AEWORLDMAP.COM (3,600+ posts)

New Court Rothschild Bank, London, U.K.

Posted in Built by utLondon2013 on June 11, 2013

1  New-Court-Rothschild-London-1
[1,2]

Building: New Court Rothschild Bank
Location: London, England
Completed: Late 2011
Architect: OMA

AE Interest: dark glass, main area built at top of building to preserve the historical area, repeated pattern of structural steel columns.

^

 

.

The Bexley Business Academy – London, U.K.

Posted in Built by Emily Lamon on June 11, 2013

30 

Images: [1] [2]

Building Name: The Bexley Business Academy
Location: Yarton Way, London, U.K.
Status: Completed 2003
Architect: Foster + Partners
Structural Engineer: Buro Happold

AE Interest: mechanical external louvers automatically track the sun’s path to optimize light and shade, double layered East and West facades, majority of spaces are naturally ventilated, flexible floor plan, fast-track construction

BT Tower – London, U.K.

Posted in Built by kathleen hetrick on June 11, 2013

Image

Images: 1
Building: BT Tower
Location: London, U.K.
Date of Project: 1966
Architects: Eric Bedford – Ministry of Public Buildings and Works

AE Interests: Originally used for radio broadcasting tower,the tower moves no more than 10 inches in 95 mph wind. The tower has the largest LED display in the world compromising of 529,750 panels.
—-mv

Restoration of the London Coliseum, U.K.

Posted in Built by utLondon2013 on June 11, 2013

Building: Restoration of the London Coliseum
Location: London, England
Date of Project: January 2004
Architect: Arts Team
Structural Engineer: Arup
M & E Engineer: Arup
AE Interest: Curved-glass roof, foyers have been enlarged by 40%, major improvements to public facilities

Other Consultants: Arup Acoustics, Carr and Angier, Gardiner & Theobald

Royal Victoria Dock Bridge – London, U.K.

Posted in Built by Emily Lamon on June 11, 2013

Images: [1]

Building Name: Royal Victoria Dock Bridge
Location: Royal Victoria Dock
Status: Completed 1999
Architect: Lifschutz Davidson Sandilands
Structural Engineering: Techniker

AE Interest: inverted Fink Truss, sender shape reduces wind resistance at the elevated height that allows ships to pass underneath, supports a 40 person gondola that travels across the river

London Eye – London, England, U.K.

Posted in Built by utLondon2013 on June 11, 2013

London_Eye_from_Westminster_Bridge   
[1,2]

Building: London Eye
Location: London, England
Opened: 1999
Architect: Marks Barfield
Structural Engineer: Tony Gee and Partners, Beckett Rankine
AE Interest: Reduce CO2 emissions, largest tilt-up ever made, steel design, “A” shape
—-mv

^

 

.

Classroom for the Future – London, U.K.

Posted in Built by kathleen hetrick on June 11, 2013

Image  Image

Images: 1 2

Building Name: Classroom for the Future
Location: Camden, London UK (temporary installation)
Status: Built in 2007
Architect: Gollifer Langston Architects
Structural Engineers: Michael Hadi Associates

AE Interest:Public school building with advanced ICT, audio/visual equipment and a stage. The building is modular and mobile.

Article
….

^

 

.

Crystal Palace Concert Platform – London, U.K.

Posted in Built by Emily Lamon on June 11, 2013

15325030

Images: [1] [2]

Building Name: Crystal Palace Concert Platform
Location: Crystal Palace Park Sydenham Hill, London, UK
Status: Completed 1997
Architect: Ian Ritchie Architects Ltd
Structural Engineers: Atelier One

AE Interest: constructed from a continuous surface of self-weathering steel, acoustics

House 1a – London, U.K.

Posted in Built by Marilyn Newberry on June 11, 2013

house 1a house 1a 2

Image Sources: [1], [2]

Building Name: House 1a / Camera Jewel House
Location: East Finchley, London N2
Year: 2001
Architect: Tonkin Liu
Structural Engineer: Atelier One

AE Interests: reflecting pool, camera obscura studio, house and studio facades face and reflect each other

Posted in Built by Marilyn Newberry on June 11, 2013

stadthaus

Image Source: [1]

Building Name: Stadthaus
Location: 24 Murray Grove, London N1 7FB, UK
Architect: Waugh Thistleton Architects
Structural Engineers: KLH and Techniker LTD
Contractor: Telford Homes PLC
Year: 2009

AE Interests: tallest timber structure in the world (nine stories), billed as carbon-negative

Source

The Wellcome Trust Gibbs Building – London, U.K.

Posted in Built by Emily Lamon on June 11, 2013

1

Images: [1] [2]
Building Name: The Wellcome Trust Gibbs Building
Location: 215 Euston Rd, London, UK
Status: Completed 2004
Architect: Hopkins Architects
Structural Engineer: WSP Consulting Engineers

AE Interest: houses a Thomas Heatherwick sculpture in the main atrium, double skin glazed facade, flexible floorplans, addition to original Wellcome Trust headquarters
—-mv

^

.

Richard Desmond Children’s Eye Centre- London, U.K.

Posted in Built by Meagan Wilkes on June 11, 2013

dsc_0735

Image credit: [1]

Buidling Name: Richard Desmond Children’s Eye Centre
Location: Moorfields Eye Hospital, 162 City Road, London UK
Status: Completed 2007
Architect: Penoyre & Prasad
Engineer: ARUP

AE Interest: natural lighting, LED lights, use of color

City of London Information Centre- London, U.K.

Posted in Built by Meagan Wilkes on June 11, 2013

1326698443-city-of-london-information-centre-6-make-chufton--crow

Image credit: [1]

Buidling Name: City of London Information Centre
Location: St. Paul’s Churchyard, London
Status: Completed 2007
Architect: Make Architects
Structural Engineer: Arup
Contractor: Skanska UK

AE Interest: Steel structure with stainless steel cladding, energy efficient design, recycling of rainwater
—-mv

^

 

.

Royal Ballet School Bridge of Aspiration- London, U.K.

Posted in Built by Meagan Wilkes on June 11, 2013

bridge-of-aspiration

Image credit: [1]

Buidling Name: Royal Ballet School Bridge of Aspiration
Location: Floral Street, London, UK
Status: Completed 2003
Architect: Wilkinson Eyre Architects
Structural Engineer: Flint and Neill

AE Interest: Advanced geometry, Rotating aluminum frames, LED lighting scheme

^

 

.

Kauffman Center for the Performing Arts – Kansas City, MO, U.S.

Posted in Built by Cody Lambert on April 25, 2013

building whole kauf cable ties kauf Outer Shell Kauf

Location: Kansas City, MO
Engineer: Arup
Architect: Safdie Architects with BNIM Architects

AE Interests: 1,600-seat concert hall and 1,800-seat ballet/opera house, cable-supported glass roof allowing for no interior columns, design influenced by nonlinear analysis and form-finding, combination of CIP concrete and steel framing allowed for fast tracking

Sources: [1]

Stone Vault, MLK Jr. Park – Austin, Texas, U.S.

Posted in Built by Gregory Brooks on March 19, 2013

block1  block2

Project: Stone Vault, MLK Jr. Park
Location: Austin, Texas
Design and Structural Engineering: Ochsendorf, DeJong and Block, LLC
CNC Fabrication and Masonry: AX5 Resources and  Escobedo Construction
Expected Completion: April 2015

AE Interests: Complex geometry, 5-Axis CNC stone-cutting machine, catalyst for community activities.

Thanks: C.Shortall, W.Meredith

Links: 1, 2

….

Ping An Finance Center – Shenzhen, China

Posted in Under Construction by Christopher Lawrence on February 25, 2013

Ping An Finance Center renderPing An Finance CenterPing An Finance Center cut away  Ping An Finance Center variations

Building: Ping An Finance Center
Location: Shenzhen, China
Completion: 2015 (expected)
Structural Engineer: Thornton Tomasetti
MEP Engineer: J. Roger Preston Group
Design Architect: Kohn Pederson Fox Associates
Developer: Ping An Life Insurance Company of China
Main Contractor: China Construction Design International
Associate Architect: China Construction Design International

AE Interests: This 2,165 foot skyscraper has been pre-certified as a LEED Gold project. The façade will consist of glass panels affixed to chevron-shaped vertical stone members that extend from the foundation. Perimeter columns are concealed within the stone verticals and will interlock at the corners by diagonal braces. The tower will house 115 stories with 42 million square feet of mixed use office space, hotel suites and restaurants and upon completion will be the second-tallest building in the world and the tallest in China.

