Castle House Tower – London, U.K.

Posted in Under Construction by Gregory Brooks on January 31, 2010


Building: Castle House
Location: London, U.K.
Status: in progress – wind turbines being fabricated October 2009
Architect: Hamiltons Associates
Engineer: WSP Group

AE Interests: 3 large wind-turbines at top of tower, alternative energy, sustainability.

^

The NS Raghaven Center for Entrepreneurial Learning – Bangalore, Karnataka State, India

Posted in Built by Kevin Carbonnier on January 28, 2010

Building: The NS Raghaven Center for Entrepreneurial Learning
Location: Bangalore, Karnataka State, India
Completed: 2002
Architect: Chandavarkar & Thacker

AE Interests: Local material use, Habitable roof landscape

House for a Film Maker – Alibag, Mahatashtra, India

Posted in Built by Kevin Carbonnier on January 28, 2010

Building: House for a Film Maker
Location: Alibag, Mahatashtra, India
Completed: 2001
Architect: Rahul J Mahrotra

AE Interests: Convex metal-clad roof structure, Angled façade

A5 Residence – Lalmatia, Dhaka, Bangladesh

Posted in Built by Kevin Carbonnier on January 28, 2010

Building: A5 Residence
Location: Lalmatia, Dhaka, Bangladesh
Completed: 2002
Architect: URBANA

AE Interests: Large openings allow natural ventilation,  Use of recycled building materials

Commune by the Great Wall – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Project: Commune by the Great Wall

Location: Badaling, Yangqin, China (Outskirts of Beijing)

Buildings & Architects:

1) Suitcase House by Gary Chang

2) Furniture House by Shigeru Ban

3) “See” and “Seen” House by Cui Kai

4) Distorted Courtyard By Rocco Yim

5) Airport by Chien Hsueh-Yi

6) Cantilever House by Antonio Ochoa

7) Bamboo Wall by Kengo Kuma

8) Shared House by Kanika R’kul

9) The Twins by Kay Ngee Tan

10) Forest House by Nobuaki Furuya

11) Split House by Yung Ho Chang

12) Club House by Seung H-Sang

Furniture House (Bamboo) – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Bamboo Furniture House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Shigeru Ban
Completed: 2002

AE Interests: Bamboo Structure, Local Materials, simple design

Suitcase House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Suitcase House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Gary Chang
Completed: 2002

AE Interests: Cantilever structure, Reconfigurable spaces

“See” and “Seen” House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: “See” and “Seen” House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Cui Kai
Completed: 2002

AE Interests: Steel structure, Reinforced Concrete structure, Aluminum Exterior Finish, Rearrangeable Rooms

Distorted Courtyard House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Distorted Courtyard House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Rocco Yim
Completed: 2002

AE Interests: curtain wall, simple design, bamboo solar shading

Airport House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Airport House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Chien Hsueh-Yi
Completed: 2002

AE Interests: imitates natural elements, blends into nature, unobtrusive

Cantilever House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Cantilever House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Antonio Ochoa
Completed: 2002

AE Interests: Cantilever structure, simple geometry, Concrete structure, Brick Masonry, roof garden

Bamboo Wall House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Bamboo Wall House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Kengo Kuma
Completed: 2002

AE Interests: Bamboo structure, Glass structure, incorporates natural elements

Shared House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Shared House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Kanika R’kul
Completed: 2002

AE Interests: Curtain wall, minimal environmental impact

The Twins House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: The Twins House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Kay Ngee Tan
Completed: 2002

AE Interests: Cantilever roof, Masonry, imitates natural elements

Forest House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Forest House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Nobuaki Furuya
Completed: 2002

AE Interests: Curtain wall, Steel structure, incorporates natural elements

Split House – Beijing Area, China

Posted in Built by Stacy Chu on January 28, 2010

Building: Split House (Commune by the Great Wall)
Location: Badaling, Yanqing, China
Architect: Yung Ho Chang
Completed: 2002

AE Interests: Incorporates natural elements, glass floors, convertible design, wood frame, minimum environmental impact, ecological

