Wetland Museum – Zhangjiakou, China
Name: Wetland Museum
Location: Zhangjiakou, China
Architectural Firm: Tenio Architecture and Engineering Co.,Ltd.
Architects: Jun Ren, Nan Jiang, Yingjun Fu, Runbo Guo, Ran Chen, Yang Di
Structural Design :Zhiyong Wang & Lesa Meng
Equipment Engineering: Bing Liu, Jian Chen, Hui Yang
Curtain Wall Design: Gasun Construction Group
Client: Huailai Forestry Bureau
Construction Year: 2019
Area: 90911.99 sqft(8446 sqm)
AE Interests: low-energy building design, annular floating strategy, self-cycling equipment, prefabrication
3D Printed School – Fianarantsoa, Madagascar
Name: 3D Printed School
Location: Fianarantsoa, Madagascar
Architectural Firm: Studio Mortazavi
Architect: Amir Mortazavi
3D Printing: Hyperion Robotics
Client: Thinking Huts
Construction Year: Currently under construction
AE Interests: constructed from 3D printed concrete aggregate, modular design, vertical farms, solar power
Video: [1]
,,,,
Shanghai Astronomy Museum – Shanghai, China
Name: Shanghai Astronomy Museum
Location: Shanghai, China
Address: Huanshan Rd, Songjiang District, Shanghai, China
Architect: Ennead Architects
Structural Engineer: LERA
Client: Shanghai Science and Technology Museum
Completion: 2021
Area: 39,000 mยฒ
AE Interest: The concept and design was inspired from the experience of orbital motion between the 3 bodies of the structure. The structure allows for visitors to visualize the path of the sun on the ground through opening from the roof.
Article: [1]
Serpentine Pavilion 2021 – London, United Kingdom
Name: Serpentine Pavilion 2021
Location: London, United Kingdom (Temporary work)
Architectural Firm: Counterspace
Architect: Sumayya Vally
Project Directors: Hans Ulrich Obrist & Bettina Korek
Project Leader: Julie Burnell
Project Curator: Natalia Grabowska
K-Briq developer: Kenoteq
Construction Year: 2021
AE Interests: Built using K-Briq modules, K-Briq has the highest recycled content of any brick currently available, K-Briq looks like a normal brick but offers better insulation properties, made of reclaimed steel, cork, and timber covered with micro cement
Video: [1]
LAP Marina Residence – Cotonou, Benin

Name: LAP Marina Residence
Location: Cotonou, Benin
Architects:ย Atelier(s) Alfonso Femia,ย Peia Associati
Structural Engineering: Stefano Migliaro
Services Engineering: AI Studio, AI Engineering
Housing Area: 367,000 sqft (34,100 sqm)
Green Area: 473,000 sqft(44.000 sqm)
AE Interests: luxury compound of modern villas, full residential services, reinterpretation of the African identity, continuous walls provide privacy, 180 parks
.
Paleo Park – Bale, Croatia
Name: Paleo Park
Location: Bale, Croatia
Architect: NFO
Manufacturers:ย Conty,ย Eltor
Construction:ย IF Projekt
HVAC:ย Termoprojekting
Contractor:ย Plima
Electrical Installation: K-TIM
Landscape Design: Boris Gerenฤeviฤ
Area: 172,000 sqft (16,000 sqm)
AE Interests: dinosaur themed water park and an educational research center, dinosaur shaped water content, life size dinosaur sculpture, dinosaur fossil exhibition, emphasis on preserving native vegetation
Video [1]
.
Meixi Urban Helix – Changsha, China
Name: Meixi Urban Helix
Location: Changsha, Hunan, China
Architect: KSP
Structural Engineer: Weiske + Partner
Lighting Design: OVI
Completion: March, 2017
Height: 30 m
Area: 20,000 mยฒ
Spiral Length: 1 kilometer
AE Interest: The curved ramps are made of hollowed steel-beams resting on 40 cm thick columns. The flat and flexible design of diagonal brazing between supports help minimize the stress.
Article: [1]
Videos: [1]
RCC Headquarters – Yekaterinburg, Russia
Name: RCC Headquarters
Location: Yekaterinburg, Russia
Client: Russian Copper Company (RCC)
Architect: Foster + Partners
Structural Engineer: Foster + Partners
Acoustic Engineer: Sandy Brown Associates
Facade: Priedemann Faรงade Experts
Lighting: Jason Bruges Studio
Landscape consultant: Hyland Edgar Driver
Client: Russian Copper Company (RCC)
Completion: 2021
Height: 213ft / 65m
Size: 18450 mยฒ
Floors: 15
AE Interest: The facade design along with the balance between solid and glazing areas is a response to the range of temperatures Yekaterinburg, Russia receives. The glazing reacts to low levels of sun during the winter while the solid mitigates the directs sunlight during the summer.
Video: [1]
Amphibious House – United Kingdom
Name: Amphibious House
Location: United Kingdom
Architectural firm: Baca Architects
Structural Engineer: Techniker
Hydrological Engineer: HR Wallingfords
Main Contractor: Creative Interior Construction
Size 2421.88 sq ft(225 sq m)
Construction year: 2014
AE Interests: whenever a flood occurs, the entire building rises in the dock and floats, can rise up to 2.5 meters, pipes are flexible so that they may extend in the case of flooding, it has a low center of gravity which is achieved through its concrete basement
Video: [1]
,,,,
San Francisco Int’l Air Traffic Control Tower – San Francisco, California
Name: San Francisco International Airportโs (SFO) airport traffic control tower
Location: San Francisco, California
Address: 334 Domestic Terminals Departures Level, San Francisco, CA 94128
Design Architecture: HNTB
Design Build Architect: Fentress Architects
Structural Engineering: Walter P Moore
Fabricator: Keith Panel Systems Co. Ltd.
Installer: Pacific Erectors
General Contractor: Hensel Phelps Construction Co.
Panel Systems: KPS
Client: Federal Aviation Administration and San Francisco International Airport
Completion: August 2015
Height: 231ft
AE Interest: Tallest Control tower utilizing vertical post-tensioning. Designed to withstand a 8.0 magnitude earthquake. The tower’s lighting changes color with LED lights.
Video: [1]
The Chapel of St. Ignatius and the Gayle and Tom Benson Jesuit Center – New Orleans , Louisiana
Name: The Chapel of St. Ignatius and the Gayle and Tom Benson Jesuit Center
Location: New Orleans, Louisiana
Address: 6363 St Charles Ave, New Orleans, LA 70118
Architect: Trahan Architects
Civil Engineers: Morphy Makofsky Inc
Acoustic: Threshold
Visualization Studio: Eleven
Land Surveyors: Gandolfo Kuhn
Project & Cost Management: Cost + Plus
Completion: 2022
AE Interest: Diffuse natural lighting will “wash” the space within the Chapel walls to evoke calmness and warmth. This was design was inspired to create a connection with the sky and heavens.
ATES Wind Power Headquarters – Izmir, Turkey
Name: ATES Wind Power Headquarters
Location: Izmir, Turkey
Address: Izmir-Canakkale Yolu 83.Km Atkiran Mevkii No:21, Bergama/ฤฐzmir, Turkey
Architect: d.a.architects
Manufacturers: Spectral, VitrA, AGT SOFT TOUCH, U GLASS FACADE
Founder & Principal Architect : Durmus Ali Kasap
Landscape Architect : Nesil Peyzaj
Area: 2806 mยฒ
Year: 2019
Construction Time: 8 years
AE Interests: main emphasis on employ comfort, indoor recreational “breaks” to increase social interactions, natural ventilation and light, inner gardens, suspended bridges intertwined with vegetation
.
.
.
Queen Alia International Airport – Amman, Jordan
Name: Queen Alia International Airport
Location: Amman, Jordan
Address: Alpha Building, 2nd Floorโ ุนู
ูุงูุ 39052, Jordan
Architecture Firm: Foster + Partners
Landscape Architect: Dar Al-Handasah
Structural Engineer: Buro Happold
Electrical Engineer: World of Lights
Acoustics: Rahe Kraft & Sandy Brown
Size: 124,861.36 sq ft (116,000 sq m)
Completed: 2012
Award: Cityscape Architectural Review Awards โ Winner Transport category
AE Interests: modular design, the entire structure is made from concrete for environmental control, the roof is composed of a series of domes, some prefabricated elements
,,,,
Xiake Island Eco City Exhibition Center – Wuxi, China
Name: Xiake Island Eco City Exhibition Center
Location: Wuxi, China
Address: Xia Ke Lu, Jiangyin Shi, Wuxi Shi, Jiangsu Sheng, China
Architect: Shuishi
Client: China Jinmao & Dreameast
Size: 2800 sm
Completion: 2020
AE Interest: Glass fiber Reinforced Concrete used at the lower part to perfectly wrap the lower structure. Elevated lower level opens up space for people to walk through the park area freely.
Article: [1]
Startup Lions ICT Campus – Turkana County, Kenya
Project: Startup Lions ICT Campus
Location: Turkana County (near Lake Turkana) Kenya
Architect: Kere Architecture
Engineering and Construction: BuildX Studio
Client: Learning Lions gUG
Size: 12,242 sf (1,416 sm)
Completed: April 2021
AE Interests: Naturally ventilated spaces via solar chimneys (inspired by termite mounds) and windows at lower levels. information and communication technologies (ICT) campus.
Articles: [ 1, 2, ]
Solar chimneys: [ 1 ]
.
Maraya Concert Hall – Al-Ula, Saudi Arabia
Name: Maraya Concert Hall
Location: Al-Ula, Saudi Arabia
Address: Maraya, Al-Ula, Saudi Arabia
Architectural Firm: Gio Forma
Engineering Firm: Black Engineering
Client: RCU royal commission ALULA
Size: 5381.96 sq ft (500 sq m)
Year of Completion: 2018
Award: 2020 AIA Award
AE Interests: Guinness World Record holder for largest mirrored building in the world, completed in only two-and-a-half months, panels are made from UltraMirror, UltraMirror is designed to withstand corrosion and be resistant to chemicals and clouding
Video: [1]
,,,,
Carturesti Carousel – Bucharest, Romania