—-

Baylor University Stadium – Waco, Texas, U.S.

Posted in Built by Gregory Brooks on February 25, 2013

179874  Capture
Project: Baylor University Stadium
Location: Waco, Texas
Architect: Populous
Structural and Facade Engineer: Buro Happold
Approved to proceed: 2012 (in progress)
Expected Completion date: Fall 2014

AEInterests: Stadium long span roof, facade technology, LEED rated.
Article: 1,
—-

The Round Tower House – England, U.K.

Posted in Built by Christopher Lawrence on February 22, 2013

Round-Tower-HouseRound-Tower-House courtyardRound-Tower-House aerial viewRound-Tower-House skylight

Building: The Round Tower
Location: Gloucestershire, England
Completion: 2012
Structural Engineer: Price & Myers
Main Contractor: GL50 Properties
Concrete Contractor: Stallard Construction
Architect: De Matos Ryan

AE Interests: Having suffered aging, neglect and fire, the original castle tower and subterranean dungeon were salvaged to create a medieval/contemporary hybrid residence. Naturally lit and ventilated by the open-air courtyard, this underground villa features glass-walled rooms, sun terrace, and an outdoor pool. The central interior feature is the round skylight that illuminates the interior while reflecting the circular design of the turret above. The substantial thermal mass of the concrete walls help regulate interior temperatures, proving that preserving the past while fostering innovation is the greatest strength of projects such as this.

—-

China Zun – Beijing, China

Posted in Under Construction by Christopher Lawrence on February 22, 2013

China ZunChina Zun entrance

Building: China Zun
Location: Beijing, China
Completion: 2016 (expected)
Developer: CITIC Real Estate
Architect: TFP Farrells

AE Interests: This 1,706 foot tall, mixed-use skyscraper will be the tallest building in the city upon its completion and will contain 21.5 million square feet of office space, apartments, six-star hotel suites, retail stores and other state-of-the-art facilities. The subtle vertical curves give this monolithic structure an elegant profile which will maximize floor area at the penthouse levels while providing structural stability at the base.

….

Federation Tower – Moscow, Russia

Posted in Under Construction by Christopher Lawrence on February 22, 2013

 Federation TowersFederationTower spireFederation Towers section

Building: Federation Tower
Location: Moscow, Russia
Completion: 2013 (expected)
Owner: Mirax Group
Developer: Stroymontage
Contractor: Turner Construction International
Architects:  Peter Schweger & Sergei Tchoban

AE Interests: This 1660 foot, multi-use complex will consist of two towers with a spire between them and house hotel suites, restaurants, cafes and apartments. The concrete being used for this structure is grade B90 which is twice as strong as traditional mix designs and should withstand a direct impact from an aircraft. The central spire will house two high-speed elevators with external glazing as well as an observation deck.

—-

Halley VI “Caterpillar” Research Station – Antarctica

Posted in Built by Christopher Lawrence on February 22, 2013

Halley VIHalley-VI-Antarctic-research-stationHalley-VI illustrationHalley-VI-Antarctic-research-station cutaway

Building: Halley VI Research Station
Location: Brunt Ice Shelf (Lat. 75˚35’S, Long. 26˚39’W)
Completion: 2013
Engineer: AECOM
Project Manager: Karl Tuplin
Contractor: MMS Technologies
Architect: Faber Maunsell & Hugh Broughton Architects

AE Interests: Dedicated to studying the Earth’s atmosphere, the station is elevated on ‘legs’ in order to escape the accumulation of snow. The design was the result of an international design competition launched in June 2004 in collaboration with the Royal Institute of British Architects (RIBA) and the British Antarctic Survey. The station is comprised of 8 modules that house accommodations, laboratories, offices, generators, an observation platform and other facilities. Given the extreme environmental conditions, such as temperatures commonly below -50˚C, the cladding proved to be one of the most daunting challenges; glass-reinforced plastics (GRP) form the protective skin of the modules.

—-

rl

South Mountain Community Library – Phoenix, Arizona, U.S.

Posted in Built by Gregory Brooks on January 23, 2013

ext3 ext2 int

Building: South Mountain Community Library
Location: Phoenix, Arizona [map]
Architect: Richard+Bauer

AE Interests: Rectangular form-language, copper cladding, steel structure, insulated rooftop lanterns, natural daylight, interior plate glass details.

photo source: 1, 2, 3
article

—- rl

MIT Media Lab – Cambridge, Massachusetts, U.S.

Posted in Built by Hannah James on January 17, 2013

The_MIT_Media_Lab_-_Flickr_-_Knight_Foundation MIT-Media-Lab-by-Maki-and-Associates-Interior-419

Building: MIT Media Lab
Location: Cambridge, Massachusetts
Year: 2009
Architect: Maki and Associates
Project Architect: Leers Weinzapfel Associates
Client:  Massachusetts Institute of Technology
Structural Engineers:  Weidlinger Associates, Inc.
MEP Engineers: Cosentini Associates

Size: 163,000 square feet
Cost: 90 Million Dollars

AE Interests: Steel Moment Frames, Low-E Glazing, Aluminum Curtain Wall Shading, Multi-Purpose

Article on Design Concepts
Sources: [1]

—- rl

Giant’s Causeway Visitor Centre – County Antrim, Northern Ireland, U.K.

Posted in Built by Krista Seaman on December 14, 2012

Giant's Causeway Visitor Centre Green Roof

Source of Images

Building: Giant’s Causeway Visitor Centre
Location: County Antrim, Northern Ireland
Completion Date: May 2012
Architect: Heneghan Peng Architects
Structural Engineer: Arup

AE Interest: BREEAM rating = excellent; High recycled content; Locally quarried stone;  Ground-source heating and cooling; Graywater recovery; 3 mullion types: largest made of basalt rocks around concrete cores carry roof load, medium-sized made of stacked stone, smallest with post-tensioned steel cables
—-rl

Tower at PNC Plaza – Pittsburgh, Pennsylvania, U.S.

Posted in Built by Krista Seaman on December 14, 2012

Tower at PNC Plaza solar chimney

Source of Images

Building: Tower at PNC Plaza
Location: Pittsburgh, Pennsylvania
Status: Construction began in Spring 2012, Expected completion in 2015
Architect: Gensler
Structural and Mechanical Engineer: Buro Happold

AE Interests: Naturally ventilated, Steel structure with glazed double curtain wall, Automated windows, Fuel cells, Solar panels, Geothermal systems, Climate-control system, Solar chimney.

PDF paper (Buro Happold)

—-rl

Sipopo Congress Center – Equatorial Guinea, South Africa

Posted in Built by Krista Seaman on December 14, 2012

exterior metal screen interior
Source of Images

Building: Sipopo Congress Center
Location: Equatorial Guinea, South Africa
Completion Date: June 2011
Architect: Tabanlıoğlu Architects
Structural Engineer: Emir Mühendislik, Adnan Öğüt
Contractor: Summa
AE Interests: Metal screen design and color reflects trees in the area and is placed to reduce solar gain and maintain energy efficiency, Interior alternating glass and wood panels are made to look like pineapples found in the area, All materials except the concrete had to be imported from abroad

….rl

Yad Vashem Holocaust Museum – HaZikaron, Jerusalem, Israel

Posted in Built by Sarah Olson on December 11, 2012

Hol1 Hol2

Building: Yad Vashem Holocaust Museum
Location: HaZikaron, Jerusalem, Israel
Status: Completed 2005
Architect: Moshe Safdie and Associates
Structural Engineer: Ben Abraham Engineers Ltd.
Exhibit Design: Dorit Harel Designers Ltd.
Total Cost: $90 million
Project Area: 190,521 sq ft.