Protective Construction for Hamar Cathedral Ruins – Hamar, Norway

Posted in Built by Maggie Lawson on January 28, 2010

Building: Protective Construction for Hamar Cathedral Ruins
Location: Hamar, Norway
Architect: Lund & Slaatto Arkitekter
Completion: 1998
Area: 2,640 sq. meters
Cost: $8,000,000

AE Interests: Constructed over 950 yr. old cathedral ruins, glass and steel skin combats condensation and low temperatures

3rd District Coastal Authority Headquarters – Norvevika, Ålesund, Norway

Posted in Built by Maggie Lawson on January 28, 2010

Building: 3rd District Coastal Authority Headquarters
Location: Norvevika, Ålesund, Norway
Architect: Slyngstad Aamlid Arkitekter
Completion: 2000
Area: 1,079 sq. meters
Cost: $170,000

AE Interests: hung slate wall to shield noise, curved timber roof, secondary structure of struts and tensioned cross-bracing to support roof

Sami Parliament Building – Karasjok, Norway

Posted in Built by Maggie Lawson on January 28, 2010

Building: Sami Parliament Building
Location: Karasjok, Norway
Architect: Stein Halvorsen & Christian Sundby
Completion: 2000
Cost: $25,000,000

AE Interests: conical form, concrete modulated timer shade from low angle sun

Governor’s Headquarters – Svalbard, Norway

Posted in Built by Maggie Lawson on January 28, 2010

Building: Governor’s Headquarters
Locations: Svalbard, Norway
Architect: Jarmund/Vigsnæs AS Arkitekter
MNAL
Completion: 1998
Area: 1,800 sq. meters
Cost: $3,897,000

AE Interests: Cast place concrete, insulated against harsh climate, louvres on triple glazed windows reflect light onto snow and back into building to respond to periods of 24 hr. sunlight or darkness, built on existing concrete foundation, tilted walls

Ecoms House – Tosu City, Japan

Posted in Built by Marcus Allen on January 28, 2010

Building: Ecoms House
Location: Tosu City, Saga Prefecture, Japan
Completed: 2004
Architect: Riken Yamamoto
Structural Engineer: Iijima Structural Design Office

AE Interests: Made completely from prefabricated aluminum. Pieces are bolted together on site quickly and easily, making the building light and cost efficient.

Service Centre in Nautholsvik – Reykjavik, Iceland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Service Centre in Nautholsvik
Location: Reykjavik, Iceland
Architect: Arkibullan
Completion: 2001
Area: 528 sq. meters
Cost: $1,341,000

AE Interests: built on sand, timber cladding, geothermal water heats surrounding waters, L-shaped and dug into hillside to protect from harsh elements
—-ea

Su Baek Dang – Nam Yang Ju, Kyoung Gi, South Korea

Posted in Built by Julian Park on January 28, 2010

Building:  Su Baek Dang
Location: Nam Yang Ju, Kyoung Gi, South Korea
Completed:1998
Architect: Hyo-Sang Seung

AE interests: simple geometry, efficient use of space,  steel framed pavilion

Riverwalk Kitakyushu – Kitakyushu, Japan

Posted in Built by Marcus Allen on January 28, 2010

Building: The Riverwalk Kitakyushu
Location: Kitakyushu, Japan
Completed: April 2003
Architect: The Jerde Partnership

AE Interests: Massive concrete geometric figures.

Oita Stadium – Oita Japan

Posted in Built by Marcus Allen on January 28, 2010

Building: Oita Stadium
Location: Oita, Oita, Japan
Completed: 2001
Architect: Kisho Kurokawa
Structural Engineer: KT Group

AE Interests: Steel + reinforced concrete. Retractable roof and seating. Roof is made of a teflon membrane that allows 25% light permeability, making artificial light unnecessary during the day.

