AEWORLDMAP.COM (3,300+ posts)

Trump International Hotel and Tower – Chicago, Illinois, U.S.

Posted in Built by Isaac Nimick on September 2, 2015

Trump TowerTrump Tower

Trump Construction

 

 

 

 

 

 

1,2,3

Building: Trump International Hotel & Tower
Location: 401 N. Wabash Ave, Chicago, Illinois, U.S.
Completion: 2009
Architect: Adrian Smith – Skidmore, Owings & Merrill
Structural  and Civil Engineer: Skidmore, Owings & Merrill
Mechanical Engineer: WMA Consulting Engineers, Ltd
Construction Manager: Bovis Lend Lease

AE Interests: Includes three setbacks to acknowledge surrounding skyline. Building has a concrete core with several outriggers. The outriggers connect its central core with an exterior ring of structural columns. Stainless steel, curtain-wall façade. Cassion foundation. Chicago’s second tallest building at 1,388.45 ft. with 98 floors above ground and 2 floors below ground.

 

Al Bahar Towers – Abu Dhabi, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 2, 2015

Al Bahar Towers 1  Al Bahar Towers 3  Al Bahar Towers 4

[1, 2, 3]

Building: Al Bahar Towers
Location: Abu Dhabi, United Arab Emirates
Architect: Aedas Architects
Structural and Acoustic Engineer: Arup
General Contractor: Al-Futtaim Carillion
Completion: 2012

AEInterests: Responsive facade using traditional Islamic geometry for lattice shading device, triangle screens respond to sun movement to reduce solar gain and glare, all screens close during the evening.

Abu Dhabi Central Market – Abu Dhabi, United Arab Emirates

Posted in Built by Tarek El-Afifi on September 2, 2015

AD Central Market 1  AD Central Market 2  AD Central Market 4  AD Central Market 3

[1, 2, 3, 4]

Building: Abu Dhabi Central Market
Location: Abu Dhabi, United Arab Emirates
Architect: Foster + Partners
Structural Engineer: Halvorson and Partners
MEP Engineer: BDSP Partnership
Facade Consultant: Arup
Contractor: Arabian Construction Co.
Completion: 2012

AEInterests: Individual facade glazing using Arabic geometry, green roofs, high energy efficiency, open roofs to implement natural lighting and cooling.

The Oliv Condominium – Singapore

Posted in Built by My Vu on September 2, 2015

oliv_1oliv_2oliv_3

[1, 2, 3]

Building: The Oliv Condominium
Location: 11 Balmoral Road, Singapore
Completion: 2012
Architect: W Architects
Structual/Civil Engineers: Tham & Wong LLP
Contractor: Venturer Pte Ltd
Timber Consultants: EWS Consultants

AE Interests: Use of textured concrete, timber strips, and movable aluminum screens; beam and slab system; terraces are inspired by elevated topography, each one communally shared by two adjacent apartments (to be exempted from gross floor area calculations under urban regulations), but is designed and divided by a subtle line within the wood decking to provide a sense of private property for each owner.

Articles: 1, 2

Alpha Apartments in Lewisham – Sydney Australia

Posted in Built by Eric Nunez on September 2, 2015

Day1  Sky Unit1  Alpha-Apartments-Lewisham-by-Tony-Owen-Partners-14
[ 1 , 2 , 3 ]

Building: Alpha Apartments
Location: Lewisham, Sydney, Australia
Architect: Tony Owen Partners
Completion: 2015

AE Interests: Ecologically sustainable development, hexagonal pod-like façade (manufactured as a single aluminum extrusion). Alpha’s construction was a way to prove contemporary design can be as cost-effective as traditional designs. Top levels exit onto terraces through hexagonal sky units with panoramic views of the surrounding parklands, two-story lounges on every floor foster a sense of community among residents.

Articles: [ 1 , 2 ]

Administrative Complex on Varshavskaya Street – St.Petersburg, Russia

Posted in Proposed Design by Derek Jahelka on September 2, 2015

Office complex at Varshavskaya St. 1  Office complex at Varshavskaya St. 2  moscovskaya-zastava-building-a170913-4  
moscovskaya-zastava-building-a170913-1
1,2,3,4

Building: Administrative Complex on Varshavskaya Street
Location: Varshavskaya St., St.Petersburg, Russia
Architect: Architectural Bureau A.Len
Project Manager: S.Oreshkin
Project Chief Architect: R.Andreeva
Project Chief Engineer:A.Vainer
Completed: Proposed Design (2013)

AE Interests: Internal terraced atrium,  textured metal patterned facades, varying office building height to create terraced effect, stained glass designs in atrium and first floor glazing give feeling of “lightness” to complex, large cantilever over street level

Article 1, Article 2

Foundation Luis Vuitton – Paris, France

Posted in Built by Annabel Cook on July 15, 2015

luis vuitton1 luis vuitton2

1 , 2 ]

Building: Foundation Luis Vuitton
Location: Paris France
Completion: 2014
Architect: Gehry Partners, Frank Gehry
General Contractor: VINCI Construction
MEP  and Civil Engineer: Setec Batiment

AE Interests: Gives the impression of movement with curved glass panels, no concrete pillars, steel girders protrude out at variety of angles, panels for the white blocks are white fiber reinforced concrete, glass saves energy with a silk filter printed on the panels (reflects half of the exterior light) supported by wooden beams, fastenings allow for movement, deep foundation accounts for overhangs and imbalances to wind

Santa Caterina Market renovation – Barcelona, Spain

Posted in Built by Annabel Cook on July 6, 2015

catarina  caterina

[1,2]

Building: Santa Caterina Market renovation
Location: Barcelona, Spain
Completion: 2005
Architect: Enric Miralles / Benedetta Tagliabie EMBT
General Structural Engineer: Robert Brufau
Roof Engineer: Jose María Velaso
Housing Engineer: Miquel Llorens
Ceramic Manufacturer: Toni Cumella

AE Interests: Eccentric new roof flying over the walls of a neoclassical market, irregular arches with interior wood cladding and center bracing. It was an attempt by the city authorities to control complexity in the area’s development. The architects consolidated what had been the broken, irregular path of the unrealized avenue, in contrast to the urban-scale order that would have been imposed over the winding maze of medieval streets.

Limoges Concert Hall – Limoges, France

Posted in Built by Annabel Cook on June 27, 2015

limoges 4   limoges3 limoges france

[1,2,3]

Building: Limoges Concert Hall
Location: Limoges, France
Completion: 2007
Architect: Bernard Tschumi Architects
Local Architect: Atelier 4
Structural Engineers: Technip TPS
Acoustics: CIAL

AE Interests: Double envelope: an outer skin made of wood arcs and translucent rigid poly-carbonate sheets and an inner acoustical envelope of locally grown Douglas fir, meant to filter light, heat and acoustics. A good example of energy conservation and use of renewable materials.