AE Interests: arcaded concrete pavilion (reminiscent of a Sukkah) exhibits changing shadow patterns, entire structure is reinforced concrete, triangular shape chosen to bring in natural daylight while simultaneously supporting the pressure of the earth above, cantilevered platform.

Articles: [1]

—-rl

Museo Parc Alesia – Alise-Sainte-Reine, France

Posted in Built by Alex G. on December 11, 2012


Building: Museo Parc Alesia
Location: Alise-Sainte-Reine, France
Year: March 2012
Architect: Bernanrd Tschumi Architects
Size: 37 hectares
AE Interests: Wooden mesh façade surrounding the building acts as a thermal shield and limits energy consumption, exposed concrete walls, floor and ceiling, glazed rotunda

Sources: [1]

—-rl

Musee Jean Cocteau – Menton, France

Posted in Built by Alex G. on December 11, 2012

Musee

[1]

Building: Musee Jean Cocteau
Location: Menton, France
Year: November 2011
Architect: Rudy Ricciotti Architect
Structural Engineer: Eric Vallauri
Size: 23,235 square feet
AE Interests: Complex concrete design adapted for seismic loads. Skylight glazing. Central core with white finishes.

—-rl

New Court Rothschild Bank – London, U.K.

Posted in Built by Alex G. on December 11, 2012


New Court Rothschild Bank – London
Building: New Court Rothschild Bank
Location: London
Year: November 2011
Architect: Office of Metropolitan Architecture
Structural engineer: ARUP
Size: 140,000 square feet
AE Interests: Rectilinear, Sky pavilion, structural steel design

Sources: [1]

….rl

The Barnes Foundation – Philadelphia

Posted in Built by Alex G. on December 11, 2012

Building: The Barnes Foundation
Location: Philadelphia
Year: May 2012
Architect: Tod Williams Billie Tsien Architects
Structural Engineer: Severud Associates
MEP Engineers: Altieri Sebor and Wieber
Civil Engineers: Hunt Engineering
Size: 93,000 square feet
AE Interests: LEED Platinum certified, translucent canopy that appears to float above the stone building, rainwater collection for the site irrigation system, natural daylight, green roof, grey water re-use, intelligent lighting control system

Sources: [1]

—-rl

Calder Foundation Project Space – New York, New York, U.S.

Posted in Built by Alex G. on December 11, 2012


Building: Calder Foundation Project Space
Location: New York, New York
Year: December 2011
Architect: Stephaniegoto
Structural Engineer: Leslie E. Roberts Associates
Size: 4,000 square feet
AE Interests: Concrete slab and steel framing structural system, use of daylight and skylights, blue interference coating finish on stainless steel exterior cladding

Sources: [1], [2]
—-rl

0-14 Tower–Dubai

Posted in Built by Megan Shammo on December 11, 2012

0-14 Tower     0-14 Tower Steel

Image Credit

Building: 0-14 Tower
Location: Business Bay District, Dubai, U.A.E.
Architect: Reiser + Umemoto
Status: Completed 2010
Structure: Ysrael A. Seinuk

AE Interests: 1,326 holes of 5 different sizes give the building the swiss cheese look; 40 cm thick white concrete exoskeleton which provides shade to the building; Cooling effect created through a vacuum created by space between concrete skin and main building; Outer concrete serves as structural member and reduces need for interior beams

Sources: [1], [2], [3]
—-

Tel Aviv Museum of Art–Tel Aviv, Israel

Posted in Built by Megan Shammo on December 11, 2012

Tel Aviv     Tel Aviv Interior

Building: Tel Aviv Museum of Art
Location: Tel Aviv, Israel
Status: Completed October 2011
Architect: Preston Scott Cohen, Inc.
Structural Engineer: YSS Consulting Engineers Ltd.
Acoustics: M.G. Acoustical Consultants Ltd.
General Contractor: Hezkelevitch Engineering

AE Interests: Angular; 87 foot high atrium called ‘The Lightfall”; Complex space in center that gets simpler as a person moves to the perimeter; Atrium supports its own weight be provides no support for rest of building

Sources: [1], [2]

—-rl

Natural History Museum of Utah–Salt Lake City, Utah, U.S.

Posted in Built by Megan Shammo on December 11, 2012

National History Museum of Utah      Natural History Museum of Utah     SLC Museum Aerial

Building: Natural History Museum of Utah
Location: 301 Wakara Way, Salt Lake City, Utah
Status: Completed 2011
Architect: Ennead Architects

AE Interest: Integrated into Wasatch Mountain Range foothills; Copper exterior panels; Mimics surrounding mountainous landscape; Angular; Expected to get LEED Gold certification

Sources: [1]

—-rl

Poetry Foundation–Chicago, IL, U.S.

Posted in Built by Megan Shammo on December 11, 2012

Poetry Foundation   Poetry Foundation     Poetry Foundation

Building: Poetry Foundation
Location: 61 W. Superior Street, Chicago, IL
Status: Completed June 2011
Architect: John Ronan Architects
Engineer: Arup; dbHMS; Terra Engineering
Acoustical: Threshold Acoustics

AE Interests: Rectilinear; Includes a library, some reading spaces, a gallery, and a garden; Oxidized zinc wrapped exterior walls

Sources: [1], [2]

—-rl

Nordpark Cable Railway – Innsbruck, Austria

Posted in Built by Heriberto Fernandez on December 11, 2012

Norpark Norpark 2

Building: Nordpark Cable Railway
Location: Innsbruck, Austria
Status: Completed 2007
Architect: Zaha Hadid
Structural Engineers: Baumann, Obholzer Ziviltechniker, and Bollinger Grohmann Scheider ZT
Lighting Consultant: Zumbotel Lighting GmbH
Contractor: STRABAG AG

AE Interests: Connects 4 stations, base made from reinforced concrete, structure made with steel, cladding done with thermoformed glass, complex geometry, includes 820 foot long cable stayed bridge

Articles: 1 2

—-rl

K3 for Kukje Gallery – Seoul, Korea

Posted in Built by Alex G. on December 11, 2012


Building: K3 for Kukje Gallery
Location: Seoul, South Korea
Year: April 2012
Architect: SO-IL
Facade Engineering: Front Inc
Size: 32,290 square feet (gross), 13,500 square feet (building)
AE Interests: A custom made tight hand welded and grinded stainless steel rings that serves as a flexible chainmail mesh made out of metal creates a strong skin that adapts itself to the contour of the building.

Sources: [1]

….rl

El B Auditorium and Congress Hall – Cartagena, Spain

Posted in Built by Alex G. on December 11, 2012


Building: El B Auditorium and Congress Hall
Location: Cartagena, Spain
Year: November 2011
Architect: Selgascano
Structural Engineering: FHECOR
MEP Engineering: JG
Acoustic Engineering: Arau Acustica
Size: 200,000 square feet
AE Interests: Walls formed of polycarbonates that provide UV protection for external facades and fire resistant interiors. Plastics were not only economical in the making of the building but are also sustainable since 99% can be recycled.

Sources: [1]
—-rl

Brooklyn Botanic Garden Visitor Center – New York, New York, U.S.

Posted in Built by Alex G. on December 11, 2012

Building: Brooklyn Botanic Garden Visitor Center
Location: New York, New York
Year: 2012
Architect/Landscape: Weiss/Manfredi
Structural and Civil engineer: Weidlinger Associates Consulting Engineers
MEP Engineers: Jaros, Baum and Bolles Consulting Engineers
Size: 22,000 square feet
AE Interests: Green roof planting to reduce solar loads, copper standing-seam roof, geo exchange system, uses earth, plants, glass, and steel as essential materials. Sustainable design. Building is on track to earn LEED Gold certification.

Sources: [1]
—-

Universidade Agostinho Neto – Luanda, Angola

Posted in Built by Alex G. on December 11, 2012


Building: Universidade Agostinho Neto
Location: Luanda, Angola
Year: 2011
Architect: Perkins + Will
Landscape Architecture: Battle McCarthy
Consulting and Structural Engineers: Battle McCarthy
Size: 350,000 square feet
AE Interests: Painted aluminum sunscreens, roofs serve as airfoils, buildings allow daylight into building while minimizing solar gain and increase shadows and provide prevailing winds.

