West Georgia
Location: Vancouver, Canada
Design Architect: Buro Ole Scheeren
Structural Engineering: Glotman Simpson Consulting Engineers
MEP Engineer: Nemetz & Associates 
Construction: MMM Group
Status: Commission – February 2015
Height: 48 residential floors above 2 ground levels, 6 basement floors

AE Interest: aspires to LEED platinum, horizontal rotation of modular elements projects outward to maximize views, rooftop sustainability feature

HIT3 – Buenos Aires, Argentina

Posted in Built by Kyle Brown on September 3, 2015

hit3  hit3.0    Model
1, 2, 3

Building: HIT3
Location: Buenos Aires, Argentina
Design Architect: Alejandro Gawianski
Architect of Record: Julio Calcopietro
Structural Engineers: Curutchet-Del Villar Ingenieros Civiles
MEP Engineer: Estudio Grinberg
Main Contractor: AG3 Developments SA
Completion: 2015

AE Interests: entirely glazed facade, sliding carpentries allow user to shape interior spaces for different uses, curved terraces, vertical sunshades to maximize natural light

Hackney Service Centre – London, England, U.K.

Posted in Built by Sarah Meixner on September 3, 2015

Hackney Service Centre 1 Hackney Service Centre 3 Hackney Service Centre 2
1, 2, 3

Building: Hackney Service Centre
Location: London, England, U.K.
Architect: Hopkins Architects
Structural Engineer: Halcrow Group
Services Engineer: Jacobs
Contractor: Osborne Construction
Completion: 2010

AE Interests: sustainability, earned the BREEAM “Excellent” award, use of gas and wood pellet boilers and a large photovoltaic array in the glazed roof of the atrium, winner of the RIBA 2011 Regional Award, use of natural light

—–rl

Repsol Headquarters – Madrid, Spain

Posted in Built by Callen Holguin on September 3, 2015

picture_12076  Repsol_headquarters_(Madrid)_07

1, 2

Building: Repsol Headquarters Madrid: Spanish Office Campus
Location: Calle de Méndez Álvaro, 50, 28045 Madrid, Spain
Architects: Rafael de La-Hoz
Completion: 2013
Area: 123,000 sqm
Facilities Specialist: Rafael Úrculo
Landscaping Artist: Tilman Latz
Builder: Sacyr

AEInterests: Glass panels, large steel supports
Awards: The Iberoamerican CIDI Council Award: ‘2015 Landmark Building’
LEED Platinum Certification – One of the most sustainable buildings in Europe

Galaxy Soho – Beijing, China

Posted in Built by Travis Potter on September 3, 2015

ZH_Galaxy_Soho_074 ZH_Galaxy_Soho_013
1
, 2

Building Name: Galaxy Soho
Location: Soho, Beijing, China
Architect: Zaha Hadid
Project Architect: Yoshi Uchiyama
Local Design Institute: BIAD Beijing Institute of Architecture & Design
Local Contractor: China Construction First Building Group
Area: 332857.0 sqm
Height: 67 meters
Project Year: 2012

AE Interest: Composition of five continuous, flowing volumes that are set apart, fused or linked by stretched bridges

Articles: 1, 2

—-rl

Polonsky Shakespeare Center – Brooklyn, New York, USA

Posted in Built by Arlene Ellwood on September 3, 2015

Polonsky Shakespeare Centerce-Front-View-5-25-11-800-pix  Polonsky Shakespeare Center  Polonsky Shakespeare Center - Inside

1,2,3

Building: Polonsky Shakespeare Center (Theatre for a New Audience)
Location: 262 Ashland Place, Brooklyn, NY 11217
Architect: Hugh Hardy
Structural Engineer: Robert Silman Associates
Construction Manager: F.J. Sciame Construction Company
Completion: October 2013

AE Interests: cantilevered entrance, designed to be flexible for many different types of performances with nine stage configurations, very simple profile, acoustic insulation – located above a subway, uses a 12-inch concrete slab above 8-inch thick steel-reinforced rubber pads that isolate vibrations, exposed structural beams inside, energy efficient, large glass facade

Articles: 1, 2

—-rl

Colección de Arte Amalia Lacroze de Fortabat – Buenos Aires, Argentina

Posted in Built by Kyle Brown on September 3, 2015

fortabat1  fortabat 3


ROMAN_111, 2, 3

Building: Colección de Arte Amalia Lacroze de Fortabat
Location: Buenos Aires, Argentina (Puerto Madero district)
Design Architect: Rafael Vinoly
Structural Engineers: Rafael Vinoly Architects PC
Main Contractor: CRIBA
Completion: 2008

AE Interests: arced roof with twelve operable louvers controlling the amount of sunlight that enters the building, curved glass roof supported by steel ribs, two lower rooms set below the water

more info

Barin Ski Resort – Shemshak, Iran

Posted in Built by Joshua Shokraeifard on September 3, 2015

  barin-ski-resort-05
1 ,23

Building: Barin Ski Resort
Location: Shemshak, Iran
Architect: RYRA Studio
Main Contractor: Problem Company
Structural Engineer: Mr Kamran Edraki – Edraki
Client / Developer: Barin Group
Environmental Engineer: Azmayesh
Completion: 2009
Area: 60 sqm per unit

AEInterests: Igloo inspired design, environment driven design, Combined Metaphoric Design between nature and man-made objects , regional design, laser cut corian and MDF interior elements.

Articles: 123, 4

Vancouver Convention Centre West – Vancouver, Canada

Posted in Built by Kendall Williams on September 3, 2015

wepa_13  pbct_12  Vancouver-WAF-19  stringio
1, 2, 3, 4

Building: Vancouver Convention Center West
Location: Vancouver, Canada
Completed: 2009
Architects: LMN, DA Architects & Planners, Musson Cattell Mackey Partnership (MCM)
Project Manager: Stantec Consulting
Structural Engineer: Glotman Simpson Consulting Engineers
Mechanical Engineer: Stantec Consulting
Contractor: PCL Construction Enterprises

AE Interest: LEED Canada Platinum (first Convention Center to gain this recognition), 6 acre living roof, sea water heat pump, structural glass skin.