Antalya Tower – Antalya, Turkey

Posted in Proposed Design by Annabel Cook on June 23, 2015

tower   section 2
 section from top 2  section from top

[1, 2, 3, 4]

Building: Antalya Tower
Location: Antalya, Turkey
Completion: To be finished by 2016
Architects: NITA (Nitelikli Tasarımlar Atölyesi)
Structural Engineers: Yapı Statik Proje
Mechanic: TSO
Electric: KEY
Facade Consultant: Guvendiksoy Facade Consultancy

AE Interests: Tripartite in form, viewing decks tapering into a single shaft at the building’s base, concrete service core which provides rigidity against on-site wind forces, facade also designed against strong winds

2 World Trade Center (2 WTC) – New York, New York

Posted in Proposed Design by Annabel Cook on June 23, 2015

world trade center 2    world trade 2

[1,2]

Building: 2 World Trade Center (2 WTC)
Location: New York, New York
Completion: Proposed Design
Architects:  BIG
Partners In Charge: Bjarke Ingels, Thomas Christoffersen
Project Manager: Ute Rinnebach
Structural Engineers: N/A

AE Interests: Manhattan’s third-tallest building if built today, responds to both low and high rise, mix-use spaces, maximizes buildable space

Video Tour: 1

gb3

 

.

ICD/ITKE Research Pavilion 2012 – Stuttgart, Germany

Posted in Built by Annabel Cook on June 16, 2015

     6.162

[1, 2, 3]

Building: ICD/ITKE Research Pavilion
Location: Stuttgart, Germany
Completion: 2012
Architects:  University of Stuttgart, Faculty of Architecture and Urban Planning
Structural Engineers: Institute for Computational Design (ICD) and the Institute of Building Structures and Structural Design (ITKE) at the University of Stuttgart

AE Interests: Double curved shape pavilion, entirely robotically fabricated from carbon and glass fiber composites, directional stress distributions with unidirectional layer structure,  anisotropic fiber for directed load transfer, fiber optic sensors continuously monitor the stress and strain variations

Glacier Skywalk – Jasper, Canada

Posted in Built by Annabel Cook on June 11, 2015

   glacier skywalk2

[1, 2]

Building: Glacier Skywalk
Location: Jasper, Canada
Completion: 2014
Architects: Sturgess Architecture
Structural Engineer: Read Jones Christoffersen Consulting Engineers
Construction: PCL Construction Manegement, Inc

AE Interests: Cantilevered corten steel and glass structure, parabola shaped, trapezoidal box girders supported at the cliff, then extended curved end is cable supported

Ribbon Chapel – Hiroshima, Japan

Posted in Built by Annabel Cook on June 11, 2015

   

[12]

Building: Ribbon Chapel
Location: Hiroshima, Japan
Completion: 2013
Architects: NAP Architects
Structural Engineers: Ove Arup & Partners Ltd, S structure

AE Interests: Free standing chapel, use of titanium zinc alloy, a three-dimensional brace and hoop effect for resisting horizontal and outward forces, pendulum-type base isolation, overhang-type tuned mass damper (TMD), dot point glazing (DPG) arms

Sejong Art Center – Seoul, South Korea

Posted in Built by Annabel Cook on June 9, 2015

arts theator sejong art

[1, 2]

Building: Sejong Art Center (SAC)
Location: Naseong-dong, Seoul, South Korea
Completion: March 2013
Architects: DMP (Designcamp Moonpark) Partners
Structural Engineer: I’ST
Mechanical Engineer: HIMEC
Civil Engineer: Daekyo E&C
Electrical : Jung Woo Eng.
Acoustics: ad&c

AE Interests: Multi-theater center, best acoustic quality using SAR (Source Selective Absorbtion & Reflection), long span roof for open entrance

Sejong Center for Performing Arts – Sejong, South Korea

Posted in Built by Annabel Cook on June 9, 2015

sejong sejong2

[1, 2]

Building: Sejong Center for Performing Arts
Location: Sejong, South Korea
Completion: 2013
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Performing Arts Center, complex interior theater, intricate pattern of louvers, curved roofs.

River Culture Pavilion (ARC) – Daegu, South Korea

Posted in Built by Annabel Cook on June 2, 2015

Screen shot 2015-06-01 at 11.54.58 PM  arc  Screen shot 2015-06-01 at 11.59.29 PM
[1,2, 3]

Building: River Culture Pavilion (ARC)
Location: Daegu, South Korea
Completion: June 2012
Design Architect: Asymptote Architecture
Local Architect: EGA
Structural Engineer: Knippers Helbig

AE Interests:  Multimedia theater pavillion, complex form integrated with landscape, ETFE plastic pillows, man-made peninsula, part of World Expo 2012.

Edited 6/2015gb

Sydney Modern – Sydney, Australia

Posted in Built by Gregory Brooks on June 1, 2015

Screen shot 2015-06-01 at 11.47.42 PM  Screen shot 2015-06-01 at 11.48.03 PM
[1, 2]   +  site

Building:  Sydney Modern Project (competition winner)
Location:  Sydney, Australia
Architect:  SANAA

AEInterest:  International competition winner, Lightweight pavilions connecting museum to landscape and city.
“includes the new building by SANAA, a revitalization of the original, 19th century building, and a new plaza linked to the Royal Botanic Gardens.”

Article: 1

Graz Central Station – Graz, Austria

Posted in Under Construction by Annabel Cook on May 27, 2015

graz  graz2  section graz

[12, 3]

Building: Graz Central Station
Location: Graz, Austria
Completion: Under Construction
Architect: Zechner & Zechner
Structural Engineer: Zenkner Consulting Engineer
Concrete Engineer: Schimetta Consult Ziviltechniker

AE Interests: dynamic curved roof system, long two-span beam, reflects natural light, LED atmospheric lighting system for evening, prefabricated steel structure

Articles: [1, 2]

Surrey City Centre Library – Surrey, British Columbia, Canada

Posted in Built by Annabel Cook on May 16, 2015

centre library    

12

Building: Surrey City Centre Library
Location: Surrey, British Columbia
Completion: 2011
Architect: Bing Thom Architects
Structural Engineer: Fast + Epp
Civil Engineer: CitiWest Consulting Ltd.
Construction: Stuart Olson Dominion
Mechanical Engineer: AME Consulting Group
Electrical Engineer: Applied Engineering Solutions
Geotechnical Engineer: Trow Consulting Engineers

AE Interests: sloped walls, complex interior space, concrete frame, flexible plan for future expansion

Articles: 1, 2

Stadskantoor – Rotterdam, Netherlands

Posted in Built by Yee Sang Wong on May 11, 2015

Screen Shot 2015-05-10 at 8.21.26 PMScreen Shot 2015-05-10 at 8.20.50 PM  Screen Shot 2015-05-10 at 8.22.07 PM

Image credits: 1, 2, 3
Building: Stadskantoor
Location: Meent 119, 3011 JH Rotterdam, The Netherlands
Architect: OMA
Structural Engineer: Pieters Bouwtechniek Delft
Construction: Guangzhou Construction Engineering Supervision
Competition Engineering, Structural And Installations: ABT: Rob Nijsse, Gyuszi Florian, Niek Kunnen, Harry Pasterkamp, Jeroen ter Haar
Under Construction (estimated completion date: mid-2015)

AE Interests: modular structural system and programmatic versatility, mixed-use (offices and apartments), open space on street level, the most sustainable building in the Netherlands, translucent insulation, stacked units

,,,,

Edited May2015 by YW.