Sources: [1]
—-rl

Arabian Public Library – Scottsdale, Arizona, U.S.

Posted in Built by Heriberto Fernandez on December 11, 2012

Arabian Library 1 Arabian Library 2

Building: Arabian Public Library
Location: Scottsdale, Arizona
Status: Completed 2008
Architect: Richärd + Bauer
General Contractor: Redden Construction, Inc.
Mechanical Engineer: Kunka Engineering Inc.

AE Interests: Inspired by the canyons of Arizona, full length windows draw in light from the interior courtyard and views of the surrounding mountains, designed for maximum energy efficiency, made from 42.8% recycled material, the building utilizes low VOC paints, and an underfloor HVAC system circulates air, lowering the temperature of the outdoor courtyard and making it bearable even in the Arizona sun

Articles: 1 2
–
—rl

Ewha Womans University Campus Center – Seoul, South Korea

Posted in Built by Michelle Gilhousen on December 11, 2012

ewha1 Screen shot 2012-12-11 at 2.30.01 AM

Building: Ewha Womans University Campus Center
Location: Seoul, South Korea
Status: Completed 2008
Architect: Dominique Perrault
Structural Engineer: VP & Green Ingenerie
Mechanical Engineer: HIMEC
Civil Engineer: CG E&C

AE Interests: sensitivity to landscape, rebuilt the site’s original topography, concrete-framed structure divided into cloned halves by a valley, which resembles contemporary intervention in the landscape, granite pavers cover walking paths, insulated glazed walls supported by stainless-steel-clad aluminum framing system provide light to low interior levels, doorways provide alterations from continuos curtain walls, green roof, energy conservation of up to 25%, concrete core activation system that optimizes air flow.

Articles: 1, 2

—-rl

Glenstone Residence and Art Museum – Potomac, Maryland, U.S.

Posted in Built by Heriberto Fernandez on December 11, 2012

Glenstone Glenstone 2

Building: Glenstone Residence and Art Museum
Location: Potomac, Maryland
Status: Completed 2007
Architect: Gwathmey Siegel and Associates

AE Interests: private residence as well as an art museum, the structure is part of an assemblage of buildings and outdoor sculptures, the 22,000-square-foot museum is a multiple volume, single-level structure clad in zinc panels and French limestone. A large, naturally lit sculpture gallery is the organizing element for a sequence of 18-feet-high gallery spaces with state-of-the-art museum environmental controls, and an administrative office suite.
Articles: 1
–
—rl

Tokyo Midtown – Tokyo, Japan

Posted in Built by Michelle Gilhousen on December 11, 2012

midtown1 midtown2

Building: Tokyo Midtown
Location: Tokyo, Japan
Status: Completed 2007
Main Architect: Skidmore, Owings & Merrill (SOM)
Primary Developer: Mitsui Fudosan
Structural Engineer: Nikken Sekkei
Landscape Architect: EDAW

AE Interests: modeled after Manhattan real estate, approximately 5 million square feet, mix-usage of space (office, residential, retail, restaurant, and cultural components), has activity 24/7, consists of 6 buildings by multiple architects (including Suntory Museum of Art, 21_21 Design Sight, main plaza, shopping galleria, and 54-story office tower crowned by a five-star hotel- tallest building in Tokyo), SOM produced three main office buildings, boost sluggish economy,

Articles: 1, 2

—-ea

Parque Biblioteca España – Medellin, Colombia

Posted in Built by Heriberto Fernandez on December 11, 2012

Parque Biblioteca Parque Biblioteca 2

Building: Parque Biblioteca España
Location: Medellin, Colombia
Status: Completed 2007
Architect: Giancarlo Mazzanti
Collaborating Architects: Andrés Sarmiento, Juan Manuel Gil, Freddy Pantoja, Camilo Mora, Pedro Saa, Alejandro Piña, Iván Ucros, Gustavo Vásquez
Structural Engineers: Sergio Tobón and Alberto Ashner

AE Interests: brick and stucco structure, boulder like structures inspired by the terrain of the Andes Mountains, the three masses are linked together by a rectilinear concrete podium, uses natural day-lighting, exterior is enclosed by a dark stone tile fabricated in the surrounding region known as “cafe pinto”,  total costs of about $4 million,
Articles: 1 2 3
–
—rl

New Music Building at the Schulich School of Music – Montreal, Canada

Posted in Built by Michelle Gilhousen on December 11, 2012

music1 music3

Building: New Music Building at the Schulich School of Music
Location: Montreal, Canada
Status: Completed 2005
Architect: Saucier + Perrotte with Menkes Shooner Dagenais Architectes
Structural Engineer: Saia Deslauriers Kadanoff Leconte Brisebois Blais
Mechanical and Electrical Engineering: Pellemon Inc. / BPR
Acoustics: ARTEC

AE Interest: location of building (on a busy street), borders main music building, connects old structure with the new structure, brings local topography into building design, accommodates evolving interior space design, building is designed to look like exposed strata that had eroded from large mountains, rectangular structure, eight stories, a deep concrete band on one side 20 feet up from the ground, long staggered strip windows, black and gray zinc cladding.

Articles: 1, 2

—-rl

Kanagawa Institute of Technology Workshop – Kanagawa, Japan

Posted in Built by Heriberto Fernandez on December 11, 2012

Kanagawa 1 Kanagawa 2

Building: Kanagawa Institute of Technology Workshop
Location: Kanagawa, Japan
Status: Completed 2008
Architect: Junya Ishigami and Associates
Structural Engineer: Yasutaka Konishi

AE Interests: exterior walls of thin glass, delicate thin steel columns, natural day lighting
Articles: 1

—-ad

Portland Aerial Tram – Portland, Oregon, U.S.

Posted in Built by Michelle Gilhousen on December 11, 2012

tram1 tram2

Building: Portland Aerial Tram
Location: Portland, Oregon
Status: Completed 2006
Architect: Angelil/Graham/Pfenninger/Scholl (AGPS Architecture)
Structural Engineer: Arup
Facade Engineering Specialist: Dewhurst MacFarlane and Partners

AE Interests: a freestanding tower serves as the upper station, holds 1 million pounds of tram cars and cables, tram cars made of the coarsest available expanded-aluminum mesh gives shimmering effect of cars, required extensive wind testing, towers made of high tech wood laminates, tram cars go over Portland’s oldest national historic district, two parks, 13 streets, and 8 freeway lanes.

Articles: 1

—-rl

Herning Museum of Contemporary Art (HEART) – Denmark

Posted in Built by Hannah James on December 8, 2012

herning_art_sha_8518-WHOR 146AA20090905D0249-WHOR

Building: Herning Museum of Contemporary Art
Location: Herning, Denmark
Year: 2009
Architect: Steven Holl Architects
Local Architect: Kjaer and Richter A/S
Client:  Herning Center of the Arts
Structural Engineers:  Niras
Mechanical Engineers: Niras, Transsolar
Landscape Architect: Schønherr Landskab

Size: 5,600 square meters/40,000 square meter site

AE Interests: Convex Ceilings, Curvalinear, Daylighting, Multi-Purpose Space, Two Way Truss System, Tension Suspended Roof

Sources: [1][2]
—-rl

MAXXI/National Museum of XXI Century Arts – Rome, Italy

Posted in Built by Hannah James on December 8, 2012

006.tif MAXXI_Museum_Rome_by_Zaha_Hadid_03

Building: MAXXI/National Museum of XXI Century Arts
Location: Rome, Italy
Year: 2009
Architect: Zaha Hadid Architects
Project Architect: Gianluca Racana
Client:  Italian Ministry of Culture, City of Rome, MAXXI Foundation
Structural Engineers:  Anthony Hunt Associates, OK Design Group, Studio S.P.C S.P.L
Lighting Engineers: Equation Lighting
Acoustics Engineers: Paul Gillerion Acoustics
Planning: ABT (Rome)

Size: 30,000 square meters

AE Interests: Complex Geometry, Cantilever Deck, Daylighting Systems, Mechanized Lighting, Concrete Technology

Article on Lighting System
Video of Interior Spaces

Sources: [1]
–
—rl

Reina Sofia Museum – Madrid, Spain

Posted in Built by Abdullah Alqaroot on December 7, 2012


[source]                                                                                              [source]

Building: Reina Sofia Museum
Location: Madrid, Spain
Status: Under construction
Architect: Jean Nouvel
Structural Engineering: Esteyco
MEP Systems: JG Asociados
Lighting: Erco
Project Manager: Alberto Medem
Consultants: Higini Arau, Rafael Guijarra
Economist: Rafael Guijarro
Client: Museo Nacional Centro de Arte Reina Sofia (MNCRS), Ministry of Culture

—-rl

The National Library – Victoria Street, Singapore

Posted in Built by Abdullah Alqaroot on December 7, 2012

   4

[Source]                                                                          [source]

Building: The National Library
Location: Victoria Street, Singapore
Status: Completed 2004
Architect: TR Hamzah & Yeang
Structural and Mechanical Engineering: Buro Happold
Building Performance Simulation: Total Building Performance Team
Embodied Energy & Materials Specifications Consultant: Battle McCarthy Façade Design Consultant: Arup Façade Engineering
IT Consultant: Arup Communications
Client: The National Library Board

AE Interest: Use of Day lighting, good solar orientation, sun shading, natural ventilation, use of recycled materials in the building., very sustainable.