Name: Carturesti Carousel
Location: Bucharest, Romania
Address: Strada Lipscani 55, Bucureศti 030033, Romania
Architects: Square One
Area: 1000 mยฒ
Restoration: Capitel Avangarde
Structure: Pop & Associates
Architects In Charge: Adrian Cancer-Zeana, Sabin Dumitriu
AE Interests: pieces of recent restoration kept visible as an expression of the buildingโs continuous metamorphosis, organic fluid form, arrangement of lights calculated to fulfill the illumination needs of various products, railing composed of equally spaced metal rods
.
Q2 Stadium – Austin, Texas
Name: Q2 Stadium
Location: Austin, Texas
Address: 10414 Mc Kalla Pl, Austin, TX 78758
Architect: Gensler
Structural Engineer: Walter P Moore
Construction: Austin Commercial
Year of Completion: 2021
AE Interest: Such precaution was taken into consideration due to climate issues MLS teams have had in Dallas and Houston from Texas weather. Because of this, the stadium was designed with opening and oriented in such a way that natural breezes can blow through the venue. Unique construction methods had to be thought of to support the “second largest roof in MLS”. One of the methods were making the roof a cable supported structure which also allowed the ability to stay under budget due to the use of less steel. Built in 7 months the metal roof structure was also designed to amplify the noise back to the fans during loud games.
Articles: [1]
Video: [1]
CapitaGreen – Singapore, Singapore
Name: CapitaGreen
Location: Singapore, Singapore
Address: 138 Market Street, Singapore, Singapore, 048946
Design Architect: Toyo Ito & Associates
Architect of Record: RSP Architects Planners & Engineers (Pte) Ltd
Structural & MEP Engineer: Takenaka Corporation
Client: CapitaLand
Area: 699,654.18 sq ft(65,000 sq m)
Height 803.806 ft(245 m)
Year of Completion: 2014
Award: Platinum Greenmark Rating, Universal Design Mark GoldPlus, Best Tall Building Award for Asia & Australasia Region
AE Interests: A double skin faรงade with floor-to-ceiling glazing helps to reduce solar heat gain by 26%, 55% of the faรงade is covered with living plants, rainwater harvesting is used to irrigate the plants, has sky terraces, uses novel, high-strength concrete to support the structure and reduce the overall quantity of material needed, the flora-inspired structure on the top of the CapitaGreen draws in fresh, cool air which will be distributed to the lower floors
Video: [1]
,,,,
Rancho Mirage – Coachella Valley, California

[ 1 ]
Location: Rancho Mirage (Coachella Valley) near Palm Springs, California
Developer: The Palari Group
Printing / Construction : Mighty Buildings
Systems controls: Delos (DARWIN Home Wellness Intelligence)
Size: 15 homes, 1,450sf each. Total land use – 5 acres.
Starting price: $595,000 per home.
Construction beginning: 2021 (1.5 to 2 years expected to completion)
AE Interest: First 3D printed community in U.S., zero-net energy homes, prefabricated units in factory setting eliminates 99% of construction waste and 95% fewer hours of labor, solar panels on roofs, smooth finished walls. “Lego” type assembly of components.
Articles: [ 1, 2, 3 ]
Video: [ 1 ]
.
Za’abeel 1 – Dubai, United Arab Emirates
Name: Za’abeel 1
Location: Dubai, United Arab Emirates
Architectural Firm: Nikken Sekkei
Developer:ย Ithra Dubai
Main contractor:ย ALEC Engineering and Contracting LLC
MEP Engineer: WSP Global
Structural Engineer: WSP Global
Area: 10 sqkm
Height: 998 ft (304 m)
Schedules Completion: late 2021
AE Interests: positioned between the old and new business district, towers linked 410 ft(125 m) above ground by world’s largest cantilever – 738 ft (225 m), deepest basements in the Middle East, focus on water and energy efficiency, 69 floors in the taller tower and 59 in the shorter one `
.
SkyVille – Singapore, Singapore
Name: SkyVille
Location: Singapore, Singapore
Address: 86 Dawson Rd, Singapore 141086
Architectural Firm: WOHA
Civil & Structural Engineer: BECA Carter Hollings & Ferner
Mechanical & Electrical Engineer: Davis Langdon KPK
Main Contractor: Hor Kew Private Limited
Area: 316,372.85 sq.ft (29,392 sq.m)
Year of Completion: 2015
Award: Platinum Greenmark Rating
AE Interests: Sustainable Architecture, equipped with a solar power system on rooftop, utilizes daylighting, has a prefabricated design, jogging track is illuminated with a photovoltaic array(solar power), bordered by bioswale(ditches that collect, convey, and filter rainwater), SkyVille is naturally ventilated.
Video: [1]
,,,,
Hilton Palacio Del Rio – San Antonio, TX
Name: Hilton Palacio Del Rio
Location: San Antonio, TX
Address: 200 S Alamo St, San Antonio, TX 78205
Architecture: Cerna & Garza Architects
Construction: Zachry Construction
Building Size: 230 ft
Year Completed: 1968
AE Interest: The Entire Project only took 202 working days due to its special technique of stacking prebuilt rooms. The rooms were being built at a near by site 7 miles away. The workers became so efficient due to the repetition, they were able to stack 17 rooms per day by crane.
Videos: [1]
6 X Guadalupe – Austin, Texas
Name: 6 X Guadalupe
Location: Austin, TX
Address: 400 W. 6th St | Austin, TX 78701
Architecture: Gensler
Construction: JE Dunn Construction
MEP Engineering: WYLIE Consulting Engineers
Civil Engineers: LJA Engineers
Commercial Developer: Lincoln Property Company
Residential Developers: Kairoi Residential
Landscape Design: Nudge Design
Building Exterior Lighting: Cline Bettridge Berstein (CBB) Lighting Design
Facade: Gensler (with help from Curtainwall Design Consulting (CDC))
Height: 840 ft
Floors: 66
AE Interest: Will be the tallest building in Austin upon completion.
Videos: [1]
Hotel Atra Doftana – Tesila, Romania
Name: Hotel Atra Doftana
Location: Tesila, Romania
Address: Fundฤtura Cerbului 780B, Teศila 107640, Romania
Architects: TECON Architects
Year of Completion: 2011
Site Area: 32,292 sqft (3,000 sqm)
AE Interests: leaves the nature untouched, exterior skin mainly covered in ground except glass surface, 2 underground volumes separated by function, site-specific materials, solar panels provide energy
Lo Barnechea City Hall – Lo Barnechea, Chile
Name: Lo Barnechea City Hall
Location: Lo Barnechea, Chile
Address: El Rodeo 12777, Lo Barnechea, Regiรณn Metropolitana, Chile
Completion Date: 2017
Architecture: Gonzalo Mardones V Arquitectos
Civil Engineering: Ruiz y Saavedra
Constructors: Proyekta
Building Size: 15,921 m2
AE interest: As can be examined in picture 3, Lo Barnechea City Hall is “entirely solved in a reinforced concrete structure.” The concrete is “whitewashed” due to an elements called “incorporated titanium dioxide” which gives its current color.
EcoArk Pavillion – Taipei, Taiwan