Guangzhou Opera House – Guangzhou, Guangdong Province, China

Posted in Built by Yee Sang Wong on May 11, 2015

Screen Shot 2015-05-10 at 6.46.57 PMScreen Shot 2015-05-10 at 6.46.39 PMScreen Shot 2015-05-10 at 6.48.26 PM

Image credits: 1, 2, 3
Building: Guangzhou Opera House
Client: Guangzhou Municipal Government
Location: Guagnzhou Opera House, Tianhe, Guangzhou, Guangdong, China
Architect: Zaha Hadid Architects
Facade Engineer: KGE Engineering
Structural Engineer: SHTK 
Acoustical Engineer: Marshall Day Acoustics
Construction: Guangzhou Construction Engineering Supervision
Completed 2010

AE Interests: architectural language of fluidity and seamlessness, intricate secondary steel structure, 1800-seat auditorium, latest acoustic technology.

Video of the Guardian describing Zaha Hadid’s design process on Guangzhou Opera House.

,,,,

Edited May2015 by YW.

Intesa Sanpaolo Office Building – Torino, Italy

Posted in Built by Nathan L Sanchez on May 8, 2015

lusas sanpaoloturintower
[1,2,3]

Building: Intesa Sanpaolo Office Building
Location: Torino, Turin, Italy
Completion: 2014
Architect: Renzo Piano Building Workshop
Engineers: Expedition Engineering/ Studio Ossola

AE Interest: bioclimatic building, naturally ventilated, southern facade covered by photovoltaic panels, 6 mega-columns support two glass planes

Asia Society Hong Kong Center – Admiralty, Hong Kong, China

Posted in Built by Sydney Valentine Moore on April 26, 2015

Asia Society_02 Asia Society
[1, 2]

Building: Asia Society Hong Kong Center
Location: Admiralty, Hong Kong, China
Completion: 2012
Architect: Tod Williams Billie Tsien Architects + Partners
Structural Engineer: Arup

AE Interests: Steeply sloped site, concrete bridge connecting buildings on the site, y-shaped structural supports, jungle and city scape

St. Voile Chapel – Niigata City, Japan

Posted in Built by Sydney Valentine Moore on April 24, 2015

St. Voile Chapel   St. Voile Chapel_04
[12]

Building: St. Voile Chapel
Location: Niigata City, Japan
Completion: 2014
Architect: Kasahara Design Work
Structural Engineer: OGA

AE Interests: Natural slate, single construction method used for walls and roof, arced pipes
Design Concept: Wedding veil

LeFrak Center at Lakeside – Prospect Park, Brooklyn, New York, U.S.

Posted in Built by Sydney Valentine Moore on April 23, 2015

LeFrak  LeFrak_02
[1, 2]

Building: LeFrak Center at Lakeside
Location: Prospect Park, Brooklyn, New York, U.S.
Completion: 2013
Architect: Tod Williams Billie Tsien Architects + Partners
Structural Engineer: Robert Silman Associates
Civil Engineer: Stantec
Construction: Sciame Construction

AE Interests: LEED Gold, restored landscape, built into the topography, green roofs, irregularly placed columns

Articles: 1

The Blue Planet – Copenhagen, Denmark

Posted in Built by Sydney Valentine Moore on April 22, 2015

Blue Planet  Blue Planet_02
[1, 2]

Building: The Blue Planet
Location: Copenhagen, Denmark
Completion: 2013
Architect: 3XN
Civil Engineer: Moe & Brodsgaard
Structural Engineers: MT Hojgaard, Hoffmann A/S, Kai Andersen A/S, E. Pihl & Son A/S

AE Interests: Whirlpole form binding together land and sea, diamond shape aluminum plate facade, organic forms, advance concrete/steel structure (54 unique steel frames), sea water used for cooling system for aquariums and climate system for public areas

Articles: 1

Mercat Encants – Gran Via-Pl de les Glòries, Barcelona, Spain

Posted in Built by Sydney Valentine Moore on April 22, 2015

Mercat Enchant  Mercat Enchant_02
[1, 2]

Building: Mercat Encants
Location: Gran Via-Pl de les Glòries, Barcelona, Spain
Completion: 2013
Architect: b720 Fermín Vázquez Arquitectos
Structural Engineer: BOMA
ME Engineer: JG

AE Interests: Suspended canopy, intertwining floors connected by ramps, stainless steal golden mirrors, post-tension sandwich slabs

Design Intentions: Preserve the market’s soul, dignify its role in Barcelona’s civic life, make it a large public space as opposed to a “commercial building”, provide it with a strong visual identity, contribute to formalising the future Glories Square

Krishna P. Singh Center for Nanotechnology – University of Pennsylvania, Philadelphia, Pennsylvania, U.S.

Posted in Built by Sydney Valentine Moore on April 20, 2015

Singh Center Singh Center_02
[1, 2]

Building: Krishna P. Singh Center for Nanotechnology
Location: University of Pennsylvania, Philadelphia, Pennsylvania, U.S.
Completion: 2013
Architects: Weiss/Manfredi
Structural Engineer: Severud Associates
Civil Engineer: Stantec
Leed/Sustainability Consultant : Viridian Energy & Environmental, LLC
Curtain Wall Consultant: R.A. Heintges & Associates

AE Interests: 68 foot cantilever, lateral connecting trusses, pleated metal skin, amber colored ultraviolet light filtering glass

More Photos: 1

European Central Bank – Frankfurt a.M., Germany

Posted in Proposed Design by Joshua Atkins on April 18, 2015

skel   bank  atrium
[12, 3]

Building: European Central Bank
Location: Frankfurt a.M., Germany
Completion: 2014
Architect: Coop Himmelb(l)au
Structural Engineer: B+G Ingenieure
Climate Design: Arup
Plumbing & Hvac: Ebert-Ingenieure
Lightning Design: Bartenbach LichtLabor

AE Interests: 607′ linked double-tower, dynamic spatial sequences.