Article [1]

—-rl

Federal Environmental Agency – Dessau, Germany

Posted in Built by Abdullah Alqaroot on December 7, 2012

Federal Environmental Agency      2
[Source]                                                                                 [Source]

Building: Federal Environmental Agency
Location: Dessau, Germany
Status: Completed 2005
Architect: Sauerbruch Hutton
Structural Engineering: Krebs & Kiefer
Structural System: HochTief Construction AG
Energy and Environmental Engineering: Zibell Willner & Partners
Consultants: ST raum a
General Constructor: Harms & Partner
Client: Federal Republic of Germany

AE Interest: the building is a case sudy in sustainable design.The architectural design of the building helps in actively reduce the energy consumption and the production of carbon dioxide in the atmosphere. High thermal insulation, use of geothermal heat-exchange systems. Photo voltaic plant and thermal solar panels.

2012fallmfw
—-rl

Liberal Arts and Science College- Doha, Qatar

Posted in Built by Katelyn Beiter on December 6, 2012

doha  insidedoha

Building: Liberal Arts and Science College
Location: Doha, Qatar
Completed: 2003
Architect: Perkins + Will and Shunji Nagata/Fox & Company
Architect of record: Kazuhiro Kojima + Kazuko and Akamatsu/C+A
Structural Engineer: Arup
MEP Engineer: McGuire Engineers
Project Manager: KEO International Consultants

AE Interest: Perforated metal roof, secondary GRC panel skin to adapt to harsh climate, 30, 60, 90 degree parallelograms make up facade, mosaic layout of a typical Islamic city

Articles: 1, 2

—-rl

Academic Resource Centre- Scarborough, Ontario

Posted in Built by Katelyn Beiter on December 6, 2012

scarborough  scarb2

Building: Academic Resource Centre
Location: Scarborough, Ontario
Completed: 2003
Architect: MacKay-Lyons Sweetapple Architects
Structural Engineer: Peter Sheffield & Associates Ltd.
Mechanical Engineer: Keen Engineering Co. Ltd
General Contractor: Walter Construction

AE Interest: exterior copper cladding, natural day lighting, exposed HVAC systems, organized based on idea of  boats being docked inside a grid, exposed steel framing

Articles: 1, 2, 3, 4

—-rl

Smith College Campus Center- Northampton, Massachusetts, U.S.

Posted in Built by Katelyn Beiter on December 6, 2012

smith1  smith2

Building: Smith College Campus Center
Location: Northampton, Massachusetts
Completed: 2003
Architect: Weiss/Manfredi Architects
Structural Engineer: Weidlinger Associates, Inc
MEP Engineer: Jaros, Baum, and Bolles Consulting Engineers
Civil Engineer: Fuss & O’Neill
Construction Manager: Daniel O’Connel’s Sons

AE intrest: White stained wood panel cladding, rainscreen made of wood, plywood, steel, and insulation, three separate buildings connected by a seismically safe bridge to the long, curved sky lit gallery, snowstorm protected skylight, serves as a pathway from street into campus

Articles: 1, 2, 3

—-rl

TV Asahi Headquarters- Tokyo, Japan

Posted in Built by Katelyn Beiter on December 6, 2012

tvashi3   tvashi2  tvashi4

Building: TV Asahi Headquarters
Location: Tokyo, Japan
Completed: 2003
Architect: Fumihiko Maki + Maki & Associates
Structural Engineer: Structural Design Group
Mechanical Engineer: Sogo Consultants
General Contractor: Takenaka Corporation

AE Interest: 90 ft high glass enclosed atrium, Glass Curtain Wall, 102,000 square feet floors, earthquake resistant reinforced concrete walls, walls tilted 3 degrees to prevent echos in studios, 396-foot-long Vierendeel truss, horizontal overhang for shading

Articles: 1, 2

The James H. Clark Center- Palo Alto, California, U.S.

Posted in Built by Katelyn Beiter on December 6, 2012

clark1 clark2

Building: The James H. Clark Center
Location: Palo Alto, California
Completed: 2003
Architect: Foster & Partners
Architect of record: MBT Architecture
Structural Engineer: Middlebrook & Louie
MEP Engineer: AlfraTech
Civil Engineer: Brian Kangas Faulk
General Contractor: Hathaway Dinwiddie

AE Interest: Glass Curtain Wall, external balconies are corridors, open, interactive laboratories, red-tiled canopies for solar shading, structural steel frame

Articles: 1, 2. 
—-

Renault Square Com – Boulogne-Billancourt, France

Posted in Built by Sarah Olson on December 5, 2012

 

Ren1Ren2

Building: Renault Square ComLocation: Boulogne-Billancourt, France
Completed: 2005
Architect: Jakob + MacFarlane
Structural Engineers: Setec

AE Interests: Originally a brick clad structure, rendered useless upon completion in 1984. Sat idle as a warehouse until it was transformed into the office communications center. Transformation from shed to public relations center without changing the structure, structural glass wall, glazed atrium.

Articles: [1]

 

 

Lufthansa Aviation Center–Frankfurt, Germany

Posted in Built by Xiuzhu Shao on December 5, 2012

Lufthansa Foto871_l

Building: Lufthansa Aviation Center
Location: Frankfurt, Germany
Completed: 2007
Architect: Ingenhoven Architects
Structural Engineer: Werner Sobek Ingenieure GmbH, Stuttgart
Project Management: Arcadis Homola GmbH & Co., Frankfurt

AE Interest: With energy conservation driving its design, the building utilizes double and triple-layered glass and advanced climate control tools, including one which regulates the building’s thermal mass in absorbing or releasing heat (hydronic loop system). The structure consists of 60-foot-spans of barrel-shaped steel, and consumes 335 kwH/sq ft in energy.

Articles: 1 , 2 , 3

Pontifical Lateran University–Rome, Italy

Posted in Built by Xiuzhu Shao on December 5, 2012

kr-07-448x450 pul-02-528x373

Building: Pontifical Lateran University
Location: Rome, Italy
Completed: 2007
Architect: King Roselli Architetti
Structural Engineer: Proges Engineering-Andrea and Pierfrancesco Imbrenda
General Contractor: C.P.C.- Technodir

AE Interest: Library addition to the university. Movement is invoked through a brick structure that mimics the appearance of a tower of books. Interior space is arranged according to the idea of shelves.

Articles: 1 , 2 , 3

Sam Fox School of Design and Visual Arts–St.Louis, Missouri, U.S.

Posted in Built by Xiuzhu Shao on December 5, 2012

p85_1p85_6

Building: Sam Fox School of Design and Visual Arts
Location: St. Louis, Missouri
Completed: 2006
Architect: Fumihiko Maki & Maki and Associates
Structural Engineer: Jacobs Facilities Inc.
MEP Engineer: General Planner/Shah Kawasaki Architects
General Contractor: McCarthy Construction

AE Interest: Limestone cladding and modernized aesthetics. The building is designed around a vaulted atrium and maximizes open space by concentrating all fixed core elements at the ends of the building.