Name: EcoArk Pavillion
Location: Taipei, Taiwan
Architect and Structural Engineer: Arthur Huang
Architectural Firm: Miniwiz Sustainable Energy Development Ltd
Client: Taipei Expo Park
Size: 345,600 sq.ft (six football fields)
Year of Completion: 2010
Award: The Earth Award 2010 Product Category
AE Interests: The EcoArk is the first fully functional and public structure made of Polli-Brick, is a steel structure covered with Polli-Brick panels, uses Miniwiz’s Polli-Brick Cladding System, it is estimated that the Polli-Brick assembly costs 1/4 of conventional systems, weighs 50% less than a conventional building, Polli-Brick Panels have an insulation value of R-12, 1.5 million recycled PET (Polyethylene Terephthalate) bottles were used in the creation of the panels, low carbon footprint, designed to be disassembled and reassembled, utilizes water collected from rainstorms with an exterior waterfall
….
Serpentine Sackler Gallery Extention – London, U.K.
Building: Serpentine Sackler Gallery Extension
(currently called the Magazine restaurant)
Location: London, U.K. in Kensington Gardens
Architect: Zaha Hadid Architects
Structural, MEP, Fire engineering: Arup
Lighting: Isometrix
Project Management: Rise
Completed: November 2013
AE Interest: Glass-fibre woven membrane roof, complex form. “Instead of using perimeter columns, the edge beam โ a twisted ladder truss supported on three points โ dips down to the supporting ground in front, in the back, and on the free west side…” [1]. Cantilevered, frame-less glass walls.
^
.
Hotel Mercure – Bucharest, Romania

Name: Hotel Mercure
Location: Bucharest, Romania
Address: 17A, Strada George Enescu Street, Bucureศti 010302, Romania
Architect: Arhi Group
Structural Design: Zagaican Birou de Structuri
Mep Design: MC General Construct
General Contractor: Conarg
MEP Contractor: Modulex Group
Area: 69,965 sqft (6500 sqm)
Year of Completion: 2015
AE Interests: reinterprets traditional Romanian architectural elements , main facade features a graphical collage of cultural symbols, CNC perforated panels create depth
Articles [1]
.
Tianjin Juilliard School – Binhai, China
Name: Tianjin Juilliard School
Location: Binhai, China
Address: Yujiapu Financial District, Binhai, Tianjin, China
Architecture: Diller Scofidio + Renfro
Contractor: MCC Tiangong Group Co. Ltd.
Structural Engineers: ARUP
Completion: October 2020
Size: 350,000 ft2
AE interest: The structure has “four faceted pavilions housing a 690 seat concert hall, a 299 seat recital hall, a 225- seat black box theater.” There are five glass bridges inside that span over a interior public space as seen in image 2.
Video: [1]
3D Printed Urban Cabin – Amsterdam, The Netherlands
Name: 3D Printed Urban Cabin
Location: Amsterdam, The Netherlands
Architect: DUS Architects
Contractor: Aectual
3D Printing: Aectual
Print Material Development: Henkel & Aectual
Size: 86.111 sq.ft.(8 sq.m.)
Year of Completion: 2015
AE Interests: Structural Optimization, Smart solutions for insulation and material consumption, is made out of a biodegradable plastic material that can be shredded and reused
….
Digital Museum – Pecica, Romania

Name: Digital Museum Pecica
Location: Pecica, Arad, Romania
Address: Strada 339, Pecica 317235, Romania
Architect: Claudiu Ionescu
Engineers: G. Takacs, C. Sebarchievici
Construction: S.C. START S.R.L.
Area: 1,356 sqft (126 sqm)
Year of Completion: 2013
Cost: $160,500
AE Interests: N-S orientation of the building forms a sundial, rises naturally from the ground through Fibonacci spirals, reinforced concrete walls, aluminum bonded facade, water is collected and recycled via the roof and surrounding courtyards, energy provided by solar panels
Note: Inside visitors can explore ANY museum in the world through the use of the latest technology in 3D video projections and 3D screens. The museum can host any presentation or exhibition without a large space, a big surveillance staff or substantial maintenance costs.
.
Budapest Museum of Ethnography – Budapest, Hungary
Name: Budapest Museum of Ethnography
Location: Budapest, Hungary
Address: Budapest, Kossuth Lajos tรฉr 12, 1055 Hungary
Architect: Napur Architect Ltd.ย
Structural Engineer: Exon 2000 Ltd.
Mechanical Engineer: Attila Lucz
Civil Engineer: Lรกszlรณ Szรกntรณ
General Contractor:ย ZรรV รpitลipari Zrt and Magyar รpรญtล Zrt
Size: 387,500 sqf (36,000 sqm)
Scheduled Completion Date: 2022
Building cost: 137 million dollars (112 million EUR)
Liget Budapest – part of larger masterplan
AE Interests: gradually curving convex volume, rooftop park, ceramic tile and glass curtain wall that reflect the surrounding city fabric, within City Park, free public access, 60% of structure is underground.
Articles [1,2]
Video [1]
.
The House of Hungarian Music – Budapest, Hungary
Name: The House of Hungarian Music
Location: Budapest, Hungary
Program: Theater/ Concert Hall
Architect: Sou Fujimoto Architects
Project: Liget Budapest
Building Area: 27,641 sqf (2,568 sqm)
Project Year: 2020
Building Cost: ยฃ190 million
Program: Theater/ Concert Hall
AE Interests: floating roof inspired by sound waves punctuated with almost 100 holes for trees, continuous glass curtain wall facade, 120 underground heat pumps provide renewable geothermal energy, natural lighting and ventilation
Articles [1]
Videos [1,2]
.
Musรฉe Atelier Audemars Piguet – Le Chenit, Switzerland



[1,2,3]
Name: Musรฉe Atelier Audemars Piguet
Location: Le Chenit, Switzerland
Architects: Bjarke Ingels Group
Exhibition Design: Atelier Bruckner
Structural Engineer: Dr. Lรผchinger + Meyer Bauingenieure AG
Facade Engineer: Dr. Lรผchinger + Meyer Bauingenieure AG
Mechanical Engineer: Fondation Pierre Chuard Ingรฉnieurs-Conseils SA
Program: Museum
Area: 900 mยฒ
Year: 2020
AE Interests: Main compound of the Swiss watchmaker Audemars Piguet, also used as an exhibition space for product launches, features rooftop landscaping, spiral architecture mimics iconic shape of the watchmaker’s pieces.
Norra Tornen – Stockholm, Sweden



[1,2,3]
Name: Norra Tornen
Location: Stockholm, Sweden
Architects: OMA
Structural, Mechanical, Facade Engineer: Arup
Local Engineer: Sweco
Acoustics: ACAD
Manufacturers: Aluvesto
Client: Oscar Properties
Program: Mostly residential, some services, some retail
Area: 42299 m2
Year: 2013 – Ongoing
AE Interests: High rise apartments with an emphasis on large outdoor space, two buildings: the Innovationen Tower completed already and the Helix Tower currently under construction, 125 and 110 meters tall respectively, remains of a cancelled project by the previous city architect, over 300 luxury apartments, grid-like pattern.
Khor Kalba Turtle and Wildlife Sanctuary – Abu Dhabi, UAE




Name: Khor Kalba Turtle and Wildlife Sanctuary
Location: Abu Dhabi, United Arab Emirates
Architect: Hopkins Architects
Contractor: Hardco Building Contracting
Structural Engineering: e.Construct
MEP Engineering: Al Muhanad Electro-Mechanical Contracting
Year of Completion: 2021
AE Interests: interconnected pods, steel ribs for a robust cladding system, disc concrete foundations, mimics urchin exoskeletons.
TECLA Clay 3D Printed House – Ravenna, Italy




Name: TECLA Clay 3D Printed House
Location: Massa Lombarda, Ravenna, Italy
Architect: Mario Cucinella Architects
Construction: WASP
Engineering & 3D Printing Technology: WASP
Materials Consultant: Mapei
Size: 646 sq. ft.
Year of Completion: 2021
AE Interests: first eco-sustianble housing model 3D-printed from raw earth, local raw soil infilling materials, double dome, multi-printer crane WASP system, 200 hours of printing.
Cloudscape of Haikou – Haikou, China




Name: Cloudscape of Haikou
Location: Haikou, China
Architect: MAD Architects
Contractor: Yihuida Shimizu Concrete
Facade Consultant: RFR Shanghai
Size: 14,854 sq. ft.
Year of Completion: 2021
AE Interests: “biomorphic” public library with cafe and multi-functional spaces, organic concrete form, roof garden, imitates natural erosion and holes created by wildlife.
Viveda Wellness Retreat – Trimbak, India