1, 2

—-rl

Torre Diagonal Zero Zero – Barcelona, Spain

Posted in Built by Brett Harbin on September 3, 2015

torre diagonal  torre diagonal interior  torre diagonal steel
1, 2, 3

Building: Torre Diagonal Zero Zero
Location: Barcelona, Spain
Architect: EMBA
Structural Engineer: Julio Martinez Calzon
Construction: Dragados
Height: 110 m
Floors: 25
Completed: 2011
Use: Commercial office

AE interests: trapezoidal prism, tube-in-tube structural scheme, interior structure composed of small vertical columns, exterior diagonal grid for gravity and lateral loads, erected in 8 months, open-plan working floors

Articles: 1, 2
Video

Melbourne School of Design, Melbourne, Australia

Posted in Built by Ni Li on September 3, 2015

 1  2  3

1 2 3

Building: Melbourne School of Design, University of Melbourne
Location: Melbourne VIC, Australia
Architects: John Wardle Architects , NADAAA
Landscape Architect : Oculus
Mechanical/Electrical Engineer : Aurecon Group
Structural/Civil Engineer : Irwinconsult
Acoustic Consultant : AECOM
Project Year: 2014

AE Interests: The coffered timber roof mediates natural daylight and assists natural ventilation. The building incorporates a number of innovative structural and services systems combined with building’s façade system. (1)

—-rl

Nuestra Señora De Guadalupe Chapel – Chihuahua, Mexico

Posted in Built by Alvaro Gloria on September 3, 2015

 
1 , 2

Building: Nuestra Señora De Guadalupe Chapel
Location: Chihuahua, Chihuahua, Mexico
Architect: COA Arquitectos
Project Architect: Francisco Ortiz Aguilera
Concrete Design: PH Diseño
Steel Design: EMYCSA

AE Interests: outdoor multipurpose space able to accommodate large social and religious gatherings, cast-in-place concrete walls, steel columns and framing, perforated metal shading screen.

 

 

 

Reid Building, Glasgow School of Art- Glasgow, UK

Posted in Built by Annabel Crane on September 3, 2015

steven-holl-seona-reid-building-glasgow-school-of-art-designboom-01B  Glasgow-School-of-Art-by-Steven-Holl-_dezeen_28  Steven Holl Architects . JM Architects . Glasgow School of Art (58)
1,2,3

Building: Reid Building at the Glasgow School of Art
Location: Glasgow, UK
Architect: Steven Holl
Completion: 2014
Structural and Mechanical Engineers: Arup

AE Interest: Five story building wraps around existing stone assembly hall, geometric matte- glass exterior, three cylindrical shafts of light

—-rl

Folkwang Library – Essen, Germany

Posted in Built by Parker Burns on September 3, 2015

Folkwang-Bibliothek-2    folkwang libraryfolkwang screens
1, 2, 3

Building: Folkwang Library
Location: Essen, Germany
Completion: September 19th, 2012
Architect: Max Dudler
Project Manager: Alexander Bonte
Contractor: Derichs u. Konertz GmbH & Co. KG
HVAC Engineer: ZWP Ingenieur – AG
Structural Engineers: Leonhardt, Andrä und Partner – Consulting Engineers VBI, GmbH
Acoustics: Müller-BBM GmbH

Total Cost: 7.4 Million Euros
Area: 5,603 m2

AE Interests:  Printed glass facades, energy efficiency, heat sinks, natural light, reinforced concrete ceilings, wood-clad concrete columns, quarry stone

Video
Article

Chapel of St Albert the Great- Edinburgh, UK

Posted in Built by Annabel Crane on September 3, 2015

 
1,2

Building: Chapel of St Albert the Great
Location: George Square, Edinburgh, UK
Design Architect: Simpson & Brown
Completion: 2012
Structural Engineer: Elliott & Company
Collaborators: George Berry & Partners

AE Interest: Corton steel ‘tree like’ columns, curved timbre roof, sandstone clad masonry wall reflects surrounding townhouses, RIBA National award

Video, Plan

Victoria One – Melbourne, Australia

Posted in Built by Ni Li on September 3, 2015

Victoria_One 1  Victoria_One_2  4

1, 2, 3

Building: Victoria One Location: Melbourne, Australia
Design Architect: Elenberg Fraser
Developer: Golden Age Group
Structural & Civil Engineer: Robert Bird Group
Fire Engineer: AECOM Fire Engineers
Wind Engineer: MEL Consultants
Project Manager: Sinclair Brook
Status: Under Construction
Estimated Completion: 2017/2018

AE Interests: Melbourne’s tallest residential tower with 241 m height. 629 residential units, each featuring floor to ceiling windows, winter gardens. Includes a pool, spa, gym, multiple lounges, and a club.

