Office Südwestmetall – Esslingen, Germany
Building: Office Südwestmetall
Location: Esslingen, Germany
Date: 2016
Architect: fritzen 28
Climate Engineer: Transsolar
HVAC: Ingenieurbüro Joos
Contractor: Transplan (Technik)
AE Interest: Innovative heating system using an open loop heat pump. The heat pump uses groundwater typically at 53.6 F flowing through the slabs of the structure. The exhaust system is located in the parking garage under the structure to efficiently heat with out consuming additional heat.
leave a comment