Videos:
Virtual tour (4min),
Feature-length story vision to reality (45min)

Articles:
1, 2

Edited 4/2015 GB
—-

Diana Center at Barnard College – Manhattan, NY, U.S.

Posted in Built by Sydney Valentine Moore on April 15, 2015

Diana Center at Barnard  Diana Center at Barnard_02
[1, 2]

Building: Diana Center at Barnard College
Location: Manhattan, NY, U.S.
Completed: 2010
Architects: Weiss/Manfredi
Structural Engineer: Severud Engineers
Civil Engineer: Langan
Curtain Wall Consultant: R.A. Heintges Architects Consultants

AE Interests: Etched glass changes colors with different lighting (changes red, bronze and orange), curtain wall, green roof, recycled materials

Articles: 1
Videos: 1
More Photos: 1
—-

Cornell University Technology Campus- Roosevelt Island, NY, U.S.

Posted in Built by Sydney Valentine Moore on April 15, 2015

 Roosevelt Island_01 First Academic Building  Cornell NYC_01 Residential Tower
[1, 2, 3, 4]
Buildings: First Academic Building by Morphosis (2), Co-Location Building by Weiss/Manfredi (3), Residential Tower by Handel Architects (4)
Location: Roosevelt Island, NYC, NY, U.S.
Completed: First phase of construction expected 2017, Campus expected 2038
Campus Master Plan: Skidmore, Owings & Merrill, James Corner Field Operations
Mechanical Engineer: Buro Happold (First Academic Building)

AE Interests: First Academic Building- solar cells on roof, Co-Location Building- crystalline geometries, landscape terraces, rooftop photovoltaic canopy, Residential Tower- design inspired by diagonal lines from the site

Videos: 1

Sylvan Theatre – Washington D.C., U.S.

Posted in Built by Sydney Valentine Moore on April 10, 2015

Sylvan Theatre_01     Sylvan Theatre_03  Sylvan Theatre_02
[1, 2, 3]

Building: Sylvan Theater
Location: Washington D.C., U.S.
Architects: Weiss/Manfredi, Olin
Structural/Civil Engineer: Magnusson Klemencic Associates
Mechanical Engineer: Jaros, Baum & Bolles
Geotechnical Engineer: Geoconcepts Engineering
Acoustics: Threshold Acoustics

Design Concepts: Turn audience towards the Washington Monument, lift land to have all scales of shows, respect historic site, hide tour buses from view

AE Interests: Landscape, amphitheater, green roof, excavation

Mexico City International Airport – Mexico City, Mexico

Posted in Built by Sydney Valentine Moore on April 9, 2015

Mx City Int'l Airport   Mx City Int'l Airport_Interior
[1, 2]

Building: Mexico City International Airport
Location: Mexico City, Mexico
Architects: Foster + Partners, FR-EE (Fernando Romero EnterprisE)
Master Plan Design: Arup
Structural Engineering: Arup

M+E Engineer: Foster + Partners
2018 note: Under construction

AE Interests: Maximum span of 170 meters, single light-weight grid shell roof structure, prefabricated, sub floor services, natural ventilation, roof harvests solar energy and captures rain water.

Articles: 1
Videos: 1,
Fly Thru Video here – look for this image toward bottom of page:
Screen Shot 2018-09-26 at 5.41.38 PM

.

.

Capital Cairo Project – Cairo, Egypt

Posted in Built by Aleksa Diaz on April 7, 2015

Cairo-by-SOM_dezeen_784_0  Cairo-by-SOM_dezeen_784_3  Cairo-by-SOM_dezeen_468_4

[1, 2, 3]

Building/Project: Capital Cairo Project
Location: Cairo, Egypt.
Completed: Proposal submitted
Architects: Skidmore, Owings & Merril (SOM)
Engineers: SOM

AEInterest:  Design of cities, masterplan, Cairo population projected to double by several million in next 35 years, passive cooling strategies, housing.

Articles: 1, 2

Ring of Celestial Bliss – Hsinchu, Taiwan

Posted in Built by Aleksa Diaz on April 7, 2015

Ring-Celestial-Bliss-by-JJ-Pan-Partners-05  RCB02_materials  green_steel_01
[1, 2, 3]

Building: Ring of Celestial Bliss
Location: Hsinchu,Taiwan
Architects: J.J. Pan & Partners
Engineers: Li Jin Engineering Co. Ltd., Envision Engineering

AE Interest: Recyclable steel structure, Bamboo facade, permeable bamboo flooring, recycled PET plastic screen. Structure was recycled.

Articles: 1, 2

Waller Creek Redesign – Austin, TX, U.S.

Posted in Built by Aleksa Diaz on March 31, 2015

1351111494-the-poppy-in-the-confluence-mvva-team-400x500 1351111506-the-lattice-mvva-team-400x500 1351117013-screen-shot-2012-10-24-at-31618-pm-528x174

Building: Waller Creek Lattice, The Poppy
Location: Austin, TX, U.S.
Completed: Construction underway since 2014
Landscape architects: Architects: Thomas Phifer and Partners

AE Interest: Chain of parks connected by 6 trail bridges, Bridge pier that treats storm water, island park, floating pontoon bridge, concrete tunnel vane doubles as support for lawn that floats out unto the water. The poppy- lightweight pavilion.

Article: 1, 2

Femme de Vals Tower – Vals, Switzerland

Posted in Built by Gregory Brooks on March 31, 2015

ValsTower  ValsPlan
[1,2]
Proposed Design (competition winner): Femme de Vals Tower
Location:  Vals, Switzerland
Architect:  Morphosis
Developer: Remo Stoffel
Competition: Feb 2015
Status:  to be determined.

AEInterest:  Luxury hotel, 82-story, 1,250 tall tower, appx. 100′ x 64′ in plan > 1:12.5 to 1:20 slenderness ratio, inspired by Giacometti’s Femme de Venise sculpture, controversial design for small town of Vals.

Article: 1

Shenzhen Stock Exchange – Shenzhen, China

Posted in Built by Madhumitha Venkataraman on March 10, 2015

elev  shenSTR  stockexchange3  shezhen
[1, 2, 3, 4]

Building: Shenzhen Stock Exchange
Location: Shenzhen, China
Completed: 2013
Architect: OMA
Structural Engineer: Arup
MEP Engineer: Arup
Façade Engineering Design: Graham Dodd, London Office
Level Acoustic: DHV Building and Industry
Client: Shenzhen Stock Exchange

AE Interests: skyscraper(49 floors), 3d megatruss cantilevered podium, roof garden.