Car Park, Garden & Public Space at Kringlan Shopping Mall – Reykjavik, Iceland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Car Park, Garden & Public Space at Kringlan Shopping Mall
Location: Reykjavik, Iceland
Architect: Studio Granda
Structural Engineer: Verfrædistofa Sigurdur Thoroddsen
Landscape Architect: Landslag
Completion: 1999
Area: 11,506 sq. meters
Cost: $5,742,000

AE Interests: parking area, variety of materials
—-ea

Art Museum – Reykjavik, Iceland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Art Museum
Location: Reykjavik, Iceland
Architect: Studio Granda
Structural Engineers : Línuhönnun
Electrical Engineers : Rafteikning
Environmental Engineers : Vídsjá / Lagnataeki
Acoustic Consultant: Steindór Gudmundsson
Completion: 2000
Area: 3,040 sq. meters
Cost: $6,040,000

AE Interests: canopy to funnel light, built onto old warehouse
—-ea

Bifrost Business School Extension – Bifrost, Borgarforour Iceland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Bifrost Business School Extension
Location: Bifrost, Borgarforour Iceland
Architect: Studio Granda
Completion: 2002
Area: 1,324 sq. meters
Cost: $2,700,000

AE Interests: corrugated copper facade, built on hardened lava flow, low-angle sunlight
—-ea

Katuaq Culture Centre – Nuuk, Greenland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Katuaq Culture Centre
Location: Nuuk, Greenland
Architect: Schmidt, Hammer & Lassen
Completion: 1992
Area: 4,780 sq. meters
Cost: $13,033,000

AE Interests: arctic climate, ‘floating’ wooden skin, daylighting via slits in ceilings, acoustical engineering in auditorium

Nature Institute – Nuuk, Greenland

Posted in Built by Maggie Lawson on January 28, 2010

Building: Nature Institute
Location: Nuuk, Greenland
Architect: KHRAS Arkitekter
Completion: 1999
Area: 2,000 sq. meters
Cost: $6,000,000

AE Interests: Positioned parallel to strong winds, natural ventilation, arctic climate

Adonis Golf Club Clubhouse – Yangsan, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Adonis Golf Club Clubhouse
Location: Yangsan, South Korea
Completed: 1999
Architect: John Friedman Alice Kimm Architects

AE interests: large, glass facade allows lighting by natural sunlight; tilted roof;

Dong Heon – Nam Yang Ju, Kyoung Gi, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Dong Heon
Location: Nam Yang Ju, Kyoung Gi, South Korea
Completed: 2000
Architect: Hyo-Sang Seung

AE interests: stilted in mid-air, harmonizes with surrounding environment

Dong Kwang Methodist Church – Iksan, Jeon Ra Buk Do, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Dong Kwang Methodist Church
Location: Iksan, South Korea
Completed:2002
Architect: Hyo-Sang Seung

AE interests: inclined roof, sloping sided tower

Nanjing Greenland Financial Complex – Nanjing, China

Posted in Built by Sophia Kim on January 28, 2010

Images: 1, 2, 3

Building: Nanjing Greenland Financial Complex (Zifeng Tower)
Location: Gulou Square, Nanjing, China
Completed: 2009
Architect & Engineer: Skidmore, Owings, and Merrill

AE Interest: Stepping of building separates spaces of mixed use of building, triangular form, angled glass plane facade, central super core, structural steel, reinforced concrete, belt truss system, resistance to seismic and wind loads

Kwangju Worldcup Stadium – Pungam-dong, Kwangju, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Kwangju Worldcup Stadium
Location: Pungam-dong, Kwangju, South Korea
Completed: 2001
Architect: Space Group

AE interests: gently curved roof spanning entire stadium covers 60% of spectator seats, equipped with a press center and multiple facilities for players and spectators, seating capacity: 42,880

Building: Adonis Golf Club Clubhouse
Location: Yangsan, South Korea
Completed: 1999
Architect: John Friedman Alice Kimm Architects

AE interests: large, glass façade, tilted roof

Dongbu Financial Centre – Seoul, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Dongbu Financial Centre
Location: Seoul, South Korea
Completed: 2002
Architect: Kohn Pedersen Fox Associates

AE interests: irregular building structure

¬Transportation Centre, Incheon International Airport – Incheon, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Transportation Centre, Incheon International Airport
Location: Incheon, South Korea
Completed:2002
Architect: Terry Farrell & Partners
Concept Sustainable Design and Building Services Engineering: Battle McCarthy Limited