Articles: 1 , 2 , 3

The Sage Gateshead – Gateshead, Tyne and Wear, England, U.K.

Posted in Built by Priscilla Nguyen on December 4, 2012

sage1  sage2

Building: The Sage Gateshead
Location: Gateshead, Tyne and Wear, England
Completed: 2004
Architect: Foster and Partners
Specialist Engineer: Buro Happold
Structural Engineer: Connell Mott MacDonald
Contractor: Laing O’Rourke

AE Interests: curved glass and stainless steel building with three performance spaces that are acoustically insulated from each other; acoustics were improved using concrete containing extra air bubbles; ceiling panels can be raised or lowered to manipulate the room’s sound profile; the three main performance halls (Hall One, Hall Two, and the Northern Rock Foundation Hall) are not contiguous and have gaps between the walls and ceilings

Articles: 1 2 3

Vacheron Constantin Headquarters & Factory – Geneva, Switzerland

Posted in Built by Priscilla Nguyen on December 4, 2012

vc1  21_Vacheron_Constantin

Building: Vacheron Constantin Headquarters & Factory
Location: Geneva, Switzerland
Completed: 2005
Architect: Bernard Tschumi Architects
Structural Engineer: ARUP (Matt King) and SGI
Mechanical and HVAC Engineer: ARUP (Nigel Tonks) and Enerconom
Construction Coordinator: Ortech

AE Interests: thin, flexible envelope concept; metallic sheet covering a concrete structure; wood veneer interior; direct northern lighting and filtered lighting from the south; naturally lit parking space; stairs, elevators, and three story atrium are made out of glass; composed of two wings with varying heights to meet functional needs

Articles: 1 2

Shure Technology Center – Niles, Illinois, U.S.

Posted in Built by Priscilla Nguyen on December 4, 2012

shureTechnology1 image_6

Building: Shure Technology Center
Location: Niles, Illinois
Completed: 2004
Architect: Krueck & Sexton Architects
Structural Engineer: Tylk Gustafson Reckers Wilson Andrews, Consulting Engineers
Mechanical Engineer: CCJM Engineers, Ltd.
Contractor: Harbour Contractors

AE Interests: silent, polished steel and glass elevators; exposed mechanical systems; high bay steel frame; natural light controlled by fixed louvers; steel panels; some rooms have acoustic isolation for microphone product testing; and occupants can control the amount of light and air in the room

Articles: 1 2 3

Porter Boathouse, University of Wisconsin – Madison, Wisconsin, U.S.

Posted in Built by Priscilla Nguyen on December 4, 2012

porter1 aerial_lakeshore_Crew05_0970

image03_6

Building: Porter Boathouse, University of Wisconsin
Location: Madison, Wisconsin
Completed: 2005
Design Architect: VJAA Architects
Architect of Record: KEE Architecture
Structural and Civil Engineer: Strand Associates, Inc.
Mechanical and Electrical Engineer: KJWW Engineering Consultants
Contractor: Miron Construction Co.

AE Interests: high ceiling space that accommodates for the vast amount equipment rowers use; two rowing tanks of water for use when lakes are frozen; poured concrete apron leads to Lake Mendota; roof is shaped like sails; naturally ventilated; and natural stone used on exterior walls

Articles: 1 2

Paul Klee Center – Bern, Switzerland

Posted in Built by Priscilla Nguyen on December 4, 2012

Building: Paul Klee Center
Location: Bern, Switzerland
Completed: 2005
Architect: Renzo Piano
Structural Engineer: Arup (Bob Lang)
MEP Engineer: Arup (Andrew Sedgewick)
Façade: Emmer Pfenninger
Acoustics: Müller BB

AE Interest: Bold curvilinear design; has studios for art education, a 300-seat auditorium for concerts, and a library; arches are made out of bent steel that dig into the earth; amount of natural light going into the building is controlled by exterior blinds; roof was soldered by hand

Articles: 1 2 
—-ea

Grande Bibliothèque – Montreal, Quebec

Posted in Built by Tania Vazquez on December 4, 2012

gbq-ext_06gbq_13

Building: Grande Bibliothèque
Location: Montreal, Quebec
Architect: Patkau/Croft Pelletier/Menkès Shooner Dagenais architectes associés)
Structural Engineer(s): Regroupement Nicolet Chartrand Knoll Limitée / Les Consultants Géniplus inc.
Area: 400,000 sq. ft.
Cost: $70 million
Completed: 2005

AE Interests: Complex program, efficient circulation, network of circulation at its core, cantilevered staircases with terrazzo treads, glass-fronted elevators, reinforced concrete structure.

Link: 1, 2

fall2012mwf

Morgan Library and Museum – New York City, New York, U.S.

Posted in Built by Tania Vazquez on December 4, 2012

Morgan1600morgan-library-2

Building: Morgan Library and Museum
Location: New York, New York, USA
Architect: Renzo Piano in collaboration with Beyer Blinder Belle Architects & Planners (BBB)
Structural Engineer(s): Robert Silman Associates
Area: 14,700 sq. ft.
Cost: $4.5 million
Completed: 2006

AE Interests: New glass and steel structures with existing architecture, renovation, preservation, new lighting.

Link: 1, 2, 3
—-

Palo Verde Branch Library and Maryvale Community Center – Phoenix, Arizona, U.S.

Posted in Built by Tania Vazquez on December 4, 2012

as

Building: Palo Verde Branch Library and Maryvale Community Center
Location: Phoenix, Arizona, USA
Architect: Gould Evans
Structural Engineer(s): Rudow and Berry
Civil Engineer: WRG Design
Area: 43,000 sq. ft.
Budget: $137 per sq. ft.
Completed: 2006

AE Interests: Environmental responsible, shared-used facility, open design, green principles, tight budget.

Link: 1, 2

fall2012mwf

Badajoz Congress Center – Badajoz, Spain

Posted in Built by Tania Vazquez on December 4, 2012

image01image03L1000113enviar

Building: Badajoz Congress Center
Location: Badajoz, Spain
Architect: Selgas Cano
Structural Engineer(s): Fehcor
Area: 15,000 meter square.
Completed: January 2006

AE Interests: Modern-expressionist, Assembly-conference, Circle, Extruded Curves, Fiberglass, Flat roof, Geode, Translucence.

Link: 1, 2

fall2012mwf

Kroon Hall – New Haven, Connecticut, U.S.

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2]

Building: Kroon Hall
Location: New Haven, Connecticut
Architect: Hopkins Architects (Great Britain) & Centerbrook Architects and Planners (Local, Connecticut)
Engineer: ARUP
AE Interests: LEED Platinum, passive/low energy systems, thermal mass, smart windows, geothermal heating/cooling (4, 1639 ft wells)
Completed: 2009

Links: [1]

VanDusen Botanical Gardens Visitor Centre – Vancouver, British Columbia, Canada

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2], [3]

Building: VanDusen Botanical Gardens Visitor Centre
Location: Vancouver, British Columbia, Canada
Architect: Perkins + Will
Engineer: Fast + Epp

Completed: 2011

AE Interests: unique/universal connections, complex wood framing, prefab, free form roof structure, low cost, fast build, panelized wood forms

Links: [1]

UK Pavilion Shanghai Expo – Shanghai, China

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2]
[Video Link]

Building: UK Pavilion Shanghai Expo
Location: Shanghai, China
Architect: Heatherwick Studio
MEP Consultant: Atelier Ten
Principal Contractor: Mace

AE Interests: building material use (60,000 transparent acrylic rods), unique illumination scheme, dynamic building movement, steel and timber composite structure, cantilever frames, natural ventilation, sustainable building design (local material usage/planned material recycling effort)

Links: [1]

AAMI Park Stadium – Melbourne, Victoria, Australia

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2]

Building: AAMI Park Stadium
Location: Melbourne, Victoria, Australia
Architect: Cox Architecture
Engineer: ARUP
AE Interests: highly efficient design, minimal material use (accomplished via optimizing structural elements for size and load), designed for future upgrade capability, roof permits only desirable sunlight to strike playing pitch

Links: [1]

Culture Yard in Elsinore – Elsinore, Denmark

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2]