Article: 1, 2

—-

Singapore Sky Greens – Kallang, Singapore

Posted in Built by Aleksa Diaz on March 10, 2015

pixkranji  skygreens-vertical-farm-22
Photos: 1, 2

Building: Sky Greens
Location: Kallang, Singapore
Completion: 2012
Engineers: DJ Engineering, Sky Greens

AE Interest: 120 individual aluminum A-frame towers that rotate vegetables via a hydraulic water pulley system. Each tower is 20 square feet, and 30 ft tall.

Article
….

San Francisco Museum of Modern Art – San Francisco, California, U.S.

Posted in Built by Aleksa Diaz on March 10, 2015

image032panel_installation_Felix_Weber_630x737timthumb

Photos: [12, 3]

Building: San Francisco Museum of Art
Location:San Francisco, California, U.S.
To be completed by: 2016
Facade Engineers: Leonie van Ginkel, Felix Weber, and Markus Schulte
MEP Engineer: Arup
Architect: Snøhetta

AE Interests: Facade constructed out of 700 individual glass-fiber-reinforced polymer panels. Sand-gel mixture coats each panel for anti-flammability & shimmer exterior.

Articles: [1]

Google Headquarters – Mountain View, California, U.S.

Posted in Built by Aleksa Diaz on March 10, 2015

google-mountain-view-renders-15  bjarke-ingels-group-BIG-thomas-heatherwick-google-headquarters-mountain-view-designboom-05  g1

Photos: 1,2,3
Building: Google Headquarters
Location: Mountain View, California, U.S.
Estimated Completion: 2020
Architect: Bjarke Ingels Group and Heatherwick Studio

AE Interests: 3.4 million square-feet
Lightweight multi-story movable block structures. Large translucent canopies over block structures; let in air and daylight.

Articles: [1][2]

A Path in the Forest – Tallinn, Estonia

Posted in Built by Madhumitha Venkataraman on March 6, 2015

forest1   forest2
[1, 2]

Building: A Path in the Forest
Location: Kadriorg Park, Tallinn, Estonia
Completed: 2011
Architects: Transsolar & Tetsuo Kondo Architects
Structural Engineer: Mutsuro Sasaki, Yoshiyuki Hiraiwa / SAPS (Sasaki and Partners)

AE Interests: installation, trail, delicate steel structure, connected with forest environment, curvilinear form

Article
….

Merchant Square Footbridge – Paddington, London, U.K.

Posted in Built by Madhumitha Venkataraman on March 6, 2015

bridge1   bridge2   bridge3
[1, 2, 3]

Building: Merchant Square Footbridge
Location: Paddington, London, U.K.
Completed: 2014
Architect: Knight Architects
Structural Engineer: AKT II
Mechanical, Hydraulic and Electrical Engineer: Eadon Consulting
Lighting Design: Studio Fractal
Landscape Architect: Townshend Landscape Design
Contractor: Mace

AE Interests: drawbridge/footbridge, cantilevered structure, hydraulic jacks
….

^

 

.

Holmenkollen Ski Jump – Oslo, Norway

Posted in Built by Madhumitha Venkataraman on March 6, 2015

skijump1   skijump2    skijump3
[1, 2, 3]

Building: Holmenkollen Ski Jump
Location: Oslo, Norway
Completed: 2011
Architect: JDS Architects
Landscape Architect: Grindaker
Consultants: Norconsult , Metallplan
Steel Contractor: Lecor Steel AB
Client: Oslo Municipality

AE Interests: Norwegian Steel Construction Prize 2011, modern ski jump, wind protection, ice track machine, steel ski jump

Article
—-

Tucheng Sports Center – New Taipei City, Taiwan

Posted in Built by Madhumitha Venkataraman on March 6, 2015

sportscenter3   sportscenter2   sportscenter1   sportscenter4
[1, 2, 3, 4]

Building: Tucheng Sports Center
Location: New Taipei City, Taiwan
Completed: 2014
Architect: Q-Lab
Design Director: Borden Tsend
Project Manager: Tunghan Wu
Project Designers: Zizi Huang, Foli Yeh, Albert Chiu, Kunghuei Wang
Construction Company: Best Giving

AE Interests: Cantilever, Walkway, Geometric Structure, window/wall system, sports center
—-

Article

Patronage Laique & Social Housing – Paris, France

Posted in Built by Madhumitha Venkataraman on March 6, 2015

paris1   paris2   paris3   paris4
[1234]

Building: Patronage Laique & Social Housing
Location: Paris, France
Completed: 2014
Architects: LAPS Architecture, MAB Architecture
Structural Engineer: AIA Ingénierie
Services Engineer: Noble Ingenierie
Client: RIVP Real – Board of the City of Paris
Energy Performance : VP Climate Plan , Housing and Environment A BBC Effi energy, Qualitel

AE Interests: Community/social housing, In/arch-Ance National Prize 2014

—-

Musée des Confluences – Lyon, France

Posted in Under Construction by Stephen Mathai on March 5, 2015

museeConfl confluence-cloud-lyon  Screen shot 2015-03-06 at 8.13.32 AM
images: 1, 2, 3

Building: Musée des Confluences (Museum of Knowledge)
Location: Lyon, France
Completion Expected: 2014
Architect: Coop Himmelb(l)au
Architect of Record: Patriarche & Co
Structural Engineering (Design): Bollinger + Grohmann
Structural Engineering (Executive): Coyne et Bellier; Van Santen
Acoustics: Cabinet Lamoureux
Lighting Consultant: Har Hollands

AE Interests: Complex geometry, cantilever `
—-ea

Articles: 1,

Updated 3/2015 by G.Brooks

Hermitage Plaza Towers – La Defense District, France

Posted in Built by Laith Quntar on March 2, 2015

hermitage_plaza_building_permit_02    hermitage_plaza_building_permit_01
(Sources)

Building: Hermitage Plaza Towers
Location: La Defense District, France
Architect: Foster and Partners
Structural Engineers: LERA and ARUP
General Contractor: Turner Construction
Completed: 2021

AEInterest: Tallest in Western Europe (1,017ft), Diamond-shaped in plan, Tapers outwards as the grow in height, diagrid structure, BREEAM ‘excellent’ rating, angled façade to provide self-shading and draw fresh air, technical rooms placed strategically to save space.

Edited 3/2015 GB

Garden Bridge – London, England, U.K.

Posted in Proposed Design, Under Construction by Brooks Barnhouse on March 2, 2015

GardenBridge1  GardenBridge2  bdNews_gardenBridge
[sources]

Building: Garden Bridge
Location: London, England
Completion: 2017
Architect: Thomas Heatherwick (Heatherwick studio)
Landscape Architect: Dan Pearson
Engineers: Arup

AE Interest: Pedestrian bridge over the river Thames, catalyst for urban renewal, elevated garden.