AE interests: aluminum tile envelope; arched roofing; sleek, curved surfaces; large glass facades allow natural sunlight to flow in;

OPUS Concert Hall Building – Seoul, South Korea

Posted in Built by Julian Park on January 28, 2010

Building:  OPUS Concert Hall Building
Location: Seoul, South Korea
Completed: 1998
Architect: Hak Sik Son

AE interests:  insulated from external street noise; both acoustical and visual considerations; complex envelope using reinforced concrete frame, exposed concrete, corrugated metal, and glass facades

¬Dongbu Church – Seoul, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Dongbu Church
Location: Seoul, South Korea
Completed:  2001
Architect: Jae Yong Lim

AE interests: built on a rocky, uneven site; steep, floating roof

Welcomm City – Seoul, South Korea

Posted in Built by Julian Park on January 28, 2010

Building: Welcomm City
Location: Seoul, South Korea
Completed: 2000
Architect: Hyo Sang Seung

AE interests: first rusty cor-ten steel façade built in South Korea, four “little houses” that stand on a concrete base

1 Dubai – Dubai, United Arab Emirates

Posted in Under Construction by Sophia Kim on January 28, 2010

Building: 1 Dubai
Location: Jumeirah Garden City, Dubai, United Arab Emirates
Status: project cancelled in 2009
Architect: Adrian Smith + Gorden Gill Architecture & Meraas

AE Interest: three skyscraper towers, 3280 ft. tall, tripedal base called a saddle, extra support from sky bridges

House Into – Espoo, Finland

Posted in Built by David Morales on January 28, 2010

Building: House Into
Location: Espoo, Finland
Completion Date: 1998
Architect: Jyrki Tasa

AE Interests: it is dominated by an undulating eave, a triangular terrace that splits the building
and tall, diagonal pillars, structure of the house consists of a steel frame with attached timber studs
and beams, allows natural ventilation from the residing sea

Cafe Carbon – Helsinki, Finland

Posted in Built by David Morales on January 28, 2010

Building: Cafe Carbon
Location: Helsinki, Finland
Completion Date: 2000
Architect: Niko Sirola

AE Interests: formed by a glulam frame, assembled on site from industrially prefabricated
Safe Wood glulam units, outer surface of the cafe has been carbonised by burning and creosoted
to make them weather resistant

Taiwan Centers for Disease Control Complex – Taiwan

Posted in Proposed Design by Sophia Kim on January 28, 2010

Building: Taiwan Centers for Disease Control Complex
Location: Taiwan
Architect: Studio Nicoletti Associati
Structures + Facades: RFR, Mathias Kutterer and Henry Bardsley
Project Manager: Luca Maugeri

AE Interest: natural shell shape, outer skin pattern is designed of interlocking geometric incisions similar to the shape of the DNA of the bacteria being studied at facility, Gold LEED rating, under EEWH certifications, steel framing, open court yard within the egg shape


Sibelius Hall – Lahti, Finland

Posted in Built by David Morales on January 28, 2010

Building: Sibelius Hall
Location: Lahti, Finland
Completion Date: 2000
Architect: Artto Palo Rossi Tikka Architects

AE Interests: incorporates three-piece adjustable acoustic canopy  to allow for great acoustic
variability, appears to be a wooden vessel encased within a glass vitrine

Korkeassari Lookout Tower – Helsinki, Finland

Posted in Built by David Morales on January 28, 2010

Building: Korkeassari Lookout Tower
Location: Helsinki, Finland
Completion Date: 2002
Architect: Ville hara, Hut Wood Studio Workshop
Structural Engineer: DI Hannu Hirsi, DI Lauri salokangas/Nuvo Engineering

AE Interests: follows the existing low stone wall and skirts around a small birch grove,
the shell structures hasover 600 bolted joints holding the 72 long battens together

Lume Media Centre – Helsinki, Finland

Posted in Built by David Morales on January 28, 2010

Building: Lume Media Centre
Location: Helsinki, Finland
Completion Date: 2000
Architect: Heikkinen – Komonen Architects
HPAC Engineer: Asplan Oy/Harry Stenvall
Electrical Engineer: Kupari Engineering/Jarmo Elo
Construction Engineer: Finnmap Consulting/Pertti Parssinen