Name: Viveda Wellness Retreat
Location: Trimbak, India
Address: Shrimant Peshwe, Trimbak, Maharashtra 422212, India
Architect: A for Architecture
Landscape Architect: A for Architecture, Suman Shilp
Size: 41,980 sq. ft.
Year of Completion: 2019
AE Interests: basalt-load bearing walls, timber frames, pot-tile roofs constructed by locals to promote economic opportunity, courtyards for maximum ventilation.
Buhais Geology Park Interpretive Center – Sharjah, United Arab Emirates




[1,2,3,4]
Building: The Buhais Geology Park Interpretive Center
Location: Sharjah, United Arab Emirates
Construction (time): Finished 2020
Architect : Hopkins Architects
Structural Engineer: eConstruct
M&E Engineer: GAJ
Acoustic Consultant: Design Confidence
Main Contractor: Hardco Building Contracting
Specialist Contractor: MARF Steel
Exhibition Design: Ralph Applebaum Associates
Manufacturers: Interface, Jotun, Knauf, Rak ceramics, Abood Saeed Mubarak, Akinco, Al Rathath Insulation, Composure, El Barza, Exceed Precast, ID360, Jenmars Group, MARF Steel, Motive Industries, Powerline Materials Est., Regions Trading, Solera LLC
AE Interest: Made of 5 interconnect pods that very in size, pod design influenced by local fossils, includes an immersive theatre, a cafe, gift shop, and exhibition areas, the pods do not disrupt the geology or terrain below by using prefabricated concrete structures, A place for visitors and researchers to examine local fossils and rocks.
Awards: Building of the Year 2021 Nominee, MasterPrize 2020
Cadre City Plaza – Guangzhou, China

Building: Cadre City Plaza
Location: Guangzhou, China
Architect : Nikken Sekkei LTD, Guangzhou Design Institute, Atkins
Structural Engineer: Atkins
MEP Engineer: Atkins
Landscape Architecture and site sustainability: Atkins
Urban Design team: Atkins
Construction (time): 2016 – 2021
Building height: West Tower (260m), East Tower (182m)
AE Interest: Train station on the first four levels, two towers with office, retail, hotel, and residential space, faรงade design influenced by rock strata
Yangjing Canal Pedestrian Bridge – Pudong, China




Name: Yangjing Canal Pedestrian Bridge
Location: Pudong District of Shanghai, China
Address: Yangjing Harbor, Pudong District, Shanghai, China
Size: 1505 sq. meters
Architect: Atelier Liu Yuyang Architects
Lighting Consultant: Unolai Lighting Design & Associates
Contractor: Shanghai Mechanized Construction Group Co., Ltd.
Project Leader: Atelier Liu Yuyang Architects
Hydraulic Engineering & Structure: Shanghai Municipal Engineering Design Institute Co., Ltd.
Design Team: Atelier Liu Yuyang Architects
Client: Shanghai East Bund Investment Co., Ltd
Year Completed: 2017
AE Interests: Triangular-shaped truss structure. Utilization of bridge’s height variations to accommodate all pedestrians. First slow-traffic bridge in East Bund. Mainly steel structure. Bridge shaped so that flood control wall along river stays intact and its impact on the surrounding industrial buildings nearby are minimized.
Bamboo Hostels – Lishui, China




Name: Bamboo Hostels
Location: Lishui, China
Architect: Studio Anna Heringer
Contractor: Shanghai Kangye Construction & Decoration Co.
Size: 12,411 sq. ft.
Year: 2016
AE Interests: local materials to preserve surrounding ecosystem, bamboo weaving, low-tech structure, mud and bamboo construction, focus on scarcity’s importance in sustainability.
Dornbirn Public Library – Dornbirn, Austria




Name: Dornbirn Public Library (Stadtbibliothek Dornbirn)
Location: Dornbirn, Austria
Address: A-6850 Dornbirn, Schulgasse 44
Architect: Dietrich Untertrifaller Architekten
Builder: Gotzis and Rummele Bau, Wilhelm + Mayer Bau
Electronics: Hecht
Landscaping: Balliana-Schubert
Size: 17,330 sq. ft.
Year of Completion: 2019
AE Interests: lattice facade of prefabricated ceramic books, fixed shading system, wood-aluminum windows with triple glazing, book-inspired interiors.
One Dalton – Boston, Massachusetts



Building: One Dalton
Location: Boston, Massachusetts
Architect: Henry N. Cobb
Structural Engineer: WSP USA
MEP Engineer: WSP USA
Landscape Architecture and Site Sustainability: Michael Van Valkenburgh
Completion year: 2019
๏ปฟ
AE Interest: Designed and registered for LEED silver certification. It has 215 rooms on its lower twenty floors and is used as a hotel. On the forty floors above, it has 174 residential condominiums. The high-rise is in cased in low-reflectance high-performance insulating glass. The podium is composed of granite and glass.
Bosco Verticale – Milan, Italy



Building: Bosco Verticale (Vertical Forest)
Location: Milan, Italy
Architect: Stefano Boeri, BOERI STUDIO
Structural Engineer: ARUP ITALIA
MEP Engineer: DEERNS ITALIA
Landscape Architecture and Site Sustainability: EMANUELA BORIO
Construction: COLOMBO COSTRUZIONI AND ZH CONSTRUCTION COMPANY
Completion year: 2014
AE Interest: Residential tower that has 400 apartments. 2 towers that host about 900 trees. Years of research by botanist and horticulturalist was performed alongside engineers to select the suitable plants and to ensure that the structure could bear the load imposed by them. The trees help moderate temperatures in the building during the winter and summer and help with noise pollution.
Collins House – Melbourne, Australia



[1, 2, 3]
Building: Collins House
Location: 466 Collins St, Melbourne VIC 3000, Australia
Architect: Bates Smart
Structural Engineers: 4D Workshops
Acoustic Consultant: Acoustic Logic Consultancy
Civil Consultant: MA Civil Design
Main Contractor: Hickory Group
MEP Engineer: Murchie Consulting (Meinhardt Group)
Faรงade: BG&E
Client: Golden Age
Completed: 2019
AE Interest:
Australiaโs slimmest tower, built above Markers Mark Building which was built in 1908, H-shape floor plan, footprint is about the size of a single netball court, 16:1 is the height to width ratio.
Articles: [1, 2, 3]
Chicland Hotel – De Nang, Vietnam



[1, 2, 3]
Building: Chicland Hotel
Location: No. 210, Vo Nguyen Giap Street, Phuoc My Ward, Son Tra District, Da Nang
Architect: VTN Architects
Mechanical & Electrical Engineer: NDC Consulting JSCo
Civil & Structural Engineer: SMT Viet Name JSCo.
Main Contractor: Hicon
Completed: 2019
AE Interest:
main material is concrete with greenery system covering it, tree pots integrated into balconies, tropical plants are used, materials used in the interior are from natural or local materials, greenery faรงade creates microclimate for building, making the space cooler.
Articles: [1, 2]
Dixon Water Foundation Josey Pavilion – Decatur, Texas




Name: Dixon Water Foundation Josey Pavilion
Location: Decatur, Texas
Address: 4528 Co Rd 398, Decatur, TX 76234
Architect: Lake Flato Architects
MEP Engineering: TLC Engineering
Structural Engineering: Datum Engineers
Civil Engineering: Biohabitats
Size: 5,400 sq. ft.
Year of Completion: 2014
AE Interests: first “Living Building” project in Texas, deep overhangs, glass pivot doors, flexible spaces, photovoltaic panels, gapped doors for maximum ventilation, 100% of wastewater treated onsite and returned to environment, solar panels.
Son Yang Won Memorial – Haman-Gun, South Korea




Building: Son Yang Won Memorial
Address: Haman-gun, Gyeongsangnam-do, South Korea
Completion Year: 2016
Architects: Lee Eunseok + Atelier KOMA
Structure Engineer: Sen Structural Engineers
Mechanical Engineer: Jusung ENG
Electrical Engineer: Hangil Engineering
Construction: Conerstone Construction
Landscape Design: Yun Youngjo
Client: Son Yang Won Memorial Society
City: Haman-gun
AE Interest:
curvilinear, exposed concrete cylinder structure, closed-off form divorced from external space, and wide open to the sky above and the water space below
Awards:
Architecture Master-prize Winner 2020
Videos: [ 1 ]
—
ICD Brookfield Place – Dubai, UAE