Updated 12/2014 by GB.
See 3rd image for announcement of final approval – ref. BDOnline.

^

 

.

Bitexco Financial Tower – Ho Chi Minh City, Vietnam

Posted in Built by Rachel Schutte on February 24, 2015

302 Bitexco_Financial_Tower_2002201252FStitched Panorama
[
1, 2, 3, 4]

Building: Bitexco Financial Tower
Location: Ho Chi Minh City, Vietnam
Completed: 2010
Architect: Carlos Zapata Studio
Structural Engineer:  Leslie E. Robertson Associates
Construction: Hyundai Engineering and Construction with Turner International

AE Interests:

Essentially an all-concrete structure with composite perimeter columns and concrete core walls. Office floors framed with reinforced concrete flat plate system. Poor soil conditions due to proximity to the Saigon River and the Mekong Delta; very long foundation piers (265ft). Perimeter tapers inward at lower 20 floors, limiting width and resistance to building sway. Structural design uses concrete outriggers and belt trusses are used to stiffen tower against swaying motion. 16 elevators.

Helipad cantilevered out on 52nd floor. Steel girder and beam system used because most economical. Almost the size of the 52nd floor itself.

[1, 2]
—-

Vauxhall Tower – London, U.K.

Posted in Built by Camille Carpenter on February 24, 2015

Vauxhall Tower 2 Vauxhall Tower 1 Vauxhall Tower 3
[1] [2] [3]

Building: Vauxhall Tower
Also Known As: St. George Wharf Tower
Location: London, United Kingdom
Completed: 2013
Architect: Broadway Malyan
Structural Engineer:  Robert Bird Group
Construction: Brookfield Multiplex

AE Interests:
Wind Turbine at the Top | Draws Water from London Aquifer for Heat Pump | High-Performance Triple Glazing
Circular Structural Wall as the Core | Inspired by a Catherine Wheel Firework
[1] [2]

—-

^

 

.

432 Park Avenue – New York, New York, U.S.

Posted in Built by Thanos Metaxas on February 24, 2015


(Photos)

Building: 432 Park Avenue
Location: New York, New York, U.S.
Completed: 2015
Architect: Rafael Vinoly Architects
Structural Engineer:  WSP Group
Developer: CIM Group, Macklowe Properties

AE Interests: Footprint: 93′ x93′, height 1,396 feet and 96 stories tall. [3]
The building’s main structural system is comprised of a large central concrete core that works in tandem with a 14,000 psi concrete basket grid exoskeleton. This combination of structures, along with two tuned mass dampers near the top of the building prevent high sway from wind loads. Every twelve floors in the building the next two floors are left empty to house mechanical systems that service the bottom six and top six floors. These empty spaces also allow for wind to pass through further reducing the drag caused by high winds. `
Articles: [1] [2], 3, 4

Edited 2/2015, 8/2018 GB.
—-

 

 

.

111 West Wacker – Chicago, Illinois, U.S.

Posted in Built by Kelley Grabner on February 23, 2015

Building: 111. West Wacker Drive
Location: Chicago, Illinois, U.S.
Completed: 2015
Architect: Handel Architects and Epstein
Structural Engineer:  Halvorson and Partners
Forensic Engineer: Wiss, Janney, Elstner Associates, Inc.
Developer: Related Midwest

AE Interest: forensic engineering, re-engineered structure for new architecture, glazed facade

S-Trenue Tower – Seoul, South Korea

Posted in Built by Emma Bradford on February 23, 2015

S-trenue  Three Towers  Section  Ground Floor Plan
[1, 2, 3, 4]

Building: S-Trenue Tower
Location: Seoul, South Korea
Status: Completed September 2009
Architect: Mass Studies
Structural Engineer: Junwoo Structure
MEP Engineering: HANA Consulting & Engineers

AE Interests:3-tower design; idea based on matrix studies; 32 bridges; variation of podium tower design; concrete and steel construction; contains commercial, retail, and residential spaces

Article (with more plans, images): 1
….

Apple Store – Huangzou, China

Posted in Built by Gregory Brooks on February 23, 2015

front  st
[1, 2]

Building:  Apple Store
Location:  Huangzou, China
Architect:  Foster + Partners
Completed: 2015

AE Interest:
“The main area inside the store features a 9m high space where the upper floor projects 12m from the rear wall”,
large sheets of glass: 11 large double-glazed panels, each 15m tall. [1]

Articles: 1, 2
—-

Central Station – Strasbourg, France

Posted in Built by Rebeca Lauprecht on February 23, 2015

haupt2  haupt1
[1,2]

Building: Strasbourg Central Station
(Hauptbahnhof Strasbourg)
Location: Strasbourg, France
Status:Completed in 2007
Architect: Jean-Marie Duthilleul /AREP
Structural Engineer: Ingenieurbüro RFR
Facade Consultant: Seele GmbH & Co. KG
Energy Consultant: Transsolar

AE Interests: Glass structure covering historical building

Central Embassy – Bangkok, Thailand

Posted in Built by Rebeca Lauprecht on February 23, 2015

central embassy1  Bangkok3
[1,2]

Building: Bangkok Central Embassy
Location: Bangkok, Thailand
Status: Completed in 2014
Architect: AL_A
Architect of record: Pi Design
Project manager: PPS
Structural engineer: Scott Wilson Kirkpatrick, Arun Chalseri Consulting
Main contractor: Italian Thai

AE Interests: Inspired by traditional Thai architecture;complex geometry, step terraces, and vertical gardens
—-

West Terminal of Algiers International Airport – Algiers, Algeria

Posted in Built by Rebeca Lauprecht on February 23, 2015

Agliers1  Algiers 2

[1,2]

Building: West Terminal of Algiers International Airport
Location: Algiers, Algeria
Status: Estimated Completion by 2018
Architect: Llewelyn Davies and BREA
Structural Engineer: Prointec
Construction: China State Construction Engineering Corporation Ltd.

AE Interests: Built to accomodate 10 million passangers per year as well as extra large aircraft, complex geometry
—-

Museum of Books and Language – Buenos Aires, Argentina

Posted in Built by Rebeca Lauprecht on February 23, 2015

EL Museo 1  El Museo 2

[1,2]

Building: Museum of Books and Language
(El Museo del Libro y de la Lengua)
(Museum of Books and Language)
Location: Buenos Aires, Argentina
Status: Completed in 2011
Architect: Clorindo Testa, Francisco Bullrich
Structural Designer: METRA Ingenieros

AE Interests: bold use of color, complex form.
—-

Cordoba Civic Center – Cordoba, Argentina

Posted in Built by Rebeca Lauprecht on February 23, 2015

Cordoba3  Cordoba4
[1, 2]

Building: Cordoba Civic Center
(Centro Civico de la Provincia de Cordoba)
Location: Cordoba, Argentina
Status: Completed in 2011
Architect: Lucio Morini and GGMPU Arquitectos
Architect of Record: Guillermo Pozzobón
Structural Engineer: Vanoli & Associates, Decibel, Tecno Riego, and  Del Bianco & Associates

AE Interests: Rectilinear building covered by angular concrete shading skin, reflecting pool.