Alexander Forbes Headquarters – Johannesburg, South Africa

Posted in Built by Ian Moffatt on September 3, 2015

Full Side View   Underside Panel View   Construction View

1, 2, 3

Building: Alexander Forbes Headquarters
Location: Sandton Johannesburg, South Africa; 115 West St.
Architect: Paragon Architects
Structural Engineers: PERI
Consulting Engineers: Sotiralis Consulting Engineers (Pty) Ltd
Chief Contractor: WBHO/Tiber Joint Venture
Facade Contractor: Rohde Roofing CC
Completion: 2014
Size: 8 floors, 36,950 sq meters

AE Interests: recipient of the AfriSam-SAIA Award for Sustainable Architecture for 2014 in the built category, accommodates Alexander Forbes’ 2,200 member Johannesburg staff, 4-Star Green Star office design rating from the Green Building Council of South Africa (GBCSA), S-shaped scallop walls on the west and east facing walls, flat concrete slab with slanted concrete column structure

Quingpu Pedestrian Bridge – Shanghai, China

Posted in Built by Elena Arca on September 3, 2015

 qpb3  qpd6
1,2,3

Building: Quingpu Pedestrian Bridge
Location: Quingpu, Shanghai, China
Architect: CA-GROUP
Structural Engineer: Bridge Structures Department of Tongji University
Construction: Shanghai Greenland Construction (Group) Co. Ltd.
Client: Shanghai Qingpu New City Construction Development (Group) Co. Ltd.
Completed 2008

AE Interests: angular form, asymmetrical structural supports, sloped ceiling designed to capture and reflect artificial and natural light.

New City Hall – Buenos Aires, Argentina

Posted in Built by Kyle Brown on September 3, 2015

New-City-Hall-in-Buenos-Aires-by-Foster-Partners-00  buenos-aires-ciudad-casa-de-gobierno-6@2x  edit short-section
1, 2, 3

Building: New City Hall
Location: Buenos Aires, Argentina
Design Architect: Foster + Partners
Architect of Record: BBRCH-Minond
Structural Engineers: Curutchet-Del Villar Ingenieros Civiles
MEP Engineer: Estudio Grinberg
Main Contractor: CRIBA
Completion: 2015

AE Interests: LEED Silver, reinforced-concrete roof, continuous wave form, four-story high atrium, long-span structure, skylights, interior courtyards

ThyssenKrupp Quarter – Essen, Germany

Posted in Built by Parker Burns on September 3, 2015

Thyssen-Krupp Quartier, Essen  thyssenkrupp_p_1294
1, 2

Building: ThyssenKrupp Quarter
Location: Essen, Germany
Completion: 2010
Architect: JSWD Architects/Chaix & Morel et AssociésOverall
Planning: ECE Projektmanagement GmbH & Co. KG
Facade Consultants: Priedemann, Berlin und Werner Sobek
Structural Engineering: IDN Ingenieurbüro
Lighting Design: Licht Kunst Licht AG
Construction Sunshade Facade: Frener + Reifer

Area of Q1 Building: 170,000 m2
Major Awards: 2012 German Steel Construction Award, Gold certificate by the German Society for Sustainable Building (DGNB), Best Sustainable Technology Incorporated into a Building “LEAF”  Award

AE Interests: Sustainability, light engineering, corporate campuses, sun protection systems, steel facades, energy efficiency

520 West 28th Street – Manhattan, New York, USA

Posted in Built by Arlene Ellwood on September 3, 2015

520 West 28th Street 
520 West 28th Street

1,2

Building: 520 West 28th Street
Location: Manhattan, New York, USA
Design Architect: Zaha Hadid Architects
Structural Engineer: DeSimone Consulting
Facade Consultant: Gilsanz Murray Steficek LLP (GMS)
Service Engineer: AKF
Completed: 2013

AE Interests: architecturally acts as extension of nearby High Line Park, dynamic design, curvy, space-age structures, two distinct zones which are both separated and merged together by the chevron pattern, 11 stories with approximately 37 private residences

Articles: 1, 2

Parish Church of Santa Monica – Madrid, Spain

Posted in Built by Callen Holguin on September 3, 2015

OLYMPUS DIGITAL CAMERA   

1 2 3 4

Building: Parish Church of Santa Monica
Location: Madrid, Spain
Architect: Vicens & Ramos
Structural Consultant: Andres Rubio
Facilities Consultant: 3i
Completion: 2009

AEInterests: Geometric window protrusions, interior natural lighting, structural steel

International Sport Arena – Guangzhou, China

Posted in Built by Karlie Hoh on September 2, 2015

 

20115113347s ntq2at4yk9gv3vvj

1, 2

Building : Guangzhou International Sport Arena
Location: Luogang Distric, Guangzhou, China
Architect: MANICA Architecture , Guangzhou Design Institute
Structural Engineer : Guangzhou Design Institute
Main Contractor: Mortenson Construction
Capacity: 18000

AE interest: Anodized aluminum panels, Low-E insulating laminated glass curtain wall, GRG reinforced glass fiber gypsum board used for kiosk and lobby, Epoxy resin sand (sand pressure) technology for seamless pavement.

Article: 1

Guangzhou Library – Guangzhou, China

Posted in Built by Karlie Hoh on September 2, 2015

_D0U4014_2pd  2-1  SECTION-090611

1, 2, 3

Building: Guangzhou Library
Location: 4 Zhujiang Dong Road, Zhujiang New Town, Guangzhou, China
Architect: Nikken Sekkei LTD
Main Contractor: Shenzhen Keyuan Construction Group
MEP:Guangzhou Design Institute
Construction period: February 2006 to October 2012
Building area: 8,005.00㎡

AEinterest : The world’s largest open-stack public library. Atrium cuts across the building with glazed roof. Deeply chiseled,stone exterior envelope controls sunlight.

Article : 1

UniCredit Tower – Milan, Italy

Posted in Built by Crystal Govea on September 2, 2015

7bf944b9f0984647a5de59cd361d8a96  Milano-Piazza-e1420910437723  2048

1, 2, 3

Building: UniCredit Tower
Location: Milan, Italy
Design Architect: Pelli Clarke Pelli Architects,
Architect of Record: Adamson Associates
Structural Engineers: MSC Associati S.r.l.
MEP Engineer: Ariatta Ingegneria di Sistemi s.r.l.; Buro Happold
Main Contractor: Colombo Costruzioni S.p.A.
Completion: 2012
Height to tip: 231 m
Floors above ground: 33

AE Interests: LEED Gold, high-rise, Italy’s tallest building, rainwater is recycled, built-in sunshading devices, asymmetrical main tower culminates in a sculptural, stainless steel spire, curved facade.