Building: IDC Brookfield Place
Address: Dubai International Financial Centre
Year of completion: 2020
Architect: Foster + Partners
Structural Engineer: Robert Bird Group
MEP Engineer: AECOM
Energy Concept: AESG
Client: ICD Brookfield
City: Dubai
AE Interest:
Reinforced concrete core, steel columns and floor spanning, LEED Gold BD+C, Leed Platinum Core and Shell, 279.1 m / 916 ft high, #37 tallest building in Dubai
Check out the floor plans here!
Awards: Geotechnical Engineering Award 2021 Award of Excellence
101 Warren Street – New York, New York
Building: 101 Warren Street
Address: New York, New York
Completion Date: 2009
Architect: Skidmore, Owings & Merrill (SOM)
Owner and Developer: Edward Minskoff
MEP Engineer: Consentini Associates
Landscape Architect: Thomas Balsey Associates
AE Interests:
Consisting of a podium with a high rise above, structurally made of concrete, Exterior is made of two story stone pillars and floor to ceiling windows creating a rhythmic facade, podium filled with public retail spaces, high rise residents enjoy a park with 101 Austrian Pine Trees, individual units showcase wood floors and high ceilings.
Awards:
2009 : Award of Excellence from AIA – New York State
2005 : Housing Design Award: Citation from AIA – New York City Chapter
VI Castle Lane – London, United Kingdom
Building: VI Castle Lane
Address: London, UK
Completion Date: 2018
Architect: Droo and Name
Developer: Sons and co.
Facade Consultant: ARUP
Structural Engineer: BuroHappold Engineering
AE Interests:
28 apartments and 3 townhomes, brick matches traditional english architecture but layed uniquely to distinguish it from surroundings, steel used to modernize, level 4 code for sustainable living due to a living roof and photovoltaics, new take on bow windows creating a floating space and larger living areas, use of concave and convex glass.
Westin Miyako Chapel – Kyoto, Japan




Name: Westin Miyako Chapel
Location: Kyoto, Japan
Address: Keage, Higashiyama Ward, Sanjo, Kyoto 605-0052, Japan
Architect: KATORI archi+design associates
Contractor: KINSO Inc.
Lighting Design: ModuleX Inc.
Acoustical Design: Naniwa Chiba Acoustics Inc.
Size: 2,551 sq. ft.
Year of Completion: 2020
AE Interests: ceiling timber latticework, wooden louver walls, interwoven lighting resembling sunlight in tree branches, connection to surrounding landscape
Adamant Puebla I – Puebla, Mรฉxico




Building: Adamant Puebla
Address: Atlixcรกyotl 5413, Angeles del Sur, 72820 Tlaxcalancingo, Pue., Mexico
Completion Date: 2013
General Contractor: Milk Life Investments
Design Architect: Mayer Hasbani
Structural Engineer: McMilan
MEP Engineer: JPR
Landscape Architect: DLC Architects
AE Interest:
Multifamily mixed use residential building with a shopping center in the podium. 20,000 mยฒ (215,278 ftยฒ) of housing. Balcony views don’t cross, increasing tenant’s privacy. Leading project in sustainability, located in the most important area of development in the city. Facade made out of granite & glass, making the building look like a statue.
23 Marina – Dubai, UAE




Building: 23 Marina
Address:ย ย Dubai, UAE
Completion Date: 2012
Developer: Hicron International
Design Architect:ย Hafeez Contractor
General Contractor: KEO International Consultants
Consultant: Hafeez Contractor
Structural Engineer: KEO International Consultants
Wind Engineer: RWDI
AE Interest:
Strictly residential building with an architectural height of 1288.71 ft. 89 floors above ground & 4 floors below ground. Cost $298,300,000 to construct. Shaped like a pencil. Has 57 swimming pools. Tallest residential building in the world & third tallest building in the Middle East at time of completion.
Brunel Building – London, United Kingdom





Building Name: Brunel Building
Location: London, United Kingdom
Architects: Fletcher Priest Architects
Structural / Geotechnical Engineer: ARUP
M & E Consultant: Cundall
Quantity Surveyor: Arcadis
Faรงade Specialist: ARUP
Main Contractor: Laing O’Rourke
Landscape: Plincke / Barton Willmore
Project Manager: Gardiner & Theobald
AE Interest: Steel exoskeleton, column-free internal spaces, inclined columns and braces carry the weight of the building, external shading, aquifer thermal energy storage, BREEAM 2014 Excellent & Wired Platinum, targeting LEED Gold.
One Central Park โ Sydney, Australia





Project: One Central Park
Location: Sydney, Australia
Year: 2014
Architects: Ateliers Jean Nouvel / PTW Architects
Builder: Watpac Construction
Structural Engineer: Robert Bird Group
Podium & Towers Services: ARUP
Civil Engineers: Hughes Trueman
Light Artist: Yann Kersalรฉ
Green Wall Designer: Patrick Blanc
AE Interest: Vertical landscape, natural sun control, heliostat, beneficial use of the sun, natural light.
BIT Sports Center โ Beijing, China




Building: BIT Sports Center
Address: Liangxiang, Beijing, China
Completion Date: July 2019
Design Architect: Atelier Alter Architects
Executive Architect & Sustainability Lead: China IPPR International Engineering
Structural engineer: China IPPR International Engineering
MEFP Engineer: China IPPR International Engineering
General Contractor: Beijing Construction Engineering Group
Landscape design: China IPPR International Engineering
Curtain Wall Consultant: PAG Faรงade Systems
Acoustical Engineer: China IPPR International Engineering
Lighting Consultant: Jingyunyoujin Lighting Technology
AE Interests:
Sports Complex for University, 10 Lap Swimming Pool, Basketball court with 3000 seat stands, 3 double curvature surfaces for the roof. Natural Lighting through Skylights, 15,692 square meters, $23.5 million
La Tour โ Aarhus, Denmark




Building: La Tour
Address: Aarhus, Denmark
Completion Date: 2020
Design Architect: 3XN Architects
Executive Architect & Sustainability Lead: 3XN Architects
Structural engineer: Rambรธll A/S
MEFP Engineer: Rambรธll A/S
Developer: JRP
AE Interests:
Semicircular shape Tower, Low Cost Housing for Students, 300 units, Private Balcony for each Unit, 2nd Tallest Building in Aarhus, Form is inspired to connect with the neighboring Historic Water Tower, 22,671 square meters
Friendship Hospital Satkhira – Shyamnagar Upazila, Bangladesh




Name: Friendship Hospital Satkhira
Location: Shyamnagar Upazila, Bangladesh
Architect: Kashef Mahboob Chowdhury
Contractor: Hasan and Sons
Structural Engineering: Zayedur Rahim
Electrical Engineering: Zafar Ahmed
Plumbing Engineering: Prodip Kumar Haldar
Size: 36,457 sq. ft.
Year of Completion: 2018
AE Interests: courtyards for natural ventilation, water harvesting systems, local handmade brick construction, green roofs, embankment with water run-off pumping system to combat local flooding, slots in brick facade for additional wind ventilation, canal and glass windows to reflect natural sunlight into rooms.
Lansingerland-Zoetermeer Station – Zoetermeer, Netherlands




Building: Lansingerland-Zoetermeer Station
Address: Lansingpad, 2718 RM Zoetermeer, Netherlands
Completion Date: 2019
Client: Municipality of Zoetermeer
Architects: Team V Architecture & Arcadis
Structural Engineer: Arcadis
General Contractor: VOBI
Geotechnical Analysis: Arcadis
Landscape Architect: Team V Architecture & Arcadis
Concrete Suppliers: Concrete Valley & mbX
AE Interest:
Intersection of railway lines, light rail, bus routes, motorway, and bike lanes. 11,000 m2 of total space.
Designed with ability to expand. Natural appearance. Mimics nearby cityscape with specialized concrete โbranchesโ. Tall and inviting waiting areas. Natural stone, wood finishes, and lit primarily by daylight. Open green spaces and clear sightlines for passenger ease.
Awards:
2020 Winner Gemma Smid Architectuurprijs (local architecture award), 2019-2020 Included in Architecture in the Netherlands Yearbook, 2020 Shortlisted Blue Print Awards, category โBest Public-Use Project โ Public Funding, 2019 Shortlisted Betonprijs (Dutch Concrete Award)
Rainier Square Tower – Seattle, Washington