Building: Culture Yard in Elsinore
Location: Elsinore, Denmark
Architect: Aart
Engineer: Soren Jensen Consulting Engineers
Completed: 10/10/2010 at 10:10
AE Interest: long span concrete beams, structural integration of new building with old, triangulated glass and steel structure, massive cantilevered 3-story structure

Links: [1]

2022 FIFA World Cup Qatar Showcase – Qatar

Posted in Built by Cody Lambert on December 4, 2012

Images: [1], [2], [3]

Building: 2022 FIFA World Cup Qatar Showcase
Location: Qatar
Architect: Arup
Engineer: Arup
AE Interest: carbon-neutral design, “world’s most sustainable stadium”, extremely fast design/build project, rotatable canopy roof aids with passive cooling/insulation, 100% of building energy use is from photovoltaic solar cells that respond and adjust to the sun’s path

Links: [1]

The National Art Center–Tokyo,Japan

Posted in Built by Xiuzhu Shao on December 3, 2012

NAC2NAC

Building: The National Art Center
Location: Tokyo, Japan
Completed: 2007
Architect: Kisho Kurokawa Architect & Associates
Structural Engineering: Nihon Sekkei Inc. Susumu Nakagawa
Mechanical Engineer: Nihon Sekkei, Inc. Kunio Tani

AE Interest: Strong geometry comprised of two inverted cones; usable floor area maximized

Articles: 1 , 2 , 3

—-ad

21_21 Design Sight—Tokyo, Japan

Posted in Built by Xiuzhu Shao on December 3, 2012

21_2121_21_2

Building: 21_21 Design Sight
Location: Tokyo, Japan
Completed: 2007
Architect: Tadao Ando Architect & Associates + Nikken Sekkei
Structural Engineer: Nikken Sekkei
Mechanical Engineer: Nikken Sekkei
Main Contractor: Takanaka Corporation + Taisei Corporation

AE Interest: The structure consists of two trapezoidal buildings which form a triangular figure. The structure is designed for fluidity through large, folded-steel roofs that taper towards the ground. This building is part of the Tokyo Midtown project, which aimed to channel the timeless elegance of Manhattan real estate.

Articles: 1 , 2 , 3 , 4

,,,,ad

Rice University Turrell Installation – Houston, Texas, U.S.

Posted in Built by Gregory Brooks on December 3, 2012


(image source)

Building: Turrell’s skyspace installation: ‘Twilight Epiphany’
Location: Rice University, Houston, Texas 77006
Artist: James Turrell
Technical Architect: Thomas Phifer and Partners

Images and drawings: See Architectural Record online article

AE Interest: 118 foot square floating roof on slender columns, architectural concept of sky-viewing space

Travel:H
—-

Rice University Brochstein Pavilion – Houston, Texas, U.S.

Posted in Built by Gregory Brooks on December 2, 2012

Picture 16 Picture 17

Building: Rice University Brochstein Pavilion
Location: Rice University, Houston, Texas
Map
Architect: Thomas Phifer & Partners
Landscape Architect: The Office of James Burnett
Civil Engineering: Walter P. Moore
Structural Engineering: Haynes Whaley Associates
MEP Engineering: Altieri Sebor Wieber
Lighting Design: Fisher Marantz Stone
Glazing Contractor: Haley-Greer
Construction: Linbeck
Project Year: 2006-2007
Construction Year: 2007-2008
Constructed Area: 557.5 sqm
Photographs: OJB, Paul Hester & Scott Frances

AE Interest: Expressed slender structure, daylight roof monitors, steel and aluminum trellis.
TSA article

Travel:H
—-

The Menil Collection – Houston, Texas, U.S. `

Posted in Built by Mike Renteria on November 30, 2012

2013_aia_twenty-five_year_award-01  3a536c5d91e0cb00b1574feb30a83036f944ab8b  menil-collection
1,2

Building: The Menil Collection
Location: 1533 Sul Ross Street, Houston, Texas 77006
Architect: Renzo Piano
Structural Engineer: Arup
Images: Renzo Piano Building Workshop (RPBW)
Completion 1986

AE Interests: The building’s roof has an innovative design that allows for natural interior lighting – a roof of concrete “leaves” controls the entry of light into the building.  `

Travel:H
—-ea

Rice University East Servery – Houston, Texas, U.S.

Posted in Built by Gregory Brooks on November 28, 2012

Building: Rice University East Servery
City: Houston, Texas
Architect: Hopkins Architects
Structural Engineer: Architectural Engineers Collaborative
Construction: Tellepsen Builders
Completed: December 2010

AE Interests: Expressed steel structure, very transparent building, 3-dimensional exposed custom trusses, custom steel connections and custom steel shape column details. Aluminum exterior louver system (shading structure) with steel vertical supports integrated with building structure.

Travel:H
—-

Byzantine Fresco Chapel Museum – Houston, Texas, U.S.

Posted in Built by Gregory Brooks on November 20, 2012


Building: Byzantine Fresco Chapel Museum
Location: Houston, Texas
(part of The Menil Collection, a neighborhood of museums)
Completed: 1997, fresco returned to Cyprus in February, 2012.
Architect: Francois de Menil
Engineer: Arup

—-

CY Twombly Pavilion – Houston, Texas, U.S.

Posted in Built by Alec Gagnon on November 18, 2012

Building: CY Twombly Pavilion
(part of The Menil Collection – a neighborhood of museum buildings)

Location: 1501 Branard Street, Houston, Texas 77006
Architect: Renzo Piano Building Workshop
Structural: Arup and Haynes Whaley Associates
Completed 1995

AE Interests: daylighting, natural lighting, mechanical louvers, stretched cotton fabric

Travel:H
—-

Vietinbank Towers – Vietnam

Posted in Under Construction by Christopher Lawrence on November 6, 2012

Building: Vietinbank Towers
Location: Hanoi, Vietnam
Completion: 2015 (expected)
Structural Engineers: Halvorson & Partners
Mechanical Engineers: David Stillman Associates
Local Consultants: Vinaconex R+D
Project Management: Turner International
Architect: Foster & Partners

AE Interests: This 3,229,172 square foot mixed-use development will consist of 68- and 48-story towers to be joined by a seven-level podium. The project incorporates numerous high-impact sustainable design methodologies and technology. A combined heat and power plant will supply domestic hot and heating water supplied by waste heat from the CHP. Similarly, the tower will incorporate groundwater cooling, groundwater and rainwater recycling, desiccant dehumidification and an integrated daylighting system as well as an innovative “green spine” concept uses water features, plantings and recycled dehumidified air to cool and improve the air quality in the atria and podium spaces.

Flower Dome and Cloud Forest – Singapore

Posted in Built by Morgan Allford on October 16, 2012

   
1, 2, 3

Building: Flower Dome and Cloud Forest (Garden By the Bay’s Cooled Conservatories)
Completion: 2012
Location: Singapore
Architect: Wilkinson Eyre Architects

Structure Engineer: Atelier One
Service and Environmental Engineer: Atelier Ten
Lighting design: Lighting Planners Associates
Landscape Architects: Grant Associates
Irrigation design: WET (Water Equipment Technology)

AE Interests: Largest climate-controlled greenhouses in the world, largest man-made waterfall in the world, Cool dry (Mediterranean)/Cool dry (Mountainous) biomes, fragile glass grid shell to allow for maximum lighting, radial steel arches to take any external forces, low-e glazing to minimize solar gain, computer controlled shading, carbon neutral cooling system, Combined Heat Power (CHP) Biomass Steam Turbine `

Articles: [1, 2, 3, 4, 5, 6]
Website: [1, 2]
Video: [1]

Perot Museum of Nature and Science – Dallas, Texas, U.S.