Article [1]
—-

Whitney Museum of American Art – New York City, New York, U.S.

Posted in Built by Gregory Brooks on February 22, 2015

rend  Gansevoort_Whitney_April_2013_jeh  const  sec

[1, 2, 3, 4]

Building: Whitney Museum of American Art
Location: New York City, New York, U.S.
Architect: Renzo Piano Building Workshop
Assoc. Architect: Cooper, Robertson & Partners.
Structural Engineer: Roberts Silman Associates
Lighting Designer: Arup
M.E.P. Engineer: Jaros, Baum & Bolles
Construction: Turner Construction, LLC

AE Interests:  steel structure, cantilevered entrance, largest column-free museum gallery in New York City [1].

“…the new Renzo Piano–designed building in New York City’s meatpacking district will open Friday, May 1, 2015.” RPBWnews

—-

Park Hyatt Guangzhou Mixed-Use Tower – Guangzhou, China

Posted in Built by Caitlyn Kallus on February 22, 2015

ParkHyatt3  ParkHyatt4
[1, 2]

Building: Park Hyatt Guangzhou Tower
Location: Guangzhou, China
Completed: 2015 (Expected)
Architect: Goettsch Partners

AE Interest: 946.52 ft tall mixed-use tower includes offices, condominiums, apartments, retail, and a hotel; Exterior pinches in at corners to distinguish different functions of the building; Two-acre site sits over a transit station at the intersection of two subway lines; Staggered vertical strips on the facade stretches and compresses like tendons
….

Mercury City Tower – Moscow, Russia

Posted in Built by Samantha K on February 22, 2015

7-mercury-city--this-75-story-tower-in-moscow-is-designed-to-use-less-water-and-electricity-by-collecting-melting-water-the-tallest-building-in-europe-it-features-two-high-speed-elevators-that-travel-23-f  Mercury_City_Tower
[Sources]

Building: Mercury City Tower
Location: Moscow, Russia
Architect: Frank Williams and Partners, M.M. Posokhin
Structural Engineer: Mosproject-2
MEP: AE Arma-Elektropanc (AE)
Number of Floors: 75
Overall Height: 1112 feet (339.92 meters)
Completed: 2013

AE Interest: Multi-Use High Rise (shops, restaurant, apartments, office spaces), Primary structural materials: steel and heat-resistant reinforced concrete, Natural lighting for 75% of workspaces, Uses less water due to mechanisms that collect melting snow for use throughout the building
—-

240 Blackfriars Road – London, England, U.K.

Posted in Built by Madhumitha Venkataraman on February 20, 2015

Blackfriars1   Blackfriars2   blackfriars3
[1, 2, 3]

Building: 240 Blackfriars Road
Location: London, England, U.K.
Completed: 2014
Architect: Allford Hall Monaghan Morris
Structural Engineer:  AKTII
Building Services Engineer: Hilson Moran
Developer: Great Portland Estates plc
Consultant: BIM Technologies

AE Interest: fully glazed glass exterior, reinforced concrete vertical structure, solar shading, 4D BIM modeling

Article
—-

Building for Environmental Research and Teaching – Providence, Rhode Island, U.S.

Posted in Built by Madhumitha Venkataraman on February 17, 2015

BrownUnivBuilding  atrium
[1,2]

Building: Building for Environmental Research and Teaching, Brown University
Location: Providence, Rhode Island, U.S.
Completed: 2013
Architect: Toshiko Mori
Structural/MEP Engineer: Arup

AE interest: Environmental Research building, greenhouse, rectangular form, expected LEED Gold certificate
,,,,ea

WSU Veterinary Medical Building – Pullman, Washington, U.S.

Posted in Built by Madhumitha Venkataraman on February 17, 2015

WashingtonStateUnivVetBuilding  WSU2
[1,2]

Building: Washington State University’s Veterinary Medical Building
Location: Pullman, Washington, U.S.
Completed: 2012
Architect: SRG Partnership
MEP Engineer: Arup
Structural Engineer: Magnusson Klemencic Associates
Landscape Architect: Walker Macy
Construction: Lydig Construction

AE interest: Laboratory facility, glass façade, daylighting, high efficiency ventilation

—-

Northeastern University ISEC – Boston, Massachusetts, U.S.

Posted in Built by Madhumitha Venkataraman on February 17, 2015

ISEC1 ISEC2 ISEC3
[1,2,3]

Building: Northeastern University Interdisciplinary Science & Engineering Complex (ISEC)
Location: Boston, Massachusetts, U.S.
Completion: 2016
Architect: Payette
MEP Engineer: Arup

AE interest: Efficient laboratory, spiral staircase, pedestrian bridge
….

Dornier Museum – Friedrichshafen, Germany

Posted in Built by Rebeca Lauprecht on February 17, 2015

DornierMuseum1  DornierMuseum2
[1,2]

Building: Dornier Museum
Location: Friedrichshafen, Germany
Status: Completed in 2009
Architect: Allmann Sattler Wappner Architekten
Structural Engineer: Werner Sobek Ingenieure
Building Services: Laux, Kaiser & Partner Ingenieursgesellschaft
Interior Design: Grego
Facade Consultant: R+R Fuchs
Energy Consultant: TransSolar Energietechnik GmbH

AE Interests: Serves as a hangar for planes in exhibition, long-span structure, curved translucent facade

—-

RSH Towers – Abu Dhabi, United Arab Emirates

Posted in Built by Rebeca Lauprecht on February 13, 2015

RHS1  RHS2
[1, 2]

Building: RSH Towers
Location: Maryah Plaza, Abu Dhabi, United Arab Emirates
Status: Expected Completion in 2016
Architect: Rogers Stirk Harbour + Partners
Architect of Record: Pascall + Watson
Engineer of Record: Buro Happold
Interior Designer: Stuart Forbes Associates
Landscape Design: Gillespies LLP

AE Interests: Each tower is diamond-shaped in order to provide maximum lighting, expressed structure.

Massachusetts College of Art and Design’s Student Residence Hall – Boston, MA, U.S.

Posted in Built by Andrew Chien on February 9, 2015

MIAD front facade  MIAD metal panels
[Source]

Building: Massachusetts College of Art and Design’s Student Residence Hall
Architects: ADD Inc.
Location: Boston, MA, USA
Year: 2013
Structural Engineer: Odeh Engineers, Inc.
MEP Engineer: WSP Flack + Kurtz
Main Constructor: Suffolk Construction Company, Inc.