Video

Siemens HQ – Masdar City, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 2, 2015

Sheppard Robson Architects  siemens 2  sketch

[1, 2, 3]

Building: Siemens HQ
Location: Masdar City, United Arab Emirates (right outside of Abu Dhabi)
Architect: Sheppard Robson
Structural and MEP Engineer: AECOM
Contractor: Al Fara’a
Project Manager: Morganti
Completion: 2013

AEInterests: Achieved LEED Platinum certification, airtight facade designed to reduce thermal conductivity, variation in shading system form characterized by light-weight aluminum fins with each facade tailored to suit its solar orientation.

Joe and Rika Mansueto Library – Chicago, Illinois, U.S.

Posted in Built by Isaac Nimick on September 2, 2015

Mansueto 1Mansueto ConstructionMansuelo 2

 

 

 

 

1,2,3

Building: Joe and Rika Mansueto Library
Location: 1100 E. 57th St., Chicago, Illinois
Completion: 2011
Architect: Helmut Jahn – Murphy/Jahn Architects
Structural Engineer: Werner Sobek
MEP Engineer: Environmental Systems Design
Civil and Landscape Engineer: Terra Engineering
Contractor: Barton Malow

AE Interests: elliptical glass dome composed of 691 glazed panels and reaching 35 feet tall at its highest point. Glass at base is transparent to allow unobstructed views, but roughly a third of the way up, a ceramic frit covers 57 percent of the interior surface to reduce glare. Currently, 1 million volumes are stored underground and are accessed by the libraries automatic retrieval system. Constructed using glass and steel.

 

Trump International Hotel and Tower – Chicago, Illinois, U.S.

Posted in Built by Isaac Nimick on September 2, 2015

Trump TowerTrump Tower

Trump Construction

 

 

 

 

 

 

1,2,3

Building: Trump International Hotel & Tower
Location: 401 N. Wabash Ave, Chicago, Illinois, U.S.
Completion: 2009
Architect: Adrian Smith – Skidmore, Owings & Merrill
Structural  and Civil Engineer: Skidmore, Owings & Merrill
Mechanical Engineer: WMA Consulting Engineers, Ltd
Construction Manager: Bovis Lend Lease

AE Interests: Includes three setbacks to acknowledge surrounding skyline. Building has a concrete core with several outriggers. The outriggers connect its central core with an exterior ring of structural columns. Stainless steel, curtain-wall façade. Cassion foundation. Chicago’s second tallest building at 1,388.45 ft. with 98 floors above ground and 2 floors below ground.

 

Al Bahar Towers – Abu Dhabi, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 2, 2015

Al Bahar Towers 1  Al Bahar Towers 3  Al Bahar Towers 4

[1, 2, 3]

Building: Al Bahar Towers
Location: Abu Dhabi, United Arab Emirates
Architect: Aedas Architects
Structural and Acoustic Engineer: Arup
General Contractor: Al-Futtaim Carillion
Completion: 2012

AEInterests: Responsive facade using traditional Islamic geometry for lattice shading device, triangle screens respond to sun movement to reduce solar gain and glare, all screens close during the evening.

Abu Dhabi Central Market – Abu Dhabi, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 2, 2015

AD Central Market 1  AD Central Market 2  AD Central Market 4  AD Central Market 3

[1, 2, 3, 4]

Building: Abu Dhabi Central Market
Location: Abu Dhabi, United Arab Emirates
Architect: Foster + Partners
Structural Engineer: Halvorson and Partners
MEP Engineer: BDSP Partnership
Facade Consultant: Arup
Contractor: Arabian Construction Co.
Completion: 2012

AEInterests: Individual facade glazing using Arabic geometry, green roofs, high energy efficiency, open roofs to implement natural lighting and cooling.

The Oliv Condominium – Singapore

Posted in Built by My Vu on September 2, 2015

oliv_1oliv_2oliv_3

[1, 2, 3]

Building: The Oliv Condominium
Location: 11 Balmoral Road, Singapore
Completion: 2012
Architect: W Architects
Structual/Civil Engineers: Tham & Wong LLP
Contractor: Venturer Pte Ltd
Timber Consultants: EWS Consultants

AE Interests: Use of textured concrete, timber strips, and movable aluminum screens; beam and slab system; terraces are inspired by elevated topography, each one communally shared by two adjacent apartments (to be exempted from gross floor area calculations under urban regulations), but is designed and divided by a subtle line within the wood decking to provide a sense of private property for each owner.

Articles: 1, 2

Alpha Apartments in Lewisham – Sydney Australia

Posted in Built by Eric Nunez on September 2, 2015

Day1  Sky Unit1  Alpha-Apartments-Lewisham-by-Tony-Owen-Partners-14
[ 1 , 2 , 3 ]

Building: Alpha Apartments
Location: Lewisham, Sydney, Australia
Architect: Tony Owen Partners
Completion: 2015

AE Interests: Ecologically sustainable development, hexagonal pod-like façade (manufactured as a single aluminum extrusion). Alpha’s construction was a way to prove contemporary design can be as cost-effective as traditional designs. Top levels exit onto terraces through hexagonal sky units with panoramic views of the surrounding parklands, two-story lounges on every floor foster a sense of community among residents.