Building: Rainier Square Tower
Address: 1340 4th Avenue Seattle, Washington
Completion Date: 2020
Developer: Wright Runstad & Company
Architect: NBBJ
Structural Engineer: Magnusson Klemencic Associates
MEP Engineer: MacDonald-Miller
General Contractor: Lease Crutcher Lewis
Geotechnical Analysis: Hart Crowser
Steel Contractor: Supreme Group
AE Interest:
Second tallest building in Seattle. 59 stories (850 ft tall). Office, Retail, and residential spaces. Curved curtain walls and sloping floors. Pays homage to neighboring buildings and local environment. Solar positioned steel prisms to increase energy efficiency. Bends to preserve views of and from building next door. New composite โSpeedcoreโ made of 536 panels. Structure completed in 10 months at reduced cost. Anchored secant-pilled shoring wall at base. Performance based seismic design.
Greenhouse Orchid – Punta del Este, Uruguay




Name: Greenhouse Orchid
Location: Punta del Este, Uruguay
Architect: Mateo Nunes Da Rosa
Landscaping: Elena Artagaveytia
Size: 215 sq. ft.
Year of Completion: 2021
AE Interests: “double envelope” walls, outer wall to direct wind, inner wall to stop direct sunlight and create bright environment for plants, retractable roof for ventilation
McKinney & Olive – Dallas, Texas




Building: McKinney & Olive
Address: 2021 McKinney Ave, Dallas, TX 75201
Design Architect: Pelli Clarke Pelli Architects
Associate Architect: Kendall/Heaton Associates, Inc.
Developer:ย Crescent Real Estate
General Contractor:ย Beck Group
Structural & Faรงade Engineer: Childress Engineering Services
MEP Engineer & Sustainability Lead: I.A. Naman + Associates, Inc.
Landscape Architect: Office of James Burnett (OJB)
Envelope, Roofing, & Waterproofing: Curtainwall Design Consulting (CDC)
Acoustical Design: Integrated Interiors, Inc.
AE Interests:
262.69 ft tall office building, 585,000 sf area, LEED Gold designation, 20 stories with a high-efficiency curved glass curtainwall faรงade slanted 9ยฐ outward, green building energy and environmental systems, cast-in-place concrete structure (two-way flat plate), mixed-use space on ground level, parking garage shaded by prefabricated perforated steel panels, rooftop garden on parking structure
.
Peak Galleria – Hong Kong, China




Building: Peak Galleria
Location: 118 Peak Road (R.B.L.N. 3), Hong Kong, China
Architect: Aedas
Developer:ย Hang Lung Properties
General Contractor & Engineer:ย Hien Lee Engineering
Lighting Consultant: Lightswitch
AE Interests:
251,843 sq ft building renovation, recipient of 2020 Architecture Masterprize, curvilinear gridshell glass curtain wall faรงade with integrated LED lighting system. Skylights and glazing panels retrofitted with protective thermal insulation film. All faรงade steel elements prefabricated with CNC machine to fit complex joint geometry
.
‘Pierre Bottero’ Media Library and Park – Pรฉlissanne, France
Building: ‘Pierre Bottero’ Media Library and Park
Location: Pรฉlissanne, France
Project Management: Dominique Coulon & associรฉs
Architects: Dominique Coulon, Jean Scherer
Demolition and Modeling: COSEPI France
Structural Engineer: Batiserf Ingรฉnierie
Mechanical and Electrical Engineering: BET G. Jost
Cost Control and Monitoring: E3 Economie
Landscape: Bruno Kubler
Acoustician: Euro Sound Project
Roads and Utilities: Lollier Ingรฉnierie
Construction: 2017-2020
Cost: โฌ3,336,000, or US $4,048,000
AE Interests: Preserves historic landscape and building, merges indoor with outdoor, immense natural light, blends old and new materials seamlessly
Awards: 2020 Architecture Masterprize Winner in Cultural Architecture
Videos: [ 1 ]
Solstice on the Park – Chicago, Illinois


Building: Solstice on the Park
Location: Chicago, Illinois
Address: 1616 East 56th Street
Design Architect: Studio Gang Architects
Architect of Record: Studio Gang Architects
Structural Engineer: ARUP
General Contractor: Linn-Mathes, Inc.
MEP Engineer: WMA Consulting Engineers (Salas OโBrien)
Concrete Contractor: Adjustable Forms, Inc.
Mechanical/Plumbing Contractor: Ewing Doherty
Facade Material Developer: Rieder
Height: 87.3m (286.3 ft)
Completed: 2018
Energy Label: Green Globes Certified
AE Interests: ย Constructed using Design-Build construction method, concrete structure, makes use of โsolar carvingโ โ a technique that explicitly shapes the building to respond to the solar patterns of its geographic location, exterior clad in low-energy natural glass-fiber reinforced concrete panels
Arena Tower – London, United Kingdom



Building: Arena Tower/Baltimore Tower
Location: London, United Kingdom
Address: 25 Crossharour Plaza, London Borough of Tower Hamlets
Architect: Skidmore, Owings & Merrill (SOM)
Structural engineer: WSP
Material supplier: Doka GmbH
Construction: 2013-2016
Height: 489 ft, 45 stories
AE Interests: 366 residential units, all units have cantilevered balconies that are elliptical in plan, the balconies vary in size and rotate slightly as levels rise to create the tower’s distinctive flowing twist, building shape offers solar shading for each level,
Videos [ 1 ]
Oklahoma Contemporary Arts Center – Oklahoma City, Oklahoma



Building: Oklahoma Contemporary Arts Center
Location: Oklahoma City, Oklahoma
Address: 11 NW 11th St, Oklahoma City, OK 73103
Architect: Rand Elliott, FAIA
Company: Rand Elliott Architects
Client: Oklahoma Contemporary
Civil Engineer: CEC
MEP Engineer: Alvine & Associates, Inc.
Structural Engineer: Wallace Engineering
General Contractor: Smith & Pickel Construction, Inc.
Theater Consultant: Schuler Shook
Acoustics: Audio Video Designs
Construction Cost: $26 M
Size: 53,916 sq. ft
AE Interests:
4 stories, irregular braced steel frame, exterior constructed from bright-dipped anodized aluminum causing the building to capture the ever-changing weather conditions by reflecting the changes in light and sky, this design feature is why the building is called “folding light,” consists of 16,800 custom designed extruded aluminum fins extending from the ground to the roof
Videos [ 1 ]
100 Above the Park โ St. Louis, Missouri



Building: 100 Above the Park
Location: St. Louis, Missouri
Address: 100 Kingshighway Blvd, St. Louis, MO 63108
Developer: Mac Properties
Architect: Studio Gang
Owner: Silliman Group
Builder/Contractor: Clayco
Exterior Wall Consultant: Studio Nyl
Size: 540,369 sq. ft.
Year Completed: 2020
AE Interests: Green Globe Certified, leaf-shaped plan, green roof rainwater storage, overlooks Forest Park, scalloped faรงade, tilted glazing, tallest residential building in St. Louis
Aalto University Vรคre Building โ Espoo, Finland




Name: Aalto University Vรคre Building
Location: Espoo, Finland
Address: Otaniementie 14, 02150 Espoo, Finland
Architect: Verstas Architects
Project Management Consultant: A-insinรถรถrit Rakennuttaminen Oy
Construction Manager: SRV Construction Ltd
Structural And HVAC Engineer: SitoWise Oy
Foundation Engineer: A-insinรถรถrit Suunnittelu Oy
Electrical Engineer: Rejlers Oy
Civil Engineer: Ramboll Oy
Size: 45400 mยฒ
Year Completed: 2018
AE Interests: energy A-rated building, 90% self-sufficient in heating and cooling, built above the University underground station, designed to keep a comfortable “village” feel, rooms are arranged around interior courtyards, red brick faรงade similar to the original university buildings
Jade Signature – Miami, Florida, USA





Building: Jade Signature
General Contractor: Suffolk
Design Architects: Herzong & de Meuron
Interior Designer: PYR & Pierre-Yves Rochon
Civil Engineering: VSN Engineering
Structural Engineer: McNamara & Salvia
MEP Engineer: Edwards & Zuck
Landscape Architect: Raymond Jungles Inc
AE Interests: This 636 foot tall residential tower is oriented on the beaches of Miami and designed to respect and represent just that. The tower is oriented diagonally and shaped like a parallelogram (seen in photo 4) to allow the beach to have maximum sun exposure while the sun is to the western side of the building. The overall design of the building is praised for its open nature design giving the overall feeling of a โhotel at the beach,โ rather than the presence of a โbeach at the hotel,โ that is present with other structures in the area that obstruct the natural beauty of the landscape.
Manufacturing Technology and Engineering Center – Chicago, IL