AE Interests: architecture relies on a balanced coordination of matrices between layers
of function, mechanical, and electrical systems, organized hierarchically into square
boulevards, back alleys, and service areas

Vuotalo Cultural Centre – Helsinki, Finland

Posted in Built by David Morales on January 28, 2010

Building: Vuotalo Cultural Centre
Location: Helsinki, Finland
Completion Date: 2000
Architect: Heikkinen – Komonen Architects

AE Interests: all activities of the building are visible through the 2-storey glazed
main facade, the opposite side is covered with stainless steel chain-link conveyor belt
which make it appear like scales of a salmon, has half-circle plan shape with two glass-
covered “canyons” sliced in to permit natural light to enter

Villa Linnanmaki – Somerniemi, Uusimaa, Finland

Posted in Built by David Morales on January 28, 2010

Building: Villa Linnanmaki
Location: Somerniemi, Uusimaa, Finland
Completion Date: 2002
Architect: Huttunen-Lipasti-Pakkanen Architects

AE Interests: located in narrow strip of woodland between fields and a lake,
uses foliage of surrounding birch trees to shade from summer sunlight

Sanoma House – Helsinki, Finland

Posted in Built by David Morales on January 28, 2010

Building: Sanoma House
Location: Helsinki, Finland
Completion Date: 1999
Architect: Antti-Matti Siikala and Jan Söderlund
Structural Engineer: Magnus Malmberg Oy 
Electrical Engineer: Olof Granlund Oy 
Mechanical Engineer: Olof Granlund Oy

AE Interests: has series of glass panels that make the inside transparent, constructed predominantly
with steel to give it a modern look, designed to have easy circulation

Main Building at University of Oulu – Oulu, Finland

Posted in Built by David Morales on January 28, 2010

Building: Main Building at University of Oulu
Location: Oulu, Finland
Completion Date: 2003
Architect: Virta Palaste Leinonen and Antt-Matti Siikala
Structural Engineer: Magnus Malmberg Oy 
Electrical Engineer: Olof Granlund Oy 
Mechanical Engineer: Olof Granlund Oy

AE Interests: easy to maneuver inside the building since main staircase is located
centrally, main target was to make the laboratory itself and together with the offices
convertible

Copenhagen Opera House – Copenhagen, Denmark

Posted in Built by Alec Gagnon on January 28, 2010

Images: 1,2

Building: Copenhagen Opera House
Location: Copenhagen, Denmark
Completed: October 2004
Architect: Henning Larsen Architects
Structural Engineer: Arup
Consultant: Rambøll A/S, Theatre Plan LLP
Client: The A.P. Møller and Chastine Mc-Kinney Møller Foundation

AE Interests: 32m long cantilevered overhang, acoustics, canals excavated on both sides to emphasize structure

Kone Headquarters – Espoo, Finland

Posted in Built by David Morales on January 28, 2010

Building: Kone Headquarters
Location: Espoo, Finland
Completion Date: 2001
Architect: Antti-Matti Siikala
Structural Engineer: Magnus Malmberg Oy 
Electrical Engineer: Olof Granlund Oy 
Mechanical Engineer: Olof Granlund Oy

AE Interests: designed to be a basic block-like shape, it is technically durable
with main building material being glass and steel, has a lift-shaft that acts as
heat valve for offices

Floating Stage – Seoul, South Korea

Posted in Built by Sophia Kim on January 28, 2010

Building: Floating Stage
Location: Han River, Seoul, South Korea
Completed: 2009
Architect: Kyungam Architects Associates

AE Interest: dome structure, barge structure allowing the stage to float, light weight steeled frame, rotating outer walls, LED lights, curved glass facade

Sky City 1000 – Tokyo, Japan

Posted in Proposed Design by Sophia Kim on January 28, 2010

Building: Sky City 1000
Location: Tokyo, Japan
Architect: Takenake Corporation

AE Interests: concrete reinforced with carbon fiber for lighter material, self-contained water system treating sewage and reclaim water, “city built in the air,” each level acts as its own “town”