Articles: [ 1 , 2 ]

Foundation Luis Vuitton – Paris, France

Posted in Built by Annabel Cook on July 15, 2015

luis vuitton1 luis vuitton2

1 , 2 ]

Building: Foundation Luis Vuitton
Location: Paris France
Completion: 2014
Architect: Gehry Partners, Frank Gehry
General Contractor: VINCI Construction
MEP  and Civil Engineer: Setec Batiment

AE Interests: Gives the impression of movement with curved glass panels, no concrete pillars, steel girders protrude out at variety of angles, panels for the white blocks are white fiber reinforced concrete, glass saves energy with a silk filter printed on the panels (reflects half of the exterior light) supported by wooden beams, fastenings allow for movement, deep foundation accounts for overhangs and imbalances to wind

Santa Caterina Market renovation – Barcelona, Spain

Posted in Built by Annabel Cook on July 6, 2015

catarina  caterina

[1,2]

Building: Santa Caterina Market renovation
Location: Barcelona, Spain
Completion: 2005
Architect: Enric Miralles / Benedetta Tagliabie EMBT
General Structural Engineer: Robert Brufau
Roof Engineer: Jose María Velaso
Housing Engineer: Miquel Llorens
Ceramic Manufacturer: Toni Cumella

AE Interests: Eccentric new roof flying over the walls of a neoclassical market, irregular arches with interior wood cladding and center bracing. It was an attempt by the city authorities to control complexity in the area’s development. The architects consolidated what had been the broken, irregular path of the unrealized avenue, in contrast to the urban-scale order that would have been imposed over the winding maze of medieval streets.

Limoges Concert Hall – Limoges, France

Posted in Built by Annabel Cook on June 27, 2015

limoges 4   limoges3 limoges france

[1,2,3]

Building: Limoges Concert Hall
Location: Limoges, France
Completion: 2007
Architect: Bernard Tschumi Architects
Local Architect: Atelier 4
Structural Engineers: Technip TPS
Acoustics: CIAL

AE Interests: Double envelope: an outer skin made of wood arcs and translucent rigid poly-carbonate sheets and an inner acoustical envelope of locally grown Douglas fir, meant to filter light, heat and acoustics. A good example of energy conservation and use of renewable materials.

ICD/ITKE Research Pavilion 2012 – Stuttgart, Germany

Posted in Built by Annabel Cook on June 16, 2015

     6.162

[1, 2, 3]

Building: ICD/ITKE Research Pavilion
Location: Stuttgart, Germany
Completion: 2012
Architects:  University of Stuttgart, Faculty of Architecture and Urban Planning
Structural Engineers: Institute for Computational Design (ICD) and the Institute of Building Structures and Structural Design (ITKE) at the University of Stuttgart

AE Interests: Double curved shape pavilion, entirely robotically fabricated from carbon and glass fiber composites, directional stress distributions with unidirectional layer structure,  anisotropic fiber for directed load transfer, fiber optic sensors continuously monitor the stress and strain variations

Glacier Skywalk – Jasper, Canada

Posted in Built by Annabel Cook on June 11, 2015

   glacier skywalk2

[1, 2]

Building: Glacier Skywalk
Location: Jasper, Canada
Completion: 2014
Architects: Sturgess Architecture
Structural Engineer: Read Jones Christoffersen Consulting Engineers
Construction: PCL Construction Manegement, Inc

AE Interests: Cantilevered corten steel and glass structure, parabola shaped, trapezoidal box girders supported at the cliff, then extended curved end is cable supported

Ribbon Chapel – Hiroshima, Japan

Posted in Built by Annabel Cook on June 11, 2015

   

[12]

Building: Ribbon Chapel
Location: Hiroshima, Japan
Completion: 2013
Architects: NAP Architects
Structural Engineers: Ove Arup & Partners Ltd, S structure

AE Interests: Free standing chapel, use of titanium zinc alloy, a three-dimensional brace and hoop effect for resisting horizontal and outward forces, pendulum-type base isolation, overhang-type tuned mass damper (TMD), dot point glazing (DPG) arms

Sejong Art Center – Seoul, South Korea

Posted in Built by Annabel Cook on June 9, 2015

arts theator sejong art

[1, 2]

Building: Sejong Art Center (SAC)
Location: Naseong-dong, Seoul, South Korea
Completion: March 2013
Architects: DMP (Designcamp Moonpark) Partners
Structural Engineer: I’ST
Mechanical Engineer: HIMEC
Civil Engineer: Daekyo E&C
Electrical : Jung Woo Eng.
Acoustics: ad&c

AE Interests: Multi-theater center, best acoustic quality using SAR (Source Selective Absorbtion & Reflection), long span roof for open entrance

Sejong Center for Performing Arts – Sejong, South Korea

Posted in Built by Annabel Cook on June 9, 2015

sejong sejong2

[1, 2]

Building: Sejong Center for Performing Arts
Location: Sejong, South Korea
Completion: 2013
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Performing Arts Center, complex interior theater, intricate pattern of louvers, curved roofs.

River Culture Pavilion (ARC) – Daegu, South Korea

Posted in Built by Annabel Cook on June 2, 2015

Screen shot 2015-06-01 at 11.54.58 PM  arc  Screen shot 2015-06-01 at 11.59.29 PM
[1,2, 3]

Building: River Culture Pavilion (ARC)
Location: Daegu, South Korea
Completion: June 2012
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Multimedia theater pavillion, complex form integrated with landscape, ETFE plastic pillows, man-made peninsula, part of World Expo 2012.

Edited 6/2015gb

Sydney Modern – Sydney, Australia

Posted in Built by Gregory Brooks on June 1, 2015

Screen shot 2015-06-01 at 11.47.42 PM  Screen shot 2015-06-01 at 11.48.03 PM
[1, 2]   +  site

Building:  Sydney Modern Project (competition winner)
Location:  Sydney, Australia
Architect:  SANAA

AEInterest:  International competition winner, Lightweight pavilions connecting museum to landscape and city.
“includes the new building by SANAA, a revitalization of the original, 19th century building, and a new plaza linked to the Royal Botanic Gardens.”