Developer: Public Building Commission of Chicago
General Contractor: Old Veteran Construction
Lead Design Firm: JGMA
Design Architect: Juan Moreno
Structural & MEP Engineer: Cannon Design
Civil Engineer: David Mason and Associates
Landscape Architect: Terry Guen Design
Lighting Consultant: Aurora Lighting Design
Year completed: 2019
AE Interests:
A complete remodel and repurposing project. This project takes an existing parking structure and creates a collaborative work space and pathway for students through campus. The buildings design allows onlookers to have a clear view into the manufacturing technology and exhibits the sophistication of the manufacturing practices of today.
Video [1 (JGMA)]
Triodos Bank – Driebergen-Rijsenburg, The Netherlands




Name: Triodos Bank
Location: Driebergen-Rijsenburg, The Netherlands
Address: De Reehorst, Hoofdstraat 10, 3972 LA Driebergen-Rijsenburg, The Netherlands
Architect: RAU Architects
Structural Engineer: JP Van Eesteran
Landscape Architect: Arcadis
Engineering Consultant: Aronsohn
Size: 139,867 sq. ft.
Year of Completion: 2019
AE Interests: “wooden cathedral”, laminated timber, reconstructible, circular and sustainable architecture, first temporary material bank, screwed together with 100% potential dismantlement at any point without loss of value, materials, or components.
Video: [1]
The Dock Building โ Vancouver, Canada




[1,2,3,4]
Name: The Dock Building
Location: Vancouver, Canada
Architect: MG Architects
Builder: Heatherbrae Builders
Civil Engineer: Heatherbrae Builders
Mechanical Engineer: AME Consulting Group
Structural Engineer: Equilibrium Consulting
Envelope Consultant: RDH Building Science
Engineered Wood Supplier/ Fabricator: FraserWood Industries, Western Archrib
Project Owner: Royal Vancouver Yacht Club
Size: 4,000 sqft
Cost: $10k
Year of Completion: 2017
AE Interests: low budget, uses a mirror wedge design to honor marina buildings from half a century ago, while still looking modern
Articles: [1,2,3]
The Indeed Tower โ Austin, TX




[A,B,C,D]
Name: The Indeed Tower
Location: Austin, TX
Architect: Page Southerland Page
Structural Engineer: Thornton Tomasetti
Developer: Trammell Crow Company
Contractor: DPR
Construction Firm: PERI Formwork Systems
Partner: Principal Real Estate Investors
Size: 709,000 sq ft
Year of Completion: 2021
AE Interests: features floor to ceiling visible glass, 9 building terraces, column free corners (LEED gold certified).
Video: 1
Kadokawa Culture Museum – Tokorozawa, Japan




Name: Kadokawa Culture Museum
Address: Japan, ใ359-0023 Saitama, Tokorozawa, Higashitokorozawawada, 3 Chomeโ31็ชๅฐ3 ใจใใใใใตใฏใฉใฟใฆใณ
Architect: Kengo Kuma and Associates
Construction: Kajima Corporation
Completion Date: 2020
AE Interests: Granite facade of 20000 individual pieces, 40 meters tall, five floors, double height library, projection mapping turns bookshelves into theater, cafes, shop, galleries, outer wall of reinforced concrete.
Laborde – Paris, France




Building: Laborde
Location: Paris, France
Address: 5 Rue de Laborde, 75008 Paris, France
Completion Date: 2018
Architect: PCA-STREAM
General Contractor: Eiffage
Structural Engineer: Khephren
Faรงade Engineer: GOYER and VS-A
AE Interests: Restoration, mixed-use, biodiversity, sustainability, courtyards, glass faรงade, acoustics design, green spaces, rainwater management, low-VOC materials, horizontal circulation design
Videos: [1]
.
Texas Tower (T2) – Houston, Texas




Building: Texas Tower
Height: 735 feet (47 levels)
Location: Houston, TX
Address: 845 Texas Avenue, Houston, TX, 77002
Completion Date: Expected in late 2021
Architects: Pelli Clarke Pelli
Developers: Hines and Ivanhoe Cambridge
General Contractor: Gilbane
AE Interests: LEED Platinum, WiredScore, and WELL Building Standards, 10′ full-height windows, underfloor HVAC systems, cantilevered bays, outdoor green space and rooftop terraces, concrete, tunnel system
.
House of Wisdom – Sharjah, United Arab Emirates




Name: House of Wisdom
Location: Sharjah, United Arab Emirates
Address: Al Juraina 1, Sharjah, United Arab Emirates
Architect: Foster + Partners
Structural Engineering: Aurecon
Light Engineering: Delta
Landscape Architect: Cracknell
Size: 139,931 sq. ft.
Year of Completion: 2021
AE Interests: cantilevered roof, overhang provides shade throughout all hours of the day, fixed aluminum screens for additional shading of low sun, adjustable bamboo screens.
ARO – New York, New York




Building: ARO
Address: 242 W 53rd St. New York, New York
Owner: Algin Management
Architect: CetraRuddy Architecture
Structural Engineer: DeSimone Consulting Engineers
MEP Engineer: Cosentini Associates
Main Contractor: Pavarini McGovern
Size: 540,000 sq. ft., 62 stories
Year Completed: 2018
AE Interests:
Residential, high-rise, cast-in-place concrete, load-bearing precast concrete walls, steel-framed faceted roof slab, curved edges, glass curtain wall, steel lattice “net”
Shum Yip Upperhills Tower 1 – Guangdong, China


[1, 2]
Building: Shum Yip Upperhills Tower 1
Location: Guangdong, China
Architect: Skidmore, Owings, Merrill
Structural Engineer: Skidmore, Owings, Merrill
MEP Engineer: Skidmore, Owings, Merrill
Main Contractor: China State Construction Engineering Corporation
Material Supplier: Jotun
AE Interests:
Reinforced concrete core, concrete filled steel columns, large glass panes, ladder system
Telus Sky – Calgary, Alberta




Building – Telus Sky
Location: Calgary, Alberta
Address: 619 Centre St S, Calgary, AB T2G 2C7, Canada
Developer: Westbank Projects Corporation
Electrical and Mechanical: Integral Group
Formwork Supplier: Doka GmbH
Structural: Glotman Simpson Group
Wind Surveyor: Gradient Wind Engineering
Completion: 2020
Certification: LEED Platinum
Cost: $400 million
Space: 761,235 square feet
AE Interests: 59-stories tall, third tallest building in Calgary, creates lively mixture of living and working in heart of the city, large office floor plates recede as it reaches residential portion to create feminine figure, modular type residential spaces create balconies, garden atop, encourages human interaction, LED lighting creates beacon at night
South Haven Centre for Remembrance — Edmonton, Alberta




Building: South Haven Centre for Remembrance
Location: Edmonton, Alberta
Address: 5004 Meridian St NW, Edmonton, AB T6P 1R3, Canada
Architect: SHAPE Architecture
Collaborators: Group2 Architects, PECHET Studio
Structural Engineering: Fast + Epp
Electrical: Arrow Engineering
Landscape: Design North Landscape Architecture
Civil Engineering: V3 Companies
Mechanical: Clark Engineering
Contractor: K-Rite Construction
Sustainability: Sรฉbastien Garon (Made it LEED Certified)
Awards: 2020 Governor General’s Medal in Architecture, Architecture MasterPrize in Cultural Design
Cost: $4.4 million
Size: 7,000 sq. ft.
Year of Completion: 2019
AE Interests: 13 meter tall tower, non-denominational cemetery facility, black materials such as steel panels and charred shou sugi-ban acoya in contrast to the white winter landscape and interior, based a lot off lighting specifically on summer solstice, tower clerestory that allows light from the north for meeting rooms and a view of downtown Edmonton, partially submerged
Fenix I – Rotterdam, Netherlands




Building: Fenix I
Location: Rotterdam, Netherlands
Architects: Mei Architects and Planners
Structural Engineer: ABT Delft
Construction: ABT Delft
Steel Construction: CSM Steel Structure
Installation Consultant: Techniplan Advisers
Building Physics Consultatn: LBP | Sight
AE Interest: This structure was built on top of an old warehouse that was already in sight. As shown in the last image, there had to be steel structure installed right through the ware house in order for it to stand.
Merdeka PNB118-Kuala Lumpur, Malaysia




Building: Merdeka PNB118
Location: Kuala Lumpur, Malaysia
Completion: 2022
Architect: Fender Katsalidis Architects
Structural Engineer of Record: Arup
Structural Engineer Design: Robert Bird Group
Civil: Arup
Height: 2,113ft (tip) / 1,640ft (Occupied)
Floors: 118 (Above Ground)
AE Interest: Upon completion, it will be the second tallest building in the world. It will share the city with the Petronas twin Towers. The shape of the building was designed to resemble the silhouette Tunku Abdul Rahman when he lifted his right hand and chanted Merdeka which means freedom. The events was when he declared freedom for Malaysia, one of the most important moments in the country.
Videos: [1]
Aemulus at the Runway – Bayan Lepas, Malaysia