AE Interest: Facade constructed of 5,500 metal panel that have 5 distinct colors whose purpose is to mimic a tree. Curved base constructed through use of steel truss system. LEED Silver. More than 50 percent of the building materials used has recycled content. Orientation of windows help to lessen heat gain.

Article: 1
—-ea

Neuroscience and Psychology Complex – Princeton, New Jersey, U.S.

Posted in Built by Gregory Brooks on February 5, 2015

neuroPrincetonExtRend

1, 2

Building: Neuroscience and Psychology Complex
Location: Princeton University, Princeton, New Jersey, U.S.
Architect: José Rafael Moneo Vallés Arquitecto and Davis Brody Bond
Completed January 2014

AE Interest: Pursuing LEED Silver certification, natural lighting, stormwater reclamation system for non-potable use, high-performance glass façade.

Convention and Exibition Center – Ras Al Khaimah, United Arab Emirates

Posted in Built by Sydney Valentine Moore on February 2, 2015

Convention and Exibition Proposal  Convention and Exibition Proposal_02
[1, 2]

Building: Convention and Exhibition Center
Location: Ras Al Khaimah, UAE
Completion: Proposal
Architect: OMA

AE Interests: 44 story sphere, glass/steel construction
Design Concept: Presenting a unique form to UAE’s master plan

Subway Station – Naples, Italy

Posted in Built by Gregory Brooks on January 29, 2015

naplesExt2  naplesStructure
[1,2]

Building: Naples Subway Station
Location: Naples, Italy
Architect: Amanda Levete Architects
Sculptor: Anish Kapoor
Local architect: Studio DAZ
? Engineer: Arup
Services engineers: Tecnosistem

AE Interests: complex geometry, stainless steel polished exterior.
….

Ref: 1

Children’s Activity and Learning Center -Koh Kood, Thailand

Posted in Built by Laith Quntar on December 15, 2014

childrenactivity_01 childrenactivity_04 childrenactivity_07 childrenactivity_11new childrenactivity_33 childrenactivity_34
(
Sources)

Building: Children’s Activity and Learning Center
Location: Koh Kood, Thailand
Completed: 2009
Architect: 24h-architecture
Local Architect: Habita Architects
Structural Engineer: Planning & Design Thailand
Structural Engineer for Wind-Tunnel Tests: Arup Thailand
Bamboo Consultant: Jörg Stamm

AEInterest: large organic translucent canopy that cantilevers up to eight meters, two bamboo columns anchor the structure, grouped members create flexible composite beams, Sustainable structure using local materials, bamboo’s natural openness facilitates excellent airflow through the Center

Article: 1, 2
….

Museo Soumaya – Mexico City, Mexico

Posted in Built by Laith Quntar on September 15, 2014

2672b3ad2410e1d860571c1d34d910ac8c92b626  Museo Soumaya 1  soumayga  soumaya
(Sources)

Building: Museo Soumaya
Location: Mexico City, Mexico
Architect: LAR / Fernando Romero
Structural Engineers: Arup/Gehry
Completed: 2011
Manufacturer: Geometrica

AEInterest: Shell is constructed of 28 curved steel columns of different sizes and diameters, facade is made of translucent concrete (airy but solid material) that filters light, skin made of  hexagonal aluminum modules to optimize conservation and durability, ceiling suspended from a cantilever

Article: 1
Video: 1

—-

Bosco Verticale Torre – Milan, Italy

Posted in Built by Jessica Olivares on September 15, 2014

Bosco Vertical yes 3  Bosco Verticale Yes 4
[Sources]

Building: Bosco Verticale Torre (Bosco Verticale) (The Vertical Forest)
Location: Milan, Italy
Architects: Boeri Studio

Completed: 2013
Landscape Design: Emanuela Borio and Laura Gatti
Structural Engineer: Arup Italia s.r.l.
MEP Engineer: Deerns Raadgevende Ingenieurs
Main Contractor: ZH Construction Company S.p.A

AE Interests:  Concept of regenerating the lost forests, the towers together have the capacity to hold 480 big and medium sized trees, 250 small size trees, 11,000 ground-cover plants and 5,000 shrubs… the equivalent of a hectare of forest. The vertical Forest helps to build a micro-climate and to filter dust particles. Diversity of the plants helps to create humidity, and absorb CO2 and dust, produces oxygen, protects people and houses from the suns rays.  Plants were pre-cultivated allowing the plants to get used to the conditions they were placed in on the buildings. `

Articles: [1]
—-ea

Chaoyang Park Plaza – Beijing China

Posted in Under Construction by Andrew Chien on September 14, 2014

Chaoyang Park Plaza Rendering 1  Chaoyang Park Plaza Rendering 2
[Source]

Building: Chaoyang Park Plaza
Architects: MAD Architects
Location: Beijing, China
Estimated Year of Completion: 2016
Directors In Charge: Ma Yansong, Dang Qun, Yosuke Hayano
Design Team: Zhao Wei, Kin Li, Liu Huiying, Lin Guomin, Bennet Hu Po-Kang, Julian Sattler, Nathan Kiatkulpiboone, Li Guangchong, Fu Changrui, Yang Jie, Zhu Jinglu, Younjin Park, Gustaaf Alfred Van Staveren
Client: Junhao Real Estate Beijing Jingfa Properties Co., Limited.
Construction Engineers: China Construction Design International Group Co., Ltd
Facade Design & Optimize Consultant: RFR
Landscape Design Consultant: Greentown Akin
Lighting Design Consultant: GD Lighting Design Co., Ltd

AE Interest: Facade designed to mimic traditional shan-shui paintings (shan-shui = mountain-water). Air purification system and ventilation system are integrated into the facade of the building. LEED Gold.
….

Honeycomb – New Providence, Bahamas

Posted in Under Construction by Andrew Chien on September 14, 2014

Honeycomb Front Facade  Honeycomb Pools  Honeycomb Water Feature
[Source]

Building: Honeycomb
Architects: BIG, HKS, Michael Diggiss Architects
Location: New Providence, Bahamas
Estimated Year of Completion: 2016
Partners In Charge: Bjarke Ingels, Thomas Christoffersen
Project Leader: Sören Grünert
Design Team: Benzi Rodman, David Spittler, Jenny Shen, Karen Shiue, Lujac Desautel, Romea Muryn, Brian Foster
Local Architect: HKS architects
Executive Architect: Michael Diggiss Architects (MDA)
Client: Tavistock Group / New Valley LLC
Developer: Howard M. Lorber, Tavistock Group

AE Interest: Honeycomb facade mimics the natural design of coral formations. Vertical columns of the honeycomb structure supports pools in each condo.
….