Posted in Proposed Design, Under Construction by Gregory Brooks on October 14, 2012

Dallas-Perot-Museum-of-Nature-and-Science.2  _MG_1244_crop-l  
1,2,3

Building: Perot Museum of Nature and Science
Address: 2201 N Field Street, Dallas, TX 75201
Architect: Morphosis

Architect of Record (Dallas): Good, Fulton and Farrell
Preliminary Design Engineer: Buro Happold
Structural Engineer:  Datum Engineers
Consulting Structural Engineer: John A. Martin & Associates
Mechanical Engineer: Buro Happold
Landscape Architect: Talley Associates
Contractor: Balfour Beatty Construction
Project Manager: Hillwood
Cost Consultant: Davis Langdon
Completed 2013

AE Interests: Complex form, custom concrete facade created directly from digital model information, green roof. `

MORE ABOUT this building.
article/slideshow Jan 9, 2013 Architectural Record online

UT tour Dallas
—-ea

The Broad – Los Angeles, California, U.S.

Posted in Under Construction by Gregory Brooks on October 6, 2012

    bAir
Image Source: 1, 2, 3

Building: The Broad (museum of contemporary art)
Location: Los Angeles, California
Design Architect: Diller, Scofidio + Renfro
Architect of Record: Gensler
Structural Engineer: Leslie E. Robertson Assoc.
Construction: MATT Construction
Parking Structure: IDGParkitects
‘Veil’ facade fabricator: Seele

AE Interest: Concept: “The Vault and the Veil” (DS+R), daylighting, complex honey-comb facade (glass fiber reinforced concrete), complex concrete floor structure.

Note: “MATT is building the project utilizing sophisticated 3D modeling software (CATIA), managed through Gehry Technologies’ Digital Project.”

Articles: 1, 2,
Video: 1,
….

Walt Disney Concert Hall- Los Angeles, California, U.S.

Posted in Built by Matt McCarthy on October 5, 2012

    
Image Source: 1, 2, 3

Building: Walt Disney Concert Hall
Address: 111 S Grand Avenue, Los Angeles, CA 90012
Architect: Frank Gehry
Structure and Facade Design: Frank O. Gehry & Partners
Structural Engineer: John A. Martin & Associates, Inc.
Chief Acoustician: Yasuhisa Toyota
MEP: Cosentini Associates
Completed 2003

AE Interests: Complex geometry, state-of-the-art acoustical concert hall, stainless steel facade.

Articles: 1, 2 (Catia), 3 (W),
Edited Oct2012 by GB.
—-ea

CJ Only One Center – South Korea

Posted in Built by Hannah James on October 5, 2012

  

Building: CJ Only One Center – South Korea
Location: Seoul, South Korea
Project Lead: Cannon Design
Client:  CJ Corporation
Size: 1.2 Million square feet
Facilities: Offices, café bar, gymnasium, childcare, meeting rooms, data centers, and laboratory spaces
Design Concepts: Research and development facilities in three high-rise towers arranged around a dynamic central atrium to increase collaboration. Shading ribbons respond to solar exposure to alter the internal heat production.

AE Interests: Multipurpose, Solar Shading, Perforated Metal Envelope, Energy Efficiency, Curvilinear

Article & Images: Design Concepts, Responsive Envelope

Video of Architectural Visualization

Banner MD Anderson Center – Phoenix, AZ, U.S.

Posted in Built by Hannah James on October 2, 2012

Building: Banner MD Anderson Cancer Center

Location: Phoenix Arizona – Banner Gateway Medical Campus
Client:  Banner Health
Architect, Structural, MEP & Interior: Cannon Design
General Contractor: DPR Construction
Civil Engineer: EPS
Size: 131,000 square feet
Cost: 109 Million Dollars
Facilities: Clincs, Radiation Treatment, Imaging, Support Services
Design Concepts: Improve patient comfort with natural light, water features, colored light design and nature views. The Lantern of Hope is an open air entry to the building that is illuminated at light with LEDs.

AE Interests: Healthcare Design, Solar Shading, Natural Light sources, Aluminum perforated tower, Local Masonry, Pre-Assembled Water-Jet cut Panels

Article & Images:Construction Design Concepts

Linde + Robinson Laboratory for Global Environmental Science – Pasadena, CA, U.S.

Posted in Built by Hannah James on October 2, 2012

Building: Linde + Robinson Laboratory for Global Environmental Science
Location: Pasadena, CA
Architect: Architectural Resources Group, Inc.
Landscape Architect: Kornrandolph
Contractor: Del Amo Construction, Inc.
Restoration Contractor: Spectra Company
Structural Engineer: John A. Martin & Associates, Inc.
Mechanical Engineer: Integral Group
Electrical Engineer: IDeAs (Integrated Design Associates, Inc.)
Civil Engineer: VCA Engineers, Inc.
Laboratory Planner: Cannon Design – Copenhagen
LEED Consultant: Davis Langdon, an AECOM Company
Client:  California Institute of Technology
Uses: Laboratory and Office
Technology & Techniques: Renovated Astronomy coelostat for storm water retention, cooling tower storage, and entrance for daylight to all floors. Uses the eVap 1500 invented by Cannon Design Products group to reduce power load consumption by the laboratory equipment. Hydrogen fuel cells for main and back up power.

AE Interests: LEED Platinum, Historic Preservation, Laboratory Design, HVAC Design, Optics

Articles: Technical Design , Restoration & History
Images: Cannon, Del Amo

Miho Chapel – Shigaraki, Japan

Posted in Built by Johnathan Duong on October 2, 2012

[1]      [2]

[3]

Building:  Miho Chapel
Location:  Shirgaraki, Japan
Status:  Completed in 2012
Architect:  IM Pei
Structural Engineer:  Leslie E. Robertson Associates

AE Interest:  simplistic design, raindrop shaped, very natural feel, mainly dependent on natural light, steel on the exterior and wood on the interior, very curvilinear.

Fall2012

,,,,ad

Tadawul – Saudi Stock Exchange – Riyadh, Saudi Arabia

Posted in Built by David Lukert on October 2, 2012

Building: Saudi Stock Exchange
Location: Riyadh, Saudi Arabia
Status: Completed 2009
Architect: Rogers Stirk Harbour + Partners
Structural Engineer: Buro Happold
Service Engineer: Buro Happold
Environmental Service Engineer: Buro Happold
Landscape Architect: Gillespies

AE Interset: Protective outer layer that shades the building from extreme heat in Riyadh, structural components on exterior of building to save space in the interior

Medical Education Building, Columbia University – New York, New York, U.S.

Posted in Proposed Design by Johnathan Duong on October 2, 2012

[1]

[2]

Building:  Medical Education Building
Location: New York City, New York
Completed: 2016
Architect:  Diller Scofidio + Renfro
Structural Engineer:  Leslie E. Robertson Associates

AE Interest:  Angular in shape, mainly glass facade, timber-clad boxes slotted into the glass facade will provide decked balconies, floors intertwine with one another, a network of social and study spaces distributed across oversized landings along an intricate 14-story stair.

Pocono Medical Center – East Stroudsburg, PA

Posted in Built by Johnathan Duong on October 1, 2012

[1]     [2]

Building:  Pocono Medical Center
Location:  East Stroudsburg, PA
Status:  Completed in 2012
Architect:  EwingCole Architects

AE Interest:  focus on nature, glass facade, rectilinear in shape, skywalk footbridge made of steel trusses connects the center to the main hospital, healing garden extends into indoors into the lobby.

Fall2012

Dee & Charles Wyly Theatre – Dallas, Texas, U.S.

Posted in Built by Cristina Calderon on October 1, 2012

8417d61e0  wylystructuredp-444x5502  IMG_8569
1,2,3

Building: Dee & Charles Wyly Theater
Location: 2401 Flora Street, Dallas, TX 75201
Architect: Rem Koolhaas of OMA and Joshua Prince-Ramus of REX (OMA NY)
Architect of Record: Kendall/Heaton Associates, Inc.
Structural Engineer: (MKA) Magnusson Klemencic Associates
General Construction: McCarthy
Mechanical Engineers: Cosentini Associates and Transsolar
Completed 2009

AE Interest: Motorized system to raise/lower seating and floor system for varied theatre arrangements. Ground level opens up on 3-sides to outside plaza, Wyly-green color at all hazard areas creates color motif for building. High-strength concrete angled columns create open corner of building, extruded aluminum “curtain” on exterior.  

Joshua Prince-Ramus lecture, Dallas (TEDx)
6:00 – start of Wyly presentation
16:40 – timelapse reconfig. of stage

Project Team

UT tour Dallas
—-ea