Name: Aemulus at the Runway
Location: Bayan Lepas, Malaysia
Architect: Design Unit Architects Sdn Bhd
General Contractor: MLG Design and Construction Sdn Bhd
Mechanical and Electrical Engineering: HPM Consultant
Landscaping: Landarc Associates Sdn Bhd
Size: 101,235 sq. ft.
Year of Completion: 2020
AE Interests: brick fin openings, perforated brick walls for shade from heat gain, narrow ventilation slots under roof for rising hot air, oriented away from direct sunlight, angled brick to prevent glare, insulated roof garden, overhanging roof for shade.
Tower C – Shenzhen, China



Name: Tower C at Shenzhen Bay Super Headquarters Base
Location: Shenzhen, China
Architect: Zaha Hadid Architects
Construction Period: 2020-2027
Site Area: 36,268 sq. m.
Gross Floor Area (GFA): 440,000 sq. m.
AE Interests:
Around 400 meter tall, includes hotel-dining-office space-shopping-convention center-galleries, double insulated unitised glass curtain walls, natural and hybrid ventilation with environmental control for each floor, water-collection and recycling and photovoltaics to harvest solar energy, aquaponics gardens, pending start of construction
The Zayed Centre – London, UK

Name: Zayed Centre for Research into Rare Disease in Children
Location: London, United Kingdom
Architect: Stanton Williams
Structural Engineer: Pell Frischmann
Contractor: Skanska UK
Manufacturers: KEIM, Feldhaus Klinker
Project Manager: Gardiner & Theobald
Faรงade Consultant: Eckersley OโCallaghan
Area: 141,000 sq. ft.
Completed: 2019
AE Interests:
First purpose built pediatric center, large sky-lit atrium w/oak staircase, glass and terra cotta facade, impressive finned terra-cotta screen shielding glass walls, 8-story concrete structure, post-tensioned slab with wide spans, moving interactive sculpture in the main entrance, visible laboratories from all sides
Video [1]
Torch Tower – Tokyo, Japan



Name: Torch Tower
Address: 1 Chome Marunouchi, Chiyoda City, Tokyo 100-0005, Japan
Architects: Sou Fujimoto Architects and Mitsubishi Jisho Sekkei, Inc.
Developer: Mitsubishi Estate
Expected Completion Date: 2028
AE Interests: 390 meters tall, 31400 square meter site area, 63 floors, 100 room hotel on top floors, shops, restaurants, 2000 seat grand hall, bathhouse, semi-outdoor hill-like plaza, connected to Tokyo Station and Tokiwabashi Tower as part of urban development plan called โTokyo Torchโ, views of Tokyo and Mount Fuji, set to become Japanโs tallest building, best seismic resistance in Japan.
VanDusen Botanical Garden – Vancouver, Canada




Name: VanDusen Botanical Garden
Location: Vancouver, Canada
Address: 5251 Oak St, Vancouver, BC V6M 4H1, Canada
Architect: Perkins & Will
General Contractor: Ledcor Construction
Structural Engineering: Fast + Epp
Civil Engineering: R. F. Binnie & Associates
MEP Engineering: Integral Group
Landscape Architect: Sharp & Diamond
Acoustic Consultant: BKL Consultants
Certifications: LEED Platinum, Living Building Challenge Petal
Size: 19,483 sq. ft.
Year of Completion: 2011
AE Interests: organic undulating roof form, “glulam” post-and-beam assembly to support curved roof, natural ventilation through solar chimney that converts rays of light into convection energy, blackwater treatment on site to support biodiversity, uses renewable resources to achieve net-zero energy.
Phoenix Central Park – Sydney, Australia




Project: Phoenix Central Park
Location: Sydney, Australia
Architect: John Wardle Architects (gallery), Durbach Block Jaggers (performance space)
Structural Engineer: Taylor Thomson Whitting
Geotechnical Engineer: Pells Sullivan Meylink
Completed: 2019
AE Interests:
Concrete gallery walls, timber performance space walls, 5 stories, linking nature and art, multiple gardens, large and small spaces, flexibility in functions, geometric skylights, complex volumes connected by stairs and bridges
50 Hudson Yards – New York, New York




Project: 50 Hudson Yards
Location: New York, New York
Architect: Foster + Partners, Adamson Associates Architects
Structural Engineer: WSP
MEP Engineer: WSP
Geotechnical Engineer: Mueser Rutledge Consulting Engineers
Expected completion: 2022-2023
AE Interests:
1010 feet tall, 58 story office building, underground retail center, direct access to No. 7 subway station, 4 story โglass boxesโ, LEED Gold (targeted), flexible office space, 2 terrace levels, 45โ spans, 2.9 million gross square feet, multiple “sky lobbies”
Totzeret HaAretz (ToHa) Towers Phase 1 – Tel Aviv, Israel



Building: Totzeret HaAretz (ToHa) Towers Phase 1
Location: Tel Aviv, Israel
Completion Date: 2019
Architects: Ron Arad Architects, Yashar Architects
Consultant Structural Engineers: Buro Happold, David Engineers
Landscape Architects: VOGT, TeMA
Manufacturers: Cosentino, Guardian Glass, Digom, Pellini Industries
AE Interest:
53,000 sq. meters, inspired by iceberg, small footprint on ground, widens in middle, plaza on ground floor, floor plan varies for all 28 floors, lower levels clad in knitted design Dekton for ventilation and structure, MEP on lower floors, energy saving and intelligent facade system, LEED Platinum certification, the first of two future conjoined towers, second tower expected to be completed by 2024
Videos: [1]
.
139 Schultz – Mexico City, Mexico



Building: 139 Schultz
Location: Mexico City, Mexico
Completion Date: 2018
Architect: CPDA Arquitectos
Structural Engineer: Humberto Girรณn
Construction: MOCAA Arquitectos
Lighting Design: Luz y Forma
Manufacturers: Cemex, Corev, Grupo Sar, Interceramic, Novaceramic
AE Interest:
2800 sq. meters, 2 levels of parking at base, 5 levels of apartments above, made of local materials, double skin exterior: inner layer red brick, outer layer/screen tinted concrete, external screen mitigates solar heat gain and promotes privacy, variety of light wells, terraces, balconies, outdoor stairs to help bring in natural light and ventilation
.
Commercial Bay Tower – Auckland, New Zealand




Name: Commercial Bay Tower
Location: Auckland, New Zealand
Address: 7 Queen Street, Auckland Central, Auckland 1010, New Zealand
Architects: Wood Bagots, Warren & Mahoney
Contractor: Fletcher Construction Company Limited
Structural Engineer: Holmes Consulting LP
Faรงade Engineer: Mott McDonald Group
Developer: Precinct Properties
Completed: 2020
Floor Area: 45,2084 ft sq
AE Interests: The office tower is New Zealand’s most sustainable high-rise office building and currently holds a 5 Star Green Building and Green Star Design Rating, High-performance glazing was specified to include a ceramic frit below the low-E coating
School of Design and Environment 4 – Singapore, Singapore




Name: School of Design and Environment 4
Location: Singapore, Singapore
Address: 8 Architecture Dr, Singapore
Architect: Multiply Architects, Serie Architects, Surbana Jurong
Construction: Furukawa, Hirata Corporation
Electrical Engineer: Surbana Jurong
Mechanical Engineer: Surbana Jurong
Landscaping and Farming: Surbana Jurong
Structural Engineer: Surbana Jurong
Civil Engineer: Surbana Jurong
Size: 92,440 sq ft
Year of Completion: 2019
AE Interests: The climate-responsive building includes more than 1,500 square meters of design studio space, a 500 square-meter open plaza; a wide variety of public and social spaces; workshops and research centers; a new cafรฉ and a library.
Pasona Urban Farm – Tokyo, Japan




Name: Pasona Urban Farm
Location: Tokyo, Japan
Address: 2 Chrome-6-4 Otemachi, Chiyoda City, Tokyo 100-0004, Japan
Architect: Kono Designs
Construction: Furukawa, Hirata Corporation, NOYU SHA
Electrical Engineer: Iwasaki Electric
Landscaping and Farming: Kono Designs
Size: 215,000 sq. ft.
Year of Completion: 2010
AE Interests: “double-skin” green facade, indoor farm, rooftop garden, hydroponic and soil-based farming, achieves “zero food mileage,” curtain wall system




















































































































































leave a comment