Article: 1

Surrey City Centre Library – Surrey, British Columbia, Canada

Posted in Built by Annabel Cook on May 16, 2015

centre library    

12

Building: Surrey City Centre Library
Location: Surrey, British Columbia
Completion: 2011
Architect: Bing Thom Architects
Structural Engineer: Fast + Epp
Civil Engineer: CitiWest Consulting Ltd.
Construction: Stuart Olson Dominion
Mechanical Engineer: AME Consulting Group
Electrical Engineer: Applied Engineering Solutions
Geotechnical Engineer: Trow Consulting Engineers

AE Interests: sloped walls, complex interior space, concrete frame, flexible plan for future expansion

Articles: 1, 2

Stadskantoor – Rotterdam, Netherlands

Posted in Built by Yee Sang Wong on May 11, 2015

Screen Shot 2015-05-10 at 8.21.26 PMScreen Shot 2015-05-10 at 8.20.50 PM  Screen Shot 2015-05-10 at 8.22.07 PM

Image credits: 1, 2, 3
Building: Stadskantoor
Location: Meent 119, 3011 JH Rotterdam, The Netherlands
Architect: OMA
Structural Engineer: Pieters Bouwtechniek Delft
Construction: Guangzhou Construction Engineering Supervision
Competition Engineering, Structural And Installations: ABT: Rob Nijsse, Gyuszi Florian, Niek Kunnen, Harry Pasterkamp, Jeroen ter Haar
Under Construction (estimated completion date: mid-2015)

AE Interests: modular structural system and programmatic versatility, mixed-use (offices and apartments), open space on street level, the most sustainable building in the Netherlands, translucent insulation, stacked units

,,,,

Edited May2015 by YW.

Guangzhou Opera House – Guangzhou, Guangdong Province, China

Posted in Built by Yee Sang Wong on May 11, 2015

Screen Shot 2015-05-10 at 6.46.57 PMScreen Shot 2015-05-10 at 6.46.39 PMScreen Shot 2015-05-10 at 6.48.26 PM

Image credits: 1, 2, 3
Building: Guangzhou Opera House
Client: Guangzhou Municipal Government
Location: Guagnzhou Opera House, Tianhe, Guangzhou, Guangdong, China
Architect: Zaha Hadid Architects
Facade Engineer: KGE Engineering
Structural Engineer: SHTK 
Acoustical Engineer: Marshall Day Acoustics
Construction: Guangzhou Construction Engineering Supervision
Completed 2010

AE Interests: architectural language of fluidity and seamlessness, intricate secondary steel structure, 1800-seat auditorium, latest acoustic technology.

Video of the Guardian describing Zaha Hadid’s design process on Guangzhou Opera House.

,,,,

Edited May2015 by YW.

Intesa Sanpaolo Office Building – Torino, Italy

Posted in Built by Nathan L Sanchez on May 8, 2015

lusas sanpaoloturintower
[1,2,3]

Building: Intesa Sanpaolo Office Building
Location: Torino, Turin, Italy
Completion: 2014
Architect: Renzo Piano Building Workshop
Engineers: Expedition Engineering/ Studio Ossola

AE Interest: bioclimatic building, naturally ventilated, southern facade covered by photovoltaic panels, 6 mega-columns support two glass planes

Asia Society Hong Kong Center – Admiralty, Hong Kong, China

Posted in Built by Sydney Valentine Moore on April 26, 2015

Asia Society_02 Asia Society
[1, 2]

Building: Asia Society Hong Kong Center
Location: Admiralty, Hong Kong, China
Completion: 2012
Architect: Tod Williams Billie Tsien Architects + Partners
Structural Engineer: Arup

AE Interests: Steeply sloped site, concrete bridge connecting buildings on the site, y-shaped structural supports, jungle and city scape

St. Voile Chapel – Niigata City, Japan

Posted in Built by Sydney Valentine Moore on April 24, 2015

St. Voile Chapel   St. Voile Chapel_04
[12]

Building: St. Voile Chapel
Location: Niigata City, Japan
Completion: 2014
Architect: Kasahara Design Work
Structural Engineer: OGA

AE Interests: Natural slate, single construction method used for walls and roof, arced pipes
Design Concept: Wedding veil

LeFrak Center at Lakeside – Prospect Park, Brooklyn, New York, U.S.

Posted in Built by Sydney Valentine Moore on April 23, 2015

LeFrak  LeFrak_02
[1, 2]

Building: LeFrak Center at Lakeside
Location: Prospect Park, Brooklyn, New York, U.S.
Completion: 2013
Architect: Tod Williams Billie Tsien Architects + Partners
Structural Engineer: Robert Silman Associates
Civil Engineer: Stantec
Construction: Sciame Construction

AE Interests: LEED Gold, restored landscape, built into the topography, green roofs, irregularly placed columns

Articles: 1

The Blue Planet – Copenhagen, Denmark

Posted in Built by Sydney Valentine Moore on April 22, 2015

Blue Planet  Blue Planet_02
[1, 2]

Building: The Blue Planet
Location: Copenhagen, Denmark
Completion: 2013
Architect: 3XN
Civil Engineer: Moe & Brodsgaard
Structural Engineers: MT Hojgaard, Hoffmann A/S, Kai Andersen A/S, E. Pihl & Son A/S

AE Interests: Whirlpole form binding together land and sea, diamond shape aluminum plate facade, organic forms, advance concrete/steel structure (54 unique steel frames), sea water used for cooling system for aquariums and climate system for public areas

Articles: 1

Mercat Encants – Gran Via-Pl de les Glòries, Barcelona, Spain

Posted in Built by Sydney Valentine Moore on April 22, 2015

Mercat Enchant  Mercat Enchant_02
[1, 2]

Building: Mercat Encants
Location: Gran Via-Pl de les Glòries, Barcelona, Spain
Completion: 2013
Architect: b720 Fermín Vázquez Arquitectos
Structural Engineer: BOMA
ME Engineer: JG

AE Interests: Suspended canopy, intertwining floors connected by ramps, stainless steal golden mirrors, post-tension sandwich slabs

Design Intentions: Preserve the market’s soul, dignify its role in Barcelona’s civic life, make it a large public space as opposed to a “commercial building”, provide it with a strong visual identity, contribute to formalising the future Glories Square

Krishna P. Singh Center for Nanotechnology – University of Pennsylvania, Philadelphia, Pennsylvania, U.S.