Bionic Tower – Shanghai, China

Posted in Proposed Design by Sophia Kim on January 28, 2010

Building: Bionic Tower
Location: Shanghai, China
Architect: ECE Arquitecturas
Project Price: Approximately $15 billion

AE Interest: “floating foundation” made up of hundreds of anchors instead of vertical foundation, crisscross trusses, light and hollow steel framing, 92 vertical columns that support as well as transport water, energy, and supplies

Kingdom Centre-Riyadh, Saudi Arabia

Posted in Built by alfredomaldonado2009 on January 28, 2010

Images: 1, 2

Building: Kingdom Centre
Client: Alwaleed bin Talal bin Abdulaziz Al Saud
Location: King Fahad Road, Al-Olaya, Riyadh, Saudi Arabia
Completion: 2002
Design Architect: Ellerbe Becket
Arch/Eng/Interiors/Planning: Ellerbe Becket (consortium partner)
Architecture/Engineering Consultants: Omrania & Associates (consortium partner)
Construction Manager: Saudi Arabian Bechtel Co.
Main Contractor: El-Self Engineering Contractors
Area: 3,300,000 sq ft
Cost: $1,000,000,000
AEInterest: 990 ft in height; 230,000 m3 of concrete; curtain wall facade system totaling 85,000 m2 of glass; 65 m Sky bridge

The National Museum of Saudi Arabia-Riyadh, Saudi Arabia

Posted in Built by alfredomaldonado2009 on January 28, 2010

Building: The National Museum of Saudi Arabia
Client: Kingdom of Saudi Arabia
Location: King Abdul Aziz Historic Center, Riyadh, Saudi Arabia
Completion: 1999
Design Architect: Moriyama and Teshima
Area: 385,638 sq ft
Cost: $99,441,000
AEInterest: In-situ concrete casting with block infill and exterior cladding in sandstone, Adobe; Thick walls with small windows reduce heat gain, use of fountains and pools to create humidity and lower temperatures, louvers at the top of screen walls provide ventilation and cast patterns of sunshine and shade

House No. 3-Shiraz, Iran

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: House No. 3
Client: Jaafar Zardashtian
Location: Shiraz, Iran
Completion: 2002
Design Architect: Mehrdad Iravanian
Area: 4,842 sq ft
Cost: $113,000
AEInterest: Mesh sunshades, Exposed ductwork to exterior, Raw materials as structural elements

Chameleon Exhibition Centre – Istanbul, Turkey

Posted in Built by lindseylohberg2009 on January 27, 2010

Building: Chameleon (Borusan) Exhibition Centre
Location: Parkorman Forest, Istanbul, Turkey
Completed: 2001
Architect: GAD Architecture
Client: Borusan Company

AE Interests: Angular shaped building was determined by positioning around the old pine trees, all floors accessible by ramps and not stairs, ventilation slots are cut into a trapezoidal ramp that conceals the HVAC system, steel-clad facade.

Bilbeisi House-Jordan Valley, Jordan

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: Bilbeisi House
Client: Mutasem Beilbeisi
Location: Jordan Valley, Jordan
Completion: 1999
Design Architect: Sahel Al-Hiyari
Area: 6,241 sq ft
Cost: $82,000
AEInterest: Renovation and addition, incorporation  of old structure to maintain low cost, cost reducing included using local building practices and materials such as acid-treated limestone and cement tiles

Consultation space for a Psychologist-Amman, Jordan

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: Consultation space for a Psychologist
Client: Dr.Josi Salem Pickartz
Location: Amman, Jordan
Completion: 2001
Design Architect: Sahel Al-Hiyari
Area: 829 sq ft
Cost: $20,000
AEInterest: Renovation, Strict Budget; Main space contains internal skin consisting of sliding panels that control amount of light that enters the space; Louvers, shutters, and light fixtures fully adjustable

