AEWORLDMAP.COM (2,900+ posts)

ENEL Bagnore 3 Geothermal Power Station – Santafiore, Italy

Posted in Built by Jimmy Principe on January 26, 2010

Building: ENEL Bagnore 3 Geothermal Power Station
Location: Santafiore, Italy
Completed 2001
Designer: Stefano Boeri
Structural engineer: M Giuliani
Landscape design: L Caravaggio
Client: ERGA – ENEL

AEInterest: the enclosure is constructed from self supporting Cor-Ten steel ribs and is designed to mimic the hills that it is nested in.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s