Posted in Built by Sydney Valentine Moore on April 20, 2015

Singh Center Singh Center_02
[1, 2]

Building: Krishna P. Singh Center for Nanotechnology
Location: University of Pennsylvania, Philadelphia, Pennsylvania, U.S.
Completion: 2013
Architects: Weiss/Manfredi
Structural Engineer: Severud Associates
Civil Engineer: Stantec
Leed/Sustainability Consultant : Viridian Energy & Environmental, LLC
Curtain Wall Consultant: R.A. Heintges & Associates

AE Interests: 68 foot cantilever, lateral connecting trusses, pleated metal skin, amber colored ultraviolet light filtering glass

More Photos: 1

Diana Center at Barnard College – Manhattan, NY, U.S.

Posted in Built by Sydney Valentine Moore on April 15, 2015

Diana Center at Barnard  Diana Center at Barnard_02
[1, 2]

Building: Diana Center at Barnard College
Location: Manhattan, NY, U.S.
Completed: 2010
Architects: Weiss/Manfredi
Structural Engineer: Severud Engineers
Civil Engineer: Langan
Curtain Wall Consultant: R.A. Heintges Architects Consultants

AE Interests: Etched glass changes colors with different lighting (changes red, bronze and orange), curtain wall, green roof, recycled materials

Articles: 1
Videos: 1
More Photos: 1
—-

Cornell University Technology Campus- Roosevelt Island, NY, U.S.

Posted in Built by Sydney Valentine Moore on April 15, 2015

 Roosevelt Island_01 First Academic Building  Cornell NYC_01 Residential Tower
[1, 2, 3, 4]
Buildings: First Academic Building by Morphosis (2), Co-Location Building by Weiss/Manfredi (3), Residential Tower by Handel Architects (4)
Location: Roosevelt Island, NYC, NY, U.S.
Completed: First phase of construction expected 2017, Campus expected 2038
Campus Master Plan: Skidmore, Owings & Merrill, James Corner Field Operations
Mechanical Engineer: Buro Happold (First Academic Building)

AE Interests: First Academic Building- solar cells on roof, Co-Location Building- crystalline geometries, landscape terraces, rooftop photovoltaic canopy, Residential Tower- design inspired by diagonal lines from the site

Videos: 1

Sylvan Theatre – Washington D.C., U.S.

Posted in Built by Sydney Valentine Moore on April 10, 2015

Sylvan Theatre_01     Sylvan Theatre_03  Sylvan Theatre_02
[1, 2, 3]

Building: Sylvan Theater
Location: Washington D.C., U.S.
Architects: Weiss/Manfredi, Olin
Structural/Civil Engineer: Magnusson Klemencic Associates
Mechanical Engineer: Jaros, Baum & Bolles
Geotechnical Engineer: Geoconcepts Engineering
Acoustics: Threshold Acoustics

Design Concepts: Turn audience towards the Washington Monument, lift land to have all scales of shows, respect historic site, hide tour buses from view

AE Interests: Landscape, amphitheater, green roof, excavation

Mexico City International Airport – Mexico City, Mexico

Posted in Built by Sydney Valentine Moore on April 9, 2015

Mx City Int'l Airport   Mx City Int'l Airport_Interior
[1, 2]

Building: Mexico City International Airport
Location: Mexico City, Mexico
Architects: Foster + Partners, FR-EE (Fernando Romero EnterprisE)
Master Plan Design: Arup
Structural Engineering: Arup

M+E Engineer: Foster + Partners
2018 note: Under construction

AE Interests: Maximum span of 170 meters, single light-weight grid shell roof structure, prefabricated, sub floor services, natural ventilation, roof harvests solar energy and captures rain water.

Articles: 1
Videos: 1,
Fly Thru Video here – look for this image toward bottom of page:
Screen Shot 2018-09-26 at 5.41.38 PM

.

.

Capital Cairo Project – Cairo, Egypt

Posted in Built by Aleksa Diaz on April 7, 2015

Cairo-by-SOM_dezeen_784_0  Cairo-by-SOM_dezeen_784_3  Cairo-by-SOM_dezeen_468_4

[1, 2, 3]

Building/Project: Capital Cairo Project
Location: Cairo, Egypt.
Completed: Proposal submitted
Architects: Skidmore, Owings & Merril (SOM)
Engineers: SOM

AEInterest:  Design of cities, masterplan, Cairo population projected to double by several million in next 35 years, passive cooling strategies, housing.

Articles: 1, 2

Ring of Celestial Bliss – Hsinchu, Taiwan

Posted in Built by Aleksa Diaz on April 7, 2015

Ring-Celestial-Bliss-by-JJ-Pan-Partners-05  RCB02_materials  green_steel_01
[1, 2, 3]

Building: Ring of Celestial Bliss
Location: Hsinchu,Taiwan
Architects: J.J. Pan & Partners
Engineers: Li Jin Engineering Co. Ltd., Envision Engineering

AE Interest: Recyclable steel structure, Bamboo facade, permeable bamboo flooring, recycled PET plastic screen. Structure was recycled.

Articles: 1, 2

Waller Creek Redesign – Austin, TX, U.S.

Posted in Built by Aleksa Diaz on March 31, 2015

1351111494-the-poppy-in-the-confluence-mvva-team-400x500 1351111506-the-lattice-mvva-team-400x500 1351117013-screen-shot-2012-10-24-at-31618-pm-528x174

Building: Waller Creek Lattice, The Poppy
Location: Austin, TX, U.S.
Completed: Construction underway since 2014
Landscape architects: Architects: Thomas Phifer and Partners

AE Interest: Chain of parks connected by 6 trail bridges, Bridge pier that treats storm water, island park, floating pontoon bridge, concrete tunnel vane doubles as support for lawn that floats out unto the water. The poppy- lightweight pavilion.