Gyeongju Tower – Gyeongju, South Korea

Posted in Built by Sophia Kim on January 27, 2010

Images: 1, 2, 3

Building: Gyeongju Tower
Location: Gyeongju, South Korea
Completed: 2007
Architects: Lee Jong Soo, Mr. JEON, JAE‐WOO
Client: The Gyeongju World Culture Expo Organizing Committee

AE Interest: Steel structure, inspired by the Hwangryongsa pogada style temple, glass and aluminum structure, generates solar power renewable energy, LED (light emitting diode)

Palmach Museum of History-Tel Aviv, Israel

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: Palmach Museum of History
Client: M. Peri, S. Gavish, Palmach Veterans Association
Location: 10, Haim Levanon Street, Tel Aviv, Israel
Completion: 2002
Design Architect: Zvi Hecker, Rafi Segal
Landscape: Tichnun Nof Ltd.
Area: 54,876 sq ft
Cost: $6,331,000
AEInterest: Exposed Concrete, Stone, Cladding Materials

House ZEK 17-Dbaye, Lebanon

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: House ZEK 17
Client: Karim Abillama
Location: Mandaloun Street, Metn, Dbaye, Lebanon
Completion: 2003
Design Architect: Raed Abillama
Project Architect: Johnny Salman
Contractor: Karim Bassil
Structural Engineer: Sleima Serhal
Elec/Mech Engineer: Elie Ibrahim
Area: 21,520 sq ft
Cost: $1,000,000
AEInterest:  Reconstruction, Reinforced concrete jacketing, Cladding materials, Heating system composed of natural gas Boiler and vacuum tube solar panels

AWB 654-Beirut, Lebanon

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: AWB 654
Location: abde el wahab el inglizi street, Ashrafieh, Beirut, Lebanon
Completion: 1999
Design Architect: Raed Abillama
Area: 26,900 sq ft
Cost: $1,250,000
AEInterest: Glass Curtain Wall, Building developed as a molded concrete and hard block load bearing structure, Climate responsive terracotta facing, Exterior cladding materials

Centrale-Beirut, Lebanon

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: Centrale
Client: Centrale
Location: Mar Maroun Street, Saifi, Beirut, Lebanon
Completion: 2001
Design Architect: Bernard Khoury
Contractor: Eli Abdelnour
Structural Engineer: Robert Riachi
Mechanical Engineer: George Fares
Electrical Engineer: Hanna Habchi
Design Team: DW5
Area: 6,241 sq ft
Cost: $970,000
AEInterest: Reconstruction, damaged facade was not repaired instead it was covered in wire mesh and then reinforced by horizontal beams around the outside perimeter while the interior was voided out.

Yabani-Beirut, Lebanon

Posted in Built by alfredomaldonado2009 on January 27, 2010

Building: Yabani
Client: Yabani
Location: Damascus Road, Ashrafieh, Beirut, Lebanon
Completion: 2002
Design Architect: Bernard Khoury
Design Team: DW5
Contractor: Fundamentals
Transportation system contractor & equipment manufacturer:Mitsulift and Equipment SAL
Component supplier: GMV & Autinor
Area: 6,421 sq ft
Cost: $660,000
AEInterest: reception room (like elevator) that moves vertically from street level to the restaurant below ground. Aluminum Clad Turret, metal grills provide shading, Glass Floor Panels

Kim Ok-Gil Memorial Hall – Seoul, South Korea

Posted in Built by Sophia Kim on January 27, 2010

Building: Kim Ok-Gil Memorial Hall
Location: Seoul, South Korea
Completed: 1998
Architect: Archium
Constructor: Sejin Development

AE Interest: Exposed Concrete for the floor, ceiling, walls, and floor, repetition of open and closed space, cut into concrete to place in glass windows, wood lattice panels

Samsung Jongno Corporate Headquarters – Seoul, Korea

Posted in Built by Sophia Kim on January 27, 2010

Building: Samsung Jongno Corporate Headquarters
Location: Seoul, Korea
Completed: 1999
Architect: Rafael Vinoly
Consultants: Charles Paik & Co. Inc.
Structural Engineers: Dewhurst Macfarlane and Partners & Structural Design Group Co. Ltd.