Article: 1, 2

Femme de Vals Tower – Vals, Switzerland

Posted in Built by Gregory Brooks on March 31, 2015

ValsTower  ValsPlan
[1,2]
Proposed Design (competition winner): Femme de Vals Tower
Location:  Vals, Switzerland
Architect:  Morphosis
Developer: Remo Stoffel
Competition: Feb 2015
Status:  to be determined.

AEInterest:  Luxury hotel, 82-story, 1,250 tall tower, appx. 100′ x 64′ in plan > 1:12.5 to 1:20 slenderness ratio, inspired by Giacometti’s Femme de Venise sculpture, controversial design for small town of Vals.

Article: 1

Shenzhen Stock Exchange – Shenzhen, China

Posted in Built by Madhumitha Venkataraman on March 10, 2015

elev  shenSTR  stockexchange3  shezhen
[1, 2, 3, 4]

Building: Shenzhen Stock Exchange
Location: Shenzhen, China
Completed: 2013
Architect: OMA
Structural Engineer: Arup
MEP Engineer: Arup
Façade Engineering Design: Graham Dodd, London Office
Level Acoustic: DHV Building and Industry
Client: Shenzhen Stock Exchange

AE Interests: skyscraper(49 floors), 3d megatruss cantilevered podium, roof garden.

Article: 1, 2

—-

Singapore Sky Greens – Kallang, Singapore

Posted in Built by Aleksa Diaz on March 10, 2015

pixkranji  skygreens-vertical-farm-22
Photos: 1, 2

Building: Sky Greens
Location: Kallang, Singapore
Completion: 2012
Engineers: DJ Engineering, Sky Greens

AE Interest: 120 individual aluminum A-frame towers that rotate vegetables via a hydraulic water pulley system. Each tower is 20 square feet, and 30 ft tall.

Article
….

San Francisco Museum of Modern Art – San Francisco, California, U.S.

Posted in Built by Aleksa Diaz on March 10, 2015

image032panel_installation_Felix_Weber_630x737timthumb

Photos: [12, 3]

Building: San Francisco Museum of Art
Location:San Francisco, California, U.S.
To be completed by: 2016
Facade Engineers: Leonie van Ginkel, Felix Weber, and Markus Schulte
MEP Engineer: Arup
Architect: Snøhetta

AE Interests: Facade constructed out of 700 individual glass-fiber-reinforced polymer panels. Sand-gel mixture coats each panel for anti-flammability & shimmer exterior.

Articles: [1]

Google Headquarters – Mountain View, California, U.S.

Posted in Built by Aleksa Diaz on March 10, 2015

google-mountain-view-renders-15  bjarke-ingels-group-BIG-thomas-heatherwick-google-headquarters-mountain-view-designboom-05  g1

Photos: 1,2,3
Building: Google Headquarters
Location: Mountain View, California, U.S.
Estimated Completion: 2020
Architect: Bjarke Ingels Group and Heatherwick Studio

AE Interests: 3.4 million square-feet
Lightweight multi-story movable block structures. Large translucent canopies over block structures; let in air and daylight.

Articles: [1][2]

A Path in the Forest – Tallinn, Estonia

Posted in Built by Madhumitha Venkataraman on March 6, 2015

forest1   forest2
[1, 2]

Building: A Path in the Forest
Location: Kadriorg Park, Tallinn, Estonia
Completed: 2011
Architects: Transsolar & Tetsuo Kondo Architects
Structural Engineer: Mutsuro Sasaki, Yoshiyuki Hiraiwa / SAPS (Sasaki and Partners)

AE Interests: installation, trail, delicate steel structure, connected with forest environment, curvilinear form

Article
….

Merchant Square Footbridge – Paddington, London, U.K.

Posted in Built by Madhumitha Venkataraman on March 6, 2015

bridge1   bridge2   bridge3
[1, 2, 3]

Building: Merchant Square Footbridge
Location: Paddington, London, U.K.
Completed: 2014
Architect: Knight Architects
Structural Engineer: AKT II
Mechanical, Hydraulic and Electrical Engineer: Eadon Consulting
Lighting Design: Studio Fractal
Landscape Architect: Townshend Landscape Design
Contractor: Mace

AE Interests: drawbridge/footbridge, cantilevered structure, hydraulic jacks
….

^

 

.

Holmenkollen Ski Jump – Oslo, Norway

Posted in Built by Madhumitha Venkataraman on March 6, 2015

skijump1   skijump2    skijump3
[1, 2, 3]

Building: Holmenkollen Ski Jump
Location: Oslo, Norway
Completed: 2011
Architect: JDS Architects
Landscape Architect: Grindaker
Consultants: Norconsult , Metallplan
Steel Contractor: Lecor Steel AB
Client: Oslo Municipality

AE Interests: Norwegian Steel Construction Prize 2011, modern ski jump, wind protection, ice track machine, steel ski jump

Article
—-

Tucheng Sports Center – New Taipei City, Taiwan

Posted in Built by Madhumitha Venkataraman on March 6, 2015

sportscenter3   sportscenter2   sportscenter1   sportscenter4
[1, 2, 3, 4]

Building: Tucheng Sports Center
Location: New Taipei City, Taiwan
Completed: 2014
Architect: Q-Lab
Design Director: Borden Tsend
Project Manager: Tunghan Wu
Project Designers: Zizi Huang, Foli Yeh, Albert Chiu, Kunghuei Wang
Construction Company: Best Giving

AE Interests: Cantilever, Walkway, Geometric Structure, window/wall system, sports center
—-

Article