AE Interest: Steel frame, convex curve glass facade, elevator cores and stairs at corners for circulation system, vertical extension of three corner cores, cantilever steel frame, steel girders, larger scale aluminum girders, steel bezel technique to allow for light and trasnparent facade with only steel rods for support

Pudong International Airport – Shanghai, China

Posted in Built by Sophia Kim on January 27, 2010

Building: Pudong International Airport
Location:Shanghai, China
Completed: 1999
Architect: Paul Andreu
Leading Contractors: IBM, SITA
Clients: Shanghai Pudong International Airport, Shanghai International Holding Ltd

AE Interest: Curving light steel roof, vertical roof-supporting members that also acts as skylights, heavy concrete base, glass facade, withstands seismic motion, supported by steel chords and columns

Nordic Artists’ Centre – Dale, Norway

Posted in Built by Sarah Johnson on January 27, 2010

Building:  Nordic Artists’ Centre
Location: Dale, Norway
Completion Date: 1998
Architect:  Haga and Grov with Knut Hjeitnes and Ivar Egge in association

AE Interests: daylighting, five individual studios, five individual guest houses

Westminster Underderground Station – London, U.K.

Posted in Built by nickwilliams2009 on January 27, 2010

Building: Westminster Underground Station
Location: London, England, UK
Completed: 1999
Architect: Hopkins Architects
Contract Value: £80 million
Client: London Underground
Consulting engineer: Maunsell Ltd
Main contractor: Balfour Beatty – AMEC Joint Venture
Ready-mixed concrete: RMC Readymix Ltd
Cement: Castle Cement Ltd
Aggregates: RMC Aggregates Greater London
Reinforcement couplers: Ancon CCl Ltd
Formwork/falsework: PERI Ltd

AE Interests: Deepest ever excavation in central London, cast in place concrete

Mortuary at Asker Crematorium – Asker, Norway

Posted in Built by Sarah Johnson on January 27, 2010

Building:  Mortuary at Asker Crematorium
Location: Asker, Norway
Completion Date: 2000
Architect: Carl-Viggo Holmebakk
AE Interests: load-bearing masonry construction, interior brick surfaces

Canada Water Bus Station – London, England, U.K.

Posted in Built by nickwilliams2009 on January 27, 2010

Building: Canada Water Bus Station
Location: London, England
Completed: 1999
Architect: Eva Jiricna Architects
Contract Value: £3 million
Contractor : Carillion
Client: London Underground Ltd
Civil and Concrete Engineer: Benaim-Works JV

AE Interests: Acoustic control, natural lighting, cantilever roof spans

Two Houses at Sølvberget – Stavanger, Norway

Posted in Built by Sarah Johnson on January 27, 2010

Building: Two Houses at Sølvberget
Location: Stavanger, Norway
Completion Date: 2000
Architect: Helen & Hard
Client: Svendsen & Stangeland

AE Interests: simple wood structured wall as membrane

Private House – Zushi, Kanaqawa Prefecture, Japan

Posted in Built by jillmonholland2009 on January 27, 2010

Building: Private House
Location: Zushi, Kanaqawa Prefecture, Japan
Completed: 1998
Architect: Ricardo Legoretta

AE Interests: daylighting, Complex geometry

Paper Art Museum – Shizuoka, Shizuoka Prefecture, Japan

Posted in Built by jillmonholland2009 on January 27, 2010

Building: Paper Art Museum

Location: Shizuoka, Shizuoka Prefecture, Japan

Completed: 1999

Architect: Shigeru Ban

Structural Engineer: Hoshino Architects and Engineers

General contractor: Obayashi corporation

Engineer: Chiku Engineering Consultants

Square Footage: 18,000 square feet

AE Interests: daylighting, sustainability, fiber glass reinforced panels, overhang vertical shutter, steel frame structure

T House – Tokyo, Japan

Posted in Built by jillmonholland2009 on January 27, 2010

Building: T House
Location: Tokyo, Japan
Completed: 1999
Architect: Kei’ ichie Irie

AE Interests: daylighting, complex geometry, cylinder bathroom, space can be changed by sliding